Technological Solution of the Rough Superstructure of the Municipal House U Muchů
Bystričan, Daniel ; Porwisz, Ondřej (referee) ; Mohapl, Martin (advisor)
The main goal of my bachelor's thesis is the construction-technological solution of the rough superstructure of the Municipal House U Muchů, which is located in the village of Dolní Město near the larger town of Humpolec in Vysočina. This work contains a technical report for the given technological stage, the situation of the construction with wider relations of transport routes, a statement of dimensions for the technological stage, a technological regulation including a balance of resources (item budget together with a graph of the deployment of workers). Furthermore, the content of this work is a drawing of the construction site equipment together with a technical report and construction organization solution for the rough superstructure, a timetable for the given stage, a design of the machine assembly including a comparison of two variants and the selection of the most suitable machine, control and test plans and ensuring work safety. In the last point of this work, I am dedicated to verifying the adhesion and load-bearing capacity of the connecting material, more specifically, it is a polyurethane adhesive for masonry.
Preparation of the implementation of the gross substructure of the service building, Bystřice nad Pernštejnem
Schneider, Jiří ; Kurková, Dita (referee) ; Průcha, Aleš (advisor)
The aim of this bachelor's thesis is the preparation of the implementation of the rough substructure of the operational building in Bystřice nad Pernštejnem. The work deals with technological regulations for foundation structures, including insulation against moisture, for which an itemized budget, inspection and test plan, and time schedule will be drawn up. In addition, this work contains the equipment of the construction site, the coordination situation with wider transport relations, the design of the machine assembly, the principles of construction organization and safety and health protection at work. In addition, details regarding the rough substructure or insulation against moisture and assessment of construction machinery are worked out for the work.
Extension of the sports centre in Slopné, technological stage of roofing
Heinz, Pavel ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The bachelor thesis deals with the technological stage of the roofing of the sports centre extension in the village of Slopné. It is the construction of a multi-purpose building, which extends the capacity of the existing community centre. The extension consists of ground floor parts and a main hall/gymnasium with multifunctional use. The content of the work includes a technical report for the roofing, a solution for the transport of materials, a technological regulation for the assembly work of the roofing of the hall, an itemized budget for the roofing and a timetable for the specified technological stage, an inspection and testing plan and a solution for occupational safety in the process.
Technological stage of roofing the winter stadium in Vyškov
Novotná, Nicolette ; Jílek, Jan (referee) ; Diaz, Yvetta (advisor)
The bachelor's thesis deals with the technological process of roofing the ice surface at the winter stadium building in Vyškov. It is a system arch construction. The work contains a technical report focusing on the given stage, budget, technological regulation, construction site equipment, machine design, time schedule and other technical documentation according to the assignment.
Villa Park Olomouc, technological stage of the substructure
Hanousková, Lucie ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor's thesis is processed on the basis of the project documentation provided, which addresses the construction of nine apartment buildings connected by an underground garage. The building is located in the new residential development VilaPark Tabulový Vrch, which represents a set of three-storey villas. The houses are based on pilots carried out by continuous spiral worm - CFA technology. The pilots are joined by a subterranean concrete structure made of water-based concrete, and above ground they form a monolithic structure combined with masonry. The roof is designed as a flat, non-errand. The cladding of the buildings is done by the contact cladding system ETICS. The work addresses the technological stage of the lower construction. A technical report is prepared, the construction situation with wider links of transport routes, technological regulations for earthworks and piloting by cfa method, the design of a machine assembly for the whole lower structure, control and test plans for earthworks and piloting and safety of work. The work also includes an acreage statement, an appropriations budget, a time plan for the construction and the organization of the construction for the lower construction with the construction site equipment and balance of resources.
Completion of Essens company building in Brno - Líšeň, Gross Substructure
Zhorný, Jan ; Kantová, Radka (referee) ; Průcha, Aleš (advisor)
The content of the bachelor's thesis is the preparation of the realization of the gross substructure of the completion of Essens company building in Brno - Líšeň. The work is focused on the processing of the technical report of the construction site equipment, solving traffic relations and subsequent drawings. Furthermore, the content of the work includes the design of a suitable machine assembly, itemized budget, and time schedule of the stage of the gross substructure. Great emphasis is placed on the elaboration of detailed technological prescription for the implementation of piles and subsequently on the implementation of the white tank system. This chapter is followed by the processing of the inspection-check plan. The last part is an analysis of the issue of safety and health protection at work, definition of occupational risks and proposed measures for their elimination.
Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.
Project
Malý, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
Campus MU Brno (green stage) - construction technological project
Honzík, Roman ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
Preparation of realization of completion of clinical hematology, University Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.