| |
|
Construction technology study of the production hall in Znojmo
Smatana, Roman ; Nevosád,, Zdeněk (referee) ; Lízal, Petr (advisor)
This master thesis deals is processed constructive technological project of realization factory and storage building in Znojmo. Master is thesis includdes model of the building site accessories, technology procedure, time schedule, financial heftiness ,check and test plan, budget ,occupational safety.
|
|
RECONSTRUCTION OF THE CENTRAL BUILDING PLAVEČ – PREPARATION AND ORGANIZATION OF CONSTRUCTION
Černý, Karel ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
This thesis deals with reconstruction of the home for the elderly Plaveč main building. These reconstruction is primarily interior renovation, the rooms of clients and staff facilities, but also the surrounding of the building. All work will be in full operation. Consideration of this factor in the organization of construction is the main subject of this thesis, which shall include traffic contexts, costing, budget, time schedule, equipment of construction site, construction machinery, technology procedure, occupational safety and resources.
|
| |
|
The company premises SIWE, assembly gross superstructure production hall
Drexler, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of a factory building. The main supporting element is a prefabricated reinforced concrete frame, with a peripheral shell of bricks POROTHERM insulated using contact system ETICS. The roof structure is not part of this thesis. This document includes: inventory of quantities, budget, schedule, technical regulations, organizational principles of construction and a comparison of the methods and implementations of two insulation technologies.
|
| |
|
Autosalon TOPCENTRUM in Hodonín, implementation of carcass superstructure
Pecháček, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with a construction technology procedure gross superstructure of a car store TOP CENTRUM car in Hodonín. This object has got 3 floors. One of them is underground and two of them are above-ground. The interest area is located in a flat terrain in industrial zone. Supporting system of the building is formed by steel skeletons and supplemental supporting structure of POROTHERM blocks. Ceilings are formed by prefabricated prestressed reinforced concrete panels and also by steel construction. The roof supporting system is made up by trusses and purlins and aslo by steel beams IPE. The construction and technological study of the gross superstructure includes a technical report, plan of routes, technological instruction of steel vertical supporting system and selected part of roof system, plans of inspections and tests, resolution of the building organization, schedule and budget, machine list and occupational safety.
|
|
Preparation of realisation gross superstructure of an apartment block named Francouzská in Brno
Křenková, Kristýna ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with construction technology procedure gross superstructure of an apartment block named Francouzská in Brno. An apartment block has 7 floors. First floor is located partially below ground, becouse lobby area is located in very steep terrain towards the Francouská street. Wing unit is made up of mainly enclosure wall, interior transverse and longitudinal walls of the ceramic blocks Porotherm. Transverse and longitudinal supporting interior walls are produced of sheathing bricks Supertherm, which are located in 1.NP, 2.NP and partially in 3.NP, these blocks are sealed with concrete. Ceilings are designed as continuous strengthened concrete-steel monolithic desks. The staircase is designed as a monolithic reinforced concrete. This construction and technological study of gross superstructure includes technical report, technologic process of concrete-steel monolithic ceiling, plan routes, inspection and test plan, schedule, financial requirements, solution the organization of building up, assembly and machine safety.
|
|
Residential building Šemberova, Brno - The solution phase realization of the envelope
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This Bachelor's thesis deals with the execution of the envelope residential building Šemberova. It concerns realization of the ventilated façade. In this Bachelor's thesis, the building technological project contains primarily a model of the building site accessories, the technological process, the time schedule, the financial heftiness, the machines formation, the check and the test plan, the occupational safety, for these technological phases.
|
|
Realization of technological steps gross upper building construction of ski facilities in Kouty nad Desnou
Jandová, Renáta ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis concerns two technological phases of roughly build upper building of ski areal in Kouty nad Desnou. The building serves as a dinning and bowling centre. In particular there are three restaurants. The object is located in the centre of the village, under the ski slope. It will be used all over the year ass entertaining centre. The building has one floor bellow and two above the ground. The construction is made like monolithic core structure with Porotherm brick blocks. The individual technological phases focus on the vertical supporting constructions in second floor and monolithic ferroconcrete roof above second floor. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making vertical supporting walls.
|