National Repository of Grey Literature 311 records found  beginprevious302 - 311  jump to record: Search took 0.01 seconds. 
Petrol station at D5, technological phase substructure
Čeňková, Lydie ; Krejčí, Vlastimil (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the construction of buildings lower highway service areas, primarily pumping station and its accessories. Basis of the work are technological regulations for the implementation earthworks, installation of underground steel tanks fuel, the work of the foundation and system design site. The work also includes an itemized budget, time schedule, schedule, safety and quality inspection work performed and draft mechanical assembly for the stage.
New building log cabin object in Malenovice, rough superstructure
Jůnová, Lucie ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
The bachelor’s thesis is focused on the construction of log house. Solves realization of rough superstructure. It is a single-storey building with an attic. The building is designed mostly from log construction and partly brick with wood-beamed ceilings, roofed a gable roof. The work includes technical report, technological regulation for vertical construction, ceiling and roof truss, design a construction site installations including construction organization, time schedule, design mechanical assembly, control and test plan, health and safety at work.
Nursing home in Topolná, preparation realiation cross upper building construction
Čapek, Ladislav ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
The bachelor thesis deals with structural and technological project for the construction of gross upper building of nursing home in Topolná. The project includes specifications for the ceiling-mounted construction, supervisory and test plans, equipment of the construction site and the draft of the mechanical assemblies. Next it deals with the budget of the gross upper building, schedule and the labour protection.
Input object SO 01 Social Care Institute for Youth in Rychnov nad Knežou, gross superstructure
Skokanová, Barbora ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
The article of this thesis is the upper gross production technology of the entrance object of social care institute in Rychnov nad Kněžnou. Content of this article technological specification, technical reports, site equipment, mechanical assembly design, scheduling, budgeting, monitoring and test plans, safety and environmental protection.
Bearing construction and roofing for production warehouse complex Lena-toys in Dolní Benešov
Wrana, Lukáš ; Selník, Petr (referee) ; Mohapl, Martin (advisor)
The theme of this bachelor thesis is the building technology solution of bearing construction and roofing for production warehouse complex Lena – toys in Dolní Benešov. The content of this bachelor thesis is the technological process of assembly of the building bearing construction and roofing of prefabricated reinforced concrete elements, the budget, the inspection and the test plan, the issue of safety and protection of health at the construction site, the mechanical assembly, the schedule of construction and economic assessment of lifting mechanisms.
Realization of the substructure multi-functional building in Zlín
Chaloupková, Tereza ; Diaz, Yvetta (referee) ; Kantová, Radka (advisor)
The subject of the bachelor´s thesis is the lower gross production technology multi-functional building in Zlín. The content of this work are the technical report, technical regulations, safety, environmental protection, design of mechanical assemblies, solution building equipment, inspection and test plans, individual work schedule and budget.
Technological stage of implementation of the gross superstructure of the building of family villa in Kroměříž
Osina, Lukáš ; Ing.David Čech (referee) ; Henková, Svatava (advisor)
The article of this bachelor’s thesis is the upper gross production technology of the villa in Kroměříž. Content of this article technological specification, technical reports, site equipment, mechanical assembly design, scheduling, budgeting, monitoring and test plans, safety and environmental protection.
KIC Zašová stage of carcass superstructure
Janíček, Jakub ; Lízal,, Petr (referee) ; Biely, Boris (advisor)
The subject of work is the solution of stage gross superstructure of cultural and information center in Zašová. The work includes construction technology report, technological instruction mounted skeleton, building equipment, budget, time scheduling, work safety, environmental protection, control and test plans, addressing broader transport relations and proposing an appropriate mechanical assemblies.
The terrace house Omice - gross bottom construction
Němec, Lukáš ; Klempa, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is focused on the technological stage of the lower gross building terraced house in Omice. Part of the thesis is technical report the work site facilities, technical regulations, inspection and test plans, reports the machine design, plan of safety and protection of health and environmental, budget and timetable.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.

National Repository of Grey Literature : 311 records found   beginprevious302 - 311  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.