Extension of a hotel Tři Věžičky in Střítež - planning of implementation of construction
Pupíková, Ingrid ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This thesis solves the construction technology project extension at Three Steeples in Střítež, building apartments. Work includes the complete study of the implementation, including timing and the financial plan, assessment of the wider relations of transport routes, the project site equipment, design of the main building machines and mechanisms, technological specifications for masonry, inspection and test quality plan for walling, technological prescription for clay plasters and itemized budget rough construction of the main building.
Implementation of Production Hall in Hulín
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
Apartment Building in Stromovka - Building Technology Project
Kralovič, Antonín ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the diploma thesis is to describe the building-technological project for the construction of a residential building in Hradec Králové. The apartment building is five-storey and has 33 residential units. The work is systematically divided into smaller logical units. First, the project is described in a technical report, followed by studies of the realization of the main building. After the description of the project, an indicative time and financial plan is prepared, which is refined by the schedule and budget itemization of the main building. An integral part of the design is mechanical engineering, staff balance and site construction equipment. To ensure the maximum quality of the work carried out, the technical regulations contain the control and test plans. In order to determine the supply possibilities of the construction it was necessary to carry out an assessment of the wider transport relations around the building.
Preparation of the construction of the Active Center in Ratíškovice
Prágr, Michal ; Patloka, Jiří (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is preparation of realization of Active center. Diploma thesis includes technological regulation for concrete constructions and the roof, project of machine set, the inspecting and testing plans, plan of BOZP, the budget and the time table of main construction object. I alson did the project of the building site facilities and drawings needed.
Construction Project - Apartment Building "Za Pivovarem" Lázně Bohdaneč
Volf, Miroslav ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
VUT - Reconstruction of the building A1-building and technological project
Stašová, Darina ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
Subject of this diploma thesis is construction technology project of reconstruction of object A1, faculty of mechanical engineering, BUT in Brno. This diploma thesis contains technical report of construction site, construction site equipment project, time and financial plan, budget of one building object, technological study of the major technology stages, design of mechanical equipment, technological specifications and quality controlling inspections.
Preparation of realization of University dormitory BUT
Götz, Libor ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is to prepare the realization of college dormitories for the Brno University of Technology. A technical docummentation for the construction-technological project, transport routes design, time and financial schedule, budget according to technical – economic indicators, main technological stages implementation study, construction project, main construction machines proposal, time plan, and an item budget of the main construction object is prepared. An integral part of this thesis are the technological regulations, including control and test plans. And at the end the LEED certification and the health and safety plan were prepared.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Hospital in Pardubice - preparation and organization of extension Pavilion
Záleský, Martin ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
This thesis discusses the preparation and organization of the extension construction of multi-purpose Pavilion in Pardubice hospital. The thesis contains a summary accompanying technical report, technical regulations for CFA piles and contact insulation system. Those 3 regulations have developed inspection and test plans. Next parts od the work are time schedule and an itemized budget of the pavilion, time and financial plan of the whole building, Occupational safety and health instructions, environmental issues during the construction, design of mechanical set, system of construction site project. There is also noise study made during the implementation of the construction of the pavilion. Finally there is also situation of construction, CFA pilot implementation scheme and contract.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.