Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.
|
|
Constructive technological project of block of flats in Strážnice
Rozumek, Jakub ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The theme of my diploma thesis is Building and Technological Project for a residential building in Strážnice. This is a study of the implementation of major technological stages of object SO- 01 residential building, the project concerning the construction site installation, design the mechanical assembly, traffic solutions, technological process earthworks, foundation structures, piles CFA and reinforced concrete ceiling construction. The work includes further object schedule, financial plan, a detailed timetable for construction of residential building, the budget, the inspection and the test plan, safety hazards on a construction site in the implementation of the substructure object and thermal technical assessment of selected structures.
|
| |
| |
|
Residence Dlouha - Building Contruction Project
Teplý, Tomáš ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The subject of this diploma thesis is the building construction project of Residence Dlouha in Olomouc. It is an apartment building with two to four floors and a basement with garages. The diploma thesis contains a time and finance schedule, a site equipment project and technological procedure of a cast-in-place reinforced concrete floor and a green roof including a quality control. Moreover, a set of machines, usage options of a tower crane or a mobile crane and usage options of a mobile pump or a concrete container have been processed for this building. During the building process it is cared about work safety and environment protection.
|
|
Project
Malý, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
|
| |
| |
|
Campus MU Brno (green stage) - construction technological project
Honzík, Roman ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
|
|
Preparation for the construction of an apartment building in Brno - Slatina
Těžký, Filip ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermore, the calculation of the decanting time and the design of the formwork turnover, supplemented by its drawing. In the diploma thesis is elaborated a plan for safety and health protection in the workplace and selected design details.
|