CONSTRUCTIONAL-TECHNOLOGICAL STUDY OF HALL REALIZATION IN BLANSKO
Škopík, Michal ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with solution of construction of steel hall in Blansko. In this thesis is solved constructional-technological study of construction of steel hall. The thesis focuses in assembly of steel skeleton. More specifically deals with traffic situation around building, time and financial plan of the building for individual objects, draft of equipment of construction site, design of the main lifting machines and mechanisms, schedule of the main building object, safety measures at the construction site and ensuring quality requirements for the installation of a steel skeleton. Extra is processed itemized budget with bill of quantities, risk plan of construction of steel hall and construction details. This building is very interesting about architectural design. The basis for this thesis was a drawing documentation for realization of this construction.
The real estate division - multifunctional building
Lužný, Vítězslav ; Dittrichová, Lenka (referee) ; Šmahel, Milan (advisor)
This Master´s thesis is focused on assessing the possibility of a real division of the property in question of options in settlement of ownership, if there is no agreement between the venturers. In the theoretical part of the thesis was all the problems described and explained in general terms. In the practical part was the property described and assessed the possibility of a real division in all aspects. There were designed the construction works for the real division, performed valuations of undivided property and property after a real division, quantified the cost of construction works and drafted settlement of ownership by ownership interests.
Extension and construction modifications of the F2 production hall in Hodonice - construction technology project
Laga, Radim ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a complex construction technology project for the realization of three additions to the existing production hall. The work aims at the optimal choice of intertwining the temporal, spatial and technological structure of the construction process in such a way that the work is completed on time, at a pre-agreed price and in the required quality.
Construction-technological project of the building in the area of Rotana
Kadlec, Michal ; Brandtner, Michal (referee) ; Vlčková, Jitka Laura (advisor)
The aim of the diploma thesis is to process a construction-technological project of the building in the area Rotana. The aim of the thesis is to propose a suitable implementation procedure of the building. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the main construction phase realization, plan for securing material resources, technical report, time and financial object plan. The thesis also focused on the comparison bracing of foundation with the slopes.
Residential complex Troubsko - construction technology plan
Jurák, Ondřej ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
Comparison of unfinished house prices in several stages of construction with the cost of finished construction works
Hanzlíček, Michael ; Cupal, Martin (referee) ; Kosová, Jaroslava (advisor)
The aim of this thesis is compare the price unfinished house in various stages of construction with the cost of executed construction. The price unfinished house was identified by various calculation. The various calculation were compared each other. The chosen methods are develop construction budget, determine prices through technical-economic indicators and of price regulations. Price unfinished buildings and the value of construction works is determined in three separate phases, these phases are described in the thesis itself. Calculation results are processed in graphic form and at the end of this thesis are compared with each other. Assigned task is achieved by a complete itemized budget for a house with no exterior modifications and connections. From final itemized budget are created sub-budget containing structure according to specified stages of construction. In the same stages of construction are made calculations by price indicators and price regulations. Target set in the thesis is filled at the end, all the values are described and compared. The results suggest the use of computational methods is determined by the purpose for which prices are measured. Labor and accuracy while itemized budget is confirmed, the remaining calculations are mainly informative and preliminary pricing satisfactory. The benefit of the work is to verify the use of computational methods for the different phases of the construction process.
Price comparison of the individual constructions on the total price of house as stated in the price order and defined in the itemized budget.
Buljak, Michal ; Pudil, Ladislav (referee) ; Kosová, Jaroslava (advisor)
This diploma thesis describes the methods of valuation by using cost valuation method for family houses. The thesis defines the basic concepts from this field, methods of valuation and helps to create individual calculations. The main goal of this work is the valuation of five family houses by two cost valuation methods, their comparison and evaluation of the degree of difference between the methods. In order to achieve this goal, it is necessary to ascertain the total cost differences of individual constructions and equipment with the help of an itemized budget and by following the valuation order of the Ministry of Finance, compare the results and call attention to possible shortcomings of a given method.
Construction technological project of storage and manufacturing facility - Nihošovice
Hanzlovská, Nikola ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The subject of this thesis is the construction and technological project of warehouse and production facility - Nihošovice . The thesis is mainly focused on the study of the main technological parts and technological specifications for the implementation of the mounted frame, which solves loadbearing system of the building. For the technological specifications is processed control plan , health and safety . The thesis project consists of building equipment, technical reports , time and financial plan of the SO A1 , the proposal of machines and mechanisms, coordinating site plan and block plan of traffic routes , plan for securing material resources , time and financial plan object .
Architectural and technological project the polyfunctional file EASTGATE
Plaček, Michal ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The aim of this master's thesis is the architectural and technological project of office building the polyfunctional file EASTGATE. It deals with a solution of the developing process in term of time, financial and material requirements based on client and designer requirements. Architectural and technological project of the master's thesis contains technological regulations, building equipment, schedule, itemized budget, design mechanical assembly, inspection and test plan, health and safety, etc.
Realization of the gross under-construction of the housing complex in Trenčín
Gunár, Juraj ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
The bachelor thesis deals with construction technological project of the gross under-construction of the SO 203 objects of the housing complex Olbrachtova. The object is the realisation of drilled pille and foundation structures. The project includes the technical report, transport routes, technological instruction for drilled piles and foundation structures, technical report for construction-organisation principles and equipment of building yard, budget time-planing, machine configuration, controlling and examining plan of the phase, safety and risk plan on the construction site and all drawing concerning the problem.