Construction technology project of extension of the Supreme Court building in Brno
Coník, Šimon ; Venkrbec, Václav (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
|
|
Preparation and organization of the production area's construction facility
Řeháček, Martin ; Stehlíková, Jana (referee) ; Vlčková, Jitka Laura (advisor)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
|
| |
| |
|
Construction technology project of extension of the Supreme Court building in Brno
Coník, Šimon ; Venkrbec, Václav (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
|
|
Realization of the Building Envelope of the Administrative Building in Česká
Burget, Martin ; Selník, Petr (referee) ; Mohapl, Martin (advisor)
The content of this bachelor thesis is the solution of the technological phase of realization building envelope of the administrative building in Česká. The building envelope is partly made of the reinforced concrete and partly made of brick blocks, insulated with contact insulation system. The thesis contains a technical report, a situation with wider transport routes relationships, a budget with a bill of quantities, a technological prescription, a site equipment project, a time schedule, a machine assembly, a control and test plan and a safety and health protection during work for the phase being solved.
|
|
Bolt Tower Dolní Vítkovice - construction technology project
Bittnerová, Lucie ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
The diploma thesis is dealing with selected parts of construction technology project of extension Vysoká pec no. 1 in Ostrava – Vítkovice. This thesis contains detailed elaboration of technological specifications for the construction of structural steel superstructure. For this phase is treated with a draft of mechanical report, inspection and test plan, dealing with traffic routes and itemized budget. There is also processed a proposal of building equipment which is the same for the entire implementation extension of Vysoká pec, a situation of building equipment, technical report of the object, the timetable for the entire project, ecology, health and safety.
|
| |
| |
| |