National Repository of Grey Literature 1,491 records found  beginprevious1462 - 1471nextend  jump to record: Search took 0.00 seconds. 
Administrative building of company Energis, Hradec Králové - technological stage of sheathed
Findejs, Lukáš ; Selník, Petr (referee) ; Novotný, Michal (advisor)
This thesis is focused on comparing the two variants sheathed and installation of metal ventilated façade and installation of insulation Kingspan. The thesis deals technologically provisions installation, design of mechanical assemblies for mounting cladding to organization, including technical report building equipment and drawing of the building equipment, quality requirements for individual variations cladding and safety and health at work, including developing a plan of risks.
Manufacturing premises Hylváty – Implementation of horizontal structure and roofing
Večeře, Tomáš ; Novotný, Michal (referee) ; Mohapl, Martin (advisor)
The thesis focuses on construction technology of horizontal structure and roofing on manufacturing premises in Hylváty. It includes technical report, technological regulation, monitoring and test plan, project of the construction site facilities, machinery set, budget, construction time table and visualized transportation of oversized concrete girder to the construction site.
Garage Hroznová, Brno - implementation of slope stabilization and foundation structure
Všetečka, Jan ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor’s thesis is focused on the technological implementation phase of realization sheeting structure with the subsequent establishment of the garage building in Brno. The work includes the implementation of technology, design of mechanical assemblies, a solution building site, budget, schedule, checking and test plan, safety and environmental protection during execution relevant construction.
Research Center of FIT VUT in Brno - solution of rough construction
Malaník, Jan ; Nečasová, Barbora (referee) ; Novotný, Michal (advisor)
This thesis deals with the construction and operation: gross upper structure of the Research Center of Information Technology VUT in Brno. The aim is to detail the process equipment set, the schedule, itemized budget, inspection and test plan, optimal workflow, transport links and site equipment.
Proposal of Site Facilities
Chalabala, Martin ; Aulehla, Jan (referee) ; Nováková, Jana (advisor)
The thesis focuses on the description of the function and structure of the site facilities, requirements for the planning and implementation and operation of the project of the front mill room. Without a detailed description of these aspects is not possible to design a functional operational site of this type of project. So the aim of this thesis is to provide necessary theoretical base, that is later applied on the concrete construction of the pre-grinding hall in Prachovice cement works.
Manufacturing building in Černá Hora, implementation of carcass superstructure
Hrouzová, Žaneta ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
My bachelor thesis deals with the solution of the technological stage of the montage of the steel construction and also with the roofing of the production hall in Černá Hora. It includes the technological report, the technological regulations, the monitoring and test plan, the project of the construction site facilities, machine set and time frame of the construction.
Residential house Mutěnice, implementation of roof cladding
Dohnálek, Marek ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The thesis is focused on building technology solutions of the roof of a residential building in Mutěnice. It includes technical report, technological regulation, monitoring and test plan, the project of the construction site facilities, machine set, budget, time frame of the construction and occupational safety.
Multifunctional building - technological phase substructure
Krč, Jan ; Bravenec, Roman (referee) ; Vlčková, Jitka Laura (advisor)
This bachelor thesis deals with substructure of multifunctional building, which is based on bored piles in three levels, due the difficult foundation conditions. The main part of thesis consists of the technical regulations about earthworks, technology implementation of large-diameter bored piles and their base structures. It also deals with quality assurance of works performed and their control, their time and financial demands, design of appropriate building machines and small machinery for their implementation and safety of work. Simultaneously the thesis deals with organization of construction and site design with regard to each phase of construction.
Preparation of realisation gross superstructure of an apartment block named Francouzská in Brno
Křenková, Kristýna ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with construction technology procedure gross superstructure of an apartment block named Francouzská in Brno. An apartment block has 7 floors. First floor is located partially below ground, becouse lobby area is located in very steep terrain towards the Francouská street. Wing unit is made up of mainly enclosure wall, interior transverse and longitudinal walls of the ceramic blocks Porotherm. Transverse and longitudinal supporting interior walls are produced of sheathing bricks Supertherm, which are located in 1.NP, 2.NP and partially in 3.NP, these blocks are sealed with concrete. Ceilings are designed as continuous strengthened concrete-steel monolithic desks. The staircase is designed as a monolithic reinforced concrete. This construction and technological study of gross superstructure includes technical report, technologic process of concrete-steel monolithic ceiling, plan routes, inspection and test plan, schedule, financial requirements, solution the organization of building up, assembly and machine safety.
The Realization of the Substructure of the NAMIRO Olomouc Office Building
Lukešová, Edita ; Šimáčková, Martina (referee) ; Kantová, Radka (advisor)
Bachelor’s thesis contains description of technological process of groundwork, foundation and concreting of monolithic structure, mechanization plan, safety and quality of work and constructional plant.

National Repository of Grey Literature : 1,491 records found   beginprevious1462 - 1471nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.