National Repository of Grey Literature 1,252 records found  beginprevious1243 - 1252  jump to record: Search took 0.01 seconds. 
Assembly hall in Třemošná - technological stage of the gross superstructure
Beránek, Jan ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This bachelor’s thesis „technological stage of the gross superstructure of Assembly hall in Třemošná“ is generaly construction-technological solution of building. This work contains exactly technological specification, technical reports, site equipment, mechanical assembly design, scheduling, budgeting,monitoring and test plans, safety and environmental protection.
Production hall for container manufacturing in Vranovice - technological stage of upper rough construction
Velešík, Josef ; Čech, David (referee) ; Henková, Svatava (advisor)
The work addresses the technological stage of crude steel superstructure type LLENTAB hall. Technological phase includes the installation of anchor blocks to gridiron pilot installation of structural steel, installation of ceiling panel, installation of cladding roofs and walls of buildings.
The family house Ochoz u Brna, construction and technological stage gross substructure
Jakubcová, Monika ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
This bachelor’s thesis is focused on technological execution of lower gross construction of family house in Ochoz u Brna. The content of this work is technological execution, solution to site equipment, scheduling, budget, design of machinery, checking and test plans, safety and protection of environment during execution relevant stage.
Residential house Jihlava-technological phase of construction site
Novák, Jan ; Mesiarkin, Jan (referee) ; Henková, Svatava (advisor)
The subject of my bachelor´s thesis is to implement the rough upper construction of residential house in Jihlava. Processing Technology in detail the rules for building and assembly of prefabricated panels SPIROLL. It also contains a technical report, technical report building equipment, building equipment, mechanical assembly design, safety and environmental protection, inspection and test plan, schedule, itemized budget and the export ceiling panels SPIROLL.
KIC Zašová stage of carcass superstructure
Janíček, Jakub ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
The subject of work is the solution of stage gross superstructure of cultural and information center in Zašová. The work includes construction technology report, technological instruction mounted skeleton, building equipment, budget, time scheduling, work safety, environmental protection, control and test plans, addressing broader transport relations and proposing an appropriate mechanical assemblies.
The terrace house Omice - gross bottom construction
Němec, Lukáš ; Klempa, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is focused on the technological stage of the lower gross building terraced house in Omice. Part of the thesis is technical report the work site facilities, technical regulations, inspection and test plans, reports the machine design, plan of safety and protection of health and environmental, budget and timetable.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Realization of technological steps gross upper building construction of ski facilities in Kouty nad Desnou
Jandová, Renáta ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis concerns two technological phases of roughly build upper building of ski areal in Kouty nad Desnou. The building serves as a dinning and bowling centre. In particular there are three restaurants. The object is located in the centre of the village, under the ski slope. It will be used all over the year ass entertaining centre. The building has one floor bellow and two above the ground. The construction is made like monolithic core structure with Porotherm brick blocks. The individual technological phases focus on the vertical supporting constructions in second floor and monolithic ferroconcrete roof above second floor. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making vertical supporting walls.
Solving the phase of floors of an apartment house in Brno
Meluzínová, Lucie ; Čech, Josef (referee) ; Hrazdil, Václav (advisor)
Subject of this thesis is the phase of floors in apartment house in Brno. This thesis contains technical reports, statement measurement, technological specification, site equipment, scheduling, mechanical assembly design, monitoring and test plans, budgeting, safety work and environmental protection.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.

National Repository of Grey Literature : 1,252 records found   beginprevious1243 - 1252  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.