National Repository of Grey Literature 1,044 records found  beginprevious1034 - 1043next  jump to record: Search took 0.00 seconds. 
Napěťově deformační analýza fotovoltaické elektrárny
Fuis, Vladimír ; Venclík, J. ; Ždímal, P.
The paper presents the results of the analysis of the optimization of the photovoltaic power plant construction with regard to its weight (maximum weight of the plant construction – without photovoltaic panels – must not exceed 50 t) while ensuring that the construction is safe against the plasticity of the construction and the loss of buckling stability of steel rods.
Development of probabilistic SBRA method and integrated design of structures
Marek, Pavel
The computer revolution allows for considering transition from deterministic and prescriptive structural reliability assessment methods to probabilistic concepts using simulation technique, non-parametric variables, non-traditional criteria and more. The subject of the paper is a draft of Roadmap of the development from current codes to Integrated Design (Performance Based Design, Life Cycle Assessment, Risk Engineering and Monitoring). The attention is given to probabilistic, design (dimensioning) and to the assessment strategy using Simulation-Based Reliability Assessment approach (SBRA) corresponding to the computer era.
Geometric constructions from the point of view of various didactic environments
Roubíček, Filip
The paper describes three didactic environments as an alternative to drawing. They concern constructions of geometric figures using puzzles, folding paper and using strings. These representational environments are presented on constructions of polygons.
Pathology of the steel structures
Marek, Pavel
Selected examples of structures failures.
Construction of bacterial strains containing fluorescent and bioluminiscent makers
Jindrová, Eva ; Rucká, Lenka ; Nováková, H. ; Jurčová, Irena ; Brennerová, Mária ; Demnerová, K. ; Brenner, Vladimír
One of the most effective method for removal of organic pollutants seem to be construction of permeable barriers, allows removal of mixed contaminants with consequent utilization of rhizosphere systems.
The business plan for a newly created construction company
Stočková, Ivana ; Cejthamr, Václav (advisor) ; Mejdrech, Vlastimil (referee)
The aim of this thesis is to create a business plan for a newly created construction company. The theoretical part describes in detail the structure of the business plan, the principles for a successful treatment plan and possible alternatives. The second part focuses on the description of the construction industry, its characteristics and the current market condition. The practical part is the actual business plan, whereby you can verify that it is the intention of the actual real market conditions and whether the founders of the initial investment back within a sufficiently short time.
Solution of warehouse in construction company Reinter
Pčola, Jaroslav ; Pernica, Petr (advisor) ; Simonová, Adriana (referee)
In my bachelor thesis i focus on solution of warehouse of machines and tools in construction company Reinter. I describe state and problems before transformation, proces of transformation and achieved effects on firms logistics. I enclose to my work photos and examples of outputs from PC system. In theoretic part I focus on application of logistics in construction business and specially the system Just in time.
Construction contracts -- the ways of their accounting treatment
Mařasová, Lucie ; Krupová, Lenka (advisor) ; Strouhal, Jiří (referee)
This thesis is concerned with accounting for construction contracts in the accounting records of a contractor. The first chapter is focused on accounting for construction contracts according to IAS 11 -- Construction contracts and contains also a brief description of interpretations IFRIC 12 and IFRIC 15, which are connected with IAS 11. Next chapter describes accounting for construction contracts according to the US GAAP. One chapter is also dedicated to the requirements of Czech accounting legislature that Czech contractors have to take into account when accounting for construction contracts. Last chapter is conceived as a case study which was prepared in order to determine how construction companies -- concretely three European and three American construction companies -- deal with construction contracts in practice.

National Repository of Grey Literature : 1,044 records found   beginprevious1034 - 1043next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.