National Repository of Grey Literature 1,472 records found  beginprevious1460 - 1469next  jump to record: Search took 0.01 seconds. 
Technological stage of realization floors of housing building
Kajzarová, Jitka ; Ing.Lukáš Kopecký (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis deals with the construction and the technological phase of the implementation of floors in an apartmant complex „Sladké město“, located in northwestern suburbs of the town of Olomouc. The main part of the work are technological regulations for self-leveling floor and the floor of the anhydrite. Further, the bachelor thesis deals with the situation of wider relations, principles of organization of construction, suggestion of machine composition, inspection and test plan, healt and safety at work and itemized budget with the time schedule.
Production hall for container manufacturing in Vranovice - technological stage of upper rough construction
Velešík, Josef ; Čech, David (referee) ; Henková, Svatava (advisor)
The work addresses the technological stage of crude steel superstructure type LLENTAB hall. Technological phase includes the installation of anchor blocks to gridiron pilot installation of structural steel, installation of ceiling panel, installation of cladding roofs and walls of buildings.
The family house Ochoz u Brna, construction and technological stage gross substructure
Jakubcová, Monika ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
This bachelor’s thesis is focused on technological execution of lower gross construction of family house in Ochoz u Brna. The content of this work is technological execution, solution to site equipment, scheduling, budget, design of machinery, checking and test plans, safety and protection of environment during execution relevant stage.
Technological Solutions of GUVEX Company’s Cladding Annexe in Lanškroun
Strnadová, Lenka ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
This bachelor thesis deals with the technological solution of cladding annex of an administrative nature and warehouse space. This is specifically about using lightweight cladding. The paper includes technological regulation, schedule, bill of quantities, budget, organization of construction principles and ensuring the quality requirements.
KIC Zašová stage of carcass superstructure
Janíček, Jakub ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
The subject of work is the solution of stage gross superstructure of cultural and information center in Zašová. The work includes construction technology report, technological instruction mounted skeleton, building equipment, budget, time scheduling, work safety, environmental protection, control and test plans, addressing broader transport relations and proposing an appropriate mechanical assemblies.
The terrace house Omice - gross bottom construction
Němec, Lukáš ; Klempa, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is focused on the technological stage of the lower gross building terraced house in Omice. Part of the thesis is technical report the work site facilities, technical regulations, inspection and test plans, reports the machine design, plan of safety and protection of health and environmental, budget and timetable.
Construction of a multipurpose building superstructure
Holubová, Jolana ; Věrný, Luboš (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution phase construction of a multipurpose building superstructure in Lanškroun. The study deals with the use different types of structures and economic terms, technological specifications, occupational safety, quality of the implementation and time plan of the building. The basis for the development of the project was the partial implementing documentation of the building.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Solving the phase of floors of an apartment house in Brno
Meluzínová, Lucie ; Čech, Josef (referee) ; Hrazdil, Václav (advisor)
Subject of this thesis is the phase of floors in apartment house in Brno. This thesis contains technical reports, statement measurement, technological specification, site equipment, scheduling, mechanical assembly design, monitoring and test plans, budgeting, safety work and environmental protection.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.

National Repository of Grey Literature : 1,472 records found   beginprevious1460 - 1469next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.