National Repository of Grey Literature 41 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Construction and Technological Preparation of the Transport Terminal in Pec pod Sněžkou
Černý, Jiří ; Jílek, Jan (referee) ; Mohapl, Martin (advisor)
The diploma thesis solves construction and technological preparation of the transport terminal in Pec pod Sněžkou. The content of the diploma thesis is a techical report on the construction technology project, the coordination situation, the time and financial schedule, the project of building site, selection of machines, time schedule for the main building object, plan for securing material resources for the main building of the transport terminal, technological prescription and inspection and test plan for monolithic ceiling structures. Another assignment part contains a plan for safety and health protection at work on the construction site and specialized topic is a noise study.
Residential building Hostivar - construction and technological preparation of construction
Hanáček, Patrik ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
The theme of the diploma thesis is elaboration of selected parts of the construction technology project in building block of flats Hostivař. Content of this project is technological solution for realization of this project. It means working on time planning of construction, right using of human, material and machinery sources and controlling system for selected part of the building. In attachment of the diploma thesis, there are also drawings of building site equipment for different construction phases. The goal of the diploma thesis is design right and economical procedure for realization of the building, comply with the safety, quality and ecology conditions.
Construction technology project of production hall in Uherske Hradiste
Radmil, Aleš ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is the solution of selected components of construction-technology project construction of the II. stage production hall of the company Schlote Automotive Czech Ltd. This work includes financial, temporal, technical and technological aspects of the construction process. For selected component is created technologic direction and inspection plan.
Reconstruction of the II/387 road between Nedvědice - Bořínov - Ujčov
Čtvrtňáková, Kristýna ; Loučka, Miroslav (referee) ; Matuszková, Radka (advisor)
The basis of the work is the reconstruction of the road II / 387 between the villages of Nedvědice - Bořínov - Ujčov on the border of regions (South Moravian Region and Vysočina Region). The subject of the thesis is the proposal of transfer of the road into a more suitable trace and proposal of bypass of the village Bořínov. The design will include a conceptual design of two bridges, a culvert and three intersections. The total length of the road is about 800m.
Production of veterinary drugs Tekro - New Dědina - construction and technological project
Karel, Jaroslav ; Čech, David (referee) ; Henková, Svatava (advisor)
The content of this thesis is the construction technology project construction hall for the production of veterinary drugs Tekro in the village Nová Dedina. In this work addresses the project site equipment, scheduling, technical regulations, inspection and test plan, a study of the main technological stages of the building.
Constructive technological project of block of flats Meandr in Brno
Schauer, Martin ; Klimszová, Alžběta (referee) ; Diaz, Yvetta (advisor)
This diploma thesis deals with the construction technological project of block of flats residence Meandr in Brno - Komín. On the given topic are processed and all necessary supporting documents that enhances the clarity and orientation in matters large building for the preparation of the construction process. Given the scale, complexity and location of the building is structurally location technology project addresses the only earthworks and construction site of the main building object SO-01 only. Furthermore, nine small objects that are closely tied this main object within the premises of a residential building. Between integral part of this work include the project site facilities including a time of economic evaluation studies of major technological stages realization, design of main machinery and mechanisms itemized budgets volume of important buildings and budgets by THU volume, less important objects, further technological specification for the implementation of monolithic concrete construction as this topic linked inspection and test plan, risk and crisis measures. For the entire building housing residence is prepared detailed timetable and a lot of additional documents.
Construction technology project for a hotel in Giant Mountains
Pozler, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
Construction preparation of a residential building Kluchova - Brno, Nový Lískovec
Jokl, Lukáš ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
The diploma thesis is dedicated to the project of preparing the realization of an apartment building on Kluchova Street in the Brno-Nový Lískovec district. The content of this work is the technological regulations for underground construction carried out using the so-called white bath and vegetation roof, for which an inspection and test plan, a time and financial plan-object plan, a time plan for rough construction and an itemized budget for rough construction are drawn up. It also includes the coordination situation with broader relationships of transport routes, the design of main machine assemblies, construction site equipment, principles of construction organization and safety and health protection at work with a focus on the main risks arising from construction. As part of the work, several appendices are developed, such as an assessment of the main lifting device, a proposal for LEED measures, an assessment of the necessary costs for the establishment and operation of the site equipment, a noise study of the site equipment and an assessment of the white tub/lost formwork structure.
The technological stage of the underground construction of the New Mill - Fatra
Wiesner, Jan ; Brandtner, Michal (referee) ; Kantová, Radka (advisor)
The content of this bachelor thesis is the technological stage of the rough substructure of the industrial building Nová Válcovna - Fatra. The work deals with the technological regulation for foundation structures, which will be drawn up control and test plan, time schedule, itemized budget. It also includes a coordination situation, a drawing of the construction site equipment, a design of the machine assembly, a drawing of the construction site equipment, and the safety of the technological stage. In addition, several schemes for the execution of individual structures and an energy performance certificate have been developed for this technological stage.
The community center in the Czech Budejovice - Construction Technology Project
Vondrák, Tomáš ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.

National Repository of Grey Literature : 41 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.