Technological stage of realization mounting frame of factory building
Jekielek, Marek ; Ing.Lukáš Kopecký (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the construction phase of mounting prefabricated frame. Includes technological standard for mounting frame, the project construction site for the phase of mounting , the schedule of the phase of mounting frame, financial plan of the phase of mounting frame, controlling plan and test plan of the phase of mounting frame, the plan of risks at the phase of mounting frame, and mechanical assemblies plan.
Commercial building in Brno - the construction technological planning
Sedláček, Stanislav ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The aim of my thesis was to perform construction and technological preparation of the construction of commercial house in Brno in the street Křídlovická. The introduction contains the expected design and construction process of the proposed building as a whole. It is also prepared a preliminary draft of the financial cost of the entire project designed according THU and object schedule. Furthermore, the implementation of the project construction site for a major part of the commercial house. Gradually work focuses mainly on the implementation of the technological stage of construction site with detailed processing procedure for the implementation of monolithic concrete structures of the building.
The Flat-building in Olomouc, Nezval street, civil technological project
Drexler, Michal ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
As the basis of this diploma thesis served a project of a flat house in Nezvalova Street. This flat house is designed as 7 floors high building with undergrounds garages and commercial space in the ground floor. Foundation of this building is done using reinforced concrete pilots, continued by monolithic reinforced concrete scelet. Both circumferential casing and internal walls are built using ceramic concrete blocks Porotherm, on top of which is a layer contact insulation system from EPS. Roofing of this building is done using asphalt bands into flat roof; one part of the roof is designed as “green roof” and is covered by soil substrate. This diploma thesis covers building technology preparation of construction. It includes time schedule of construction, accessibility to the building site, technical report and blueprints of building site equipment, risk plan, draft of main tools and processes for construction, instructions on how to use housing units. The main aim of this diploma thesis is around building a monolithicreinforced concrete scelet, for which a technological manual was created, control and probationary plan and blueprints of formwork for vertical and horizontal constructions. Additionally this thesis covers roofing using flat roof and asphalt belts.
Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project
Dobrovská, Monika ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
Construction and technology project of the production hall of the company PP&T
Findejs, Lukáš ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
This thesis includes the construction technology project of the production hall of the company PP&T. The work includes technical report object, technological specification for the shell construction, quality control, report site equipment, a report describing the health and safety forth motion of mechanical assemblies, and a report describing the transport relations. The annexes drawings of site equipment, connection details of prefabricated elements, plan of risks, budget and schedule for the main subject and time financial plan for the whole construction.
CONSTRUCTIONAL-TECHNOLOGICAL STUDY OF HALL REALIZATION IN BLANSKO
Škopík, Michal ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with solution of construction of steel hall in Blansko. In this thesis is solved constructional-technological study of construction of steel hall. The thesis focuses in assembly of steel skeleton. More specifically deals with traffic situation around building, time and financial plan of the building for individual objects, draft of equipment of construction site, design of the main lifting machines and mechanisms, schedule of the main building object, safety measures at the construction site and ensuring quality requirements for the installation of a steel skeleton. Extra is processed itemized budget with bill of quantities, risk plan of construction of steel hall and construction details. This building is very interesting about architectural design. The basis for this thesis was a drawing documentation for realization of this construction.
Constructive - Technological Project of Medical Center in Vizovice
Špalková, Martina ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The diploma thesis is based on a project of medical centre in Vizovice. The medical centre is designed as a three-floor building with a receding top floor. Building foundations are designed from foundation pads and strips from reinforced concrete, the load-bearing masonry is designed from hollow clay blocks ZELUS, a reinforced concrete ceiling is designed as a bracing element. The medical centre is roofed by a flat roof with a PVC covering. This thesis deals with the budget and time plan of the whole construction, transport accessibility of the building, building maintenance instructions and maintenance costs for 25 years, daylighting of room number 1.32, an engineering report of construction site equipment and its drawing, a design of lifting mechanism of the site equipment, a plan for transport of concrete and concreting the floor slabs. The thesis is mainly focused on roofing of the medical centre, technological regulation for the roofing and reinforced concrete floor slabs is elaborated, as well as a control and test plan for the floor slabs from the reinforced concrete and for the roof PVC foil.
Selected Parts of Building -Technological Project of Biogas Station in Heralec
Píštěk, Kamil ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
The master thesis with the name Selected Parts of Building -Technological Project of Biogas Station in Heralec solves preparation and realization of building. The aim of master thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
Proposal of the Implementation of the Project Management Methodology into the Company
Vojta, Lubomír ; Pokorná, Martina (referee) ; Smolíková, Lenka (advisor)
This diploma theses deals with the challenges of a project management in a particular construction company that handles projects on daily basis. I focused on the analysis of a particular project in this company, that has been successfully implemented. This analysis served as a starting point for the designing of the changes, as well as a devising a tool that simplifies the set up of the changes into practice. Selected problem was solved by comparing the project management methodology in the project with the project management practices officially proposed in the literature. Tool design was carried out in the environment of Microsoft Excel. I managed to design a tool in which the shortcomings are treated the way that facilitates their implementation into practice, especially by using an easy environment and outputs well-arranged for the user. This tool is therefore mainly used to eliminate the identified shortcomings and thus to facilitate and simplify project management in practice.
Administrative building of company Energis, Hradec Králové - technological stage of sheathed
Findejs, Lukáš ; Selník, Petr (referee) ; Novotný, Michal (advisor)
This thesis is focused on comparing the two variants sheathed and installation of metal ventilated façade and installation of insulation Kingspan. The thesis deals technologically provisions installation, design of mechanical assemblies for mounting cladding to organization, including technical report building equipment and drawing of the building equipment, quality requirements for individual variations cladding and safety and health at work, including developing a plan of risks.