No exact match found for Doubek, Michal, using Doubek Michal instead...
National Repository of Grey Literature 32 records found  1 - 10nextend  jump to record: Search took 0.05 seconds. 
Implementation of the bottom construction of the hotel in Strbske pleso
Macho, Andrej ; Doubek, Rostislav (referee) ; Novotný, Michal (advisor)
The subject of this bachelor thesis is to process a building construction project of the lower building of hotel Ovruč in Štrbské Pleso village, Vysoké Tatry. It is focused on realization of soilcrete and foundation structures. This thesis consists of accompanying and summarized technical reports, sitting of the building with regards to transport routes, technological regulations, organisation principles and equipment of building yard, the itemized budget and time schedule, proposition of construction machines configurations, inspection and testing plan, health and safety at work. All relevant technical drawings are included as well.
Technological phase of supporting frame's realization of the transfer station at waste dump Uhy
Doubek, Rostislav ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor thesis deals with construction-technological phase of supporting skeleton structural system's realization of the transfer station at waste dump Uhy. It contains operating procedure, equipment of the construction site, time schedule, machinery, control and testing plan, work safety, calculation and alternative proposal for prefabricated part from reinforced concrete. The alternative proposal solves sizing of the reinforced concrete element, calculation and machinery.
Preparation for rough superstructure recreational facility in Zlin
Prágr, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The subject of my bachelor thesis is construction technological solution of the rough upper construction realization of the recreational resort. Bachelor thesis includes technological regulation for masonry and layout of ceiling Spiroll panels, next is the project of the machine set, the inspecting and testing plans, BOZP, the budget and the time table of the whole phase. I also worked out the technical report of the building site facilities including drawings needed.
Classification of IT Products and Services Designed to Manage Enterprise Asset Management
Šimara, Michal ; Doubek, Milan (referee) ; Sodomka, Petr (advisor)
This bachelor thesis is concentrated on general description of Enterprise Asset Management (EAM). It explains important theoretical terms, describes concept and possibilities of use these tools and it is focused on explanation why are them helpful and how to use them. In next part is analysis of present EAM solutions. A research of the main most important solutions has been written, and there is basic describe, advantages and disadvantages. At the end is written about suggestion of practical use of this concept in organization.
Technological stage of the rough construction of the residential building in Bratislava
Krajčovič, Matúš ; Novotný, Michal (referee) ; Doubek, Rostislav (advisor)
The subject of my bachelor thesis is the processing of the structural work of tower structure. The construction is based on piles and foundation plate. The thesis presents the construction solutions from the perspective of construction technology. Part of the work is an accompanying and summary technical report, site drawing and site equipment, broader traffic route relations, timetable, itemized budget, work list with quantities, machine assembly, technological regulation for the monolithic construction – waterproof concrete construction, safety and protection at work, field research of cranes.
Implementation of the gross overhead construction of the storage hall in Hradec Králové
Štěpánek, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The bachelor thesis is aimed at the construction and technological solution of the rough top structure of the storage hall in Hradec Králové. Bachelor thesis contains technological background for the execution of rough construction. This work aims to solve problems with the procedures for the implementation of masonry and prefabricated structures. I focused on the part of the hall that will serve for administration and I devised the implementation procedure and the time consuming. As the project documentation did not have anything to do with the ceiling 1.NP, I had to solve the project site first and then I did the implementation technology. I also compared the two lifting devices in terms of economic and time requirements. Another objective was to solve the transport of individual building materials on site. The proposed solution is based on my personal experience with the implementation and consultation of leading experts in the field. The aim of this work is to propose an optimal course of implementation of the storage hall.
Constructional technologic project of objects at dump Úholičky
Doubek, Rostislav ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
In this diploma thesis two steel frame objects of a waste dump in Úholičky are solved. The aim is to resolve the chosen parts of a construction-technological project. The main topics for selected technological phases are transportation, bill of quantities, technological regulations, construction organization’s principles, time schedule, machinery, control and testing plan, work safety and worker’s health protection. These topics are prepared for the technological phases of ground works, fundamental contruction, upper load-bearing structure, construction of the floor and sheathing of the object. The thesis has also other parts which include static solution of a prestressed unit, budget by items, calculation of the object’s maintenance cost, handbook for bulding’s occupancy and proposal of construction contract.
Apartment building Barandov - selected parts of the construction technology plan
Kiš, Michal ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
This diploma thesis deals with the construction technological preparation of selected parts of the new Barrandov apartment building in Prague. The thesis includes a technical report on the construction technology project, a coordination situation of the construction with regard to transportation routes and a proposal for the supply of the construction, an object-based time and financial plan for the construction. It also includes a study of the realization of the main technological stages of the construction project, a project for the construction site equipment with drawings and a technical report, a proposal for main construction machinery and mechanisms with dimensioning, placement, transportation to the construction site, reach, time deployment and energy consumption, and occupational health and safety. It also includes a time schedule for the main construction project and a plan for securing material resources for rough construction. The technological procedures are focused on the realization of pilotage and contact insulation systems, as well as quality control and testing plans for these procedures. In addition, the thesis also deals with the balancing of workers and the assessment of the main lifting mechanism.
Fascist trends in peasant party in thirties of twentienth century
Duraj, Matouš ; Doubek, Vratislav (advisor) ; Pehr, Michal (referee)
Fascist tendencies in peasant party in thirties of twentieth century Abstract (in English): This work will concern with fascist trends in peasant party during the thirties of twentieth century. This period is characterised by taking power or consolidation of non-democratic regimes and deepening the economical crisis. In this work we will try to find out if the fascist trends were incorporated in politics and speeches of republican party. At first we will describe the function of republican party in political system of Czechoslovakia. Then we will determine basic features of fascist movements based on the analysis of several authors, which will be compared with the manifestations of the peasant party and assess if there are fascist tendencies or not.
Causes of Passive Resistance of Germans at the Czech Landtag (1886-1890)
Illichmann, Michal ; Doubek, Vratislav (advisor) ; Štefek, Martin (referee)
This thesis focuses on German demands of administrative and political division of Bohemia in 1880s, which proceeded a few year lasting German representatives boycott of the Czech Assembly (Landtag). Its aim is to observe construction of German argumentation and a brief analysis of the bills proposed on the topic of division of the country. The main part of the thesis follows constitutional and national demands of Czech Germans toward Bohemia as a historical land and Austro-Hungarian empire where Germans lived together with other nations. All the above is interpreted within a framework of development of German liberal thinking in Austria and advancing nationalization among the German political leaders. The main objective of the work is better understanding of evolution of political and national thinking of Germans living in Bohemia at the end of 19th Century.

National Repository of Grey Literature : 32 records found   1 - 10nextend  jump to record:
See also: similar author names
6 DOUBEK, Martin
6 Doubek, Martin
1 Doubek, Matyáš
2 Doubek, Michael
6 Doubek, Milan
1 Doubek, Miloš
Interested in being notified about new results for this query?
Subscribe to the RSS feed.