National Repository of Grey Literature 156 records found  beginprevious137 - 146next  jump to record: Search took 0.00 seconds. 
Vine House Klentnice - technological phase roofing
Lupač, David ; Rotrekl, Ivo (referee) ; Vlčková, Jitka Laura (advisor)
The main subject of this thesis is the roofing structure of a building used to run a small to medium-sized family winery with own wine production intended for subsequent sale and a guesthouse type of accommodation. This thesis includes a complete technical report, technological regulations, statements, assessment documentation, time schedule, itemized budget, assembly machinery draft, inspection and testing plan, health and safety at the building site, principles and organizational aspects of construction, details and other technical documentation for all stages.
Construction technology study stage assembly skeleton superstructure carcass production facility
Zeman, Roman ; Klimszová, Alžběta (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis deals with the issue of the construction technology study of the stage of skeleton assembly of production facility superstructure. The main aim of the thesis is to focus on the transportation of construction materials to the construction site, bill of quantities, technological regulations, itemized budget, organization of construction, construction facilities, inspection and test plan, schedule and machinery proposal. The thesis provides information about occupational health and safety and risk management.
The implementation phase of gross upper structure of Silo Tower
Bittnerová, Lucie ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
This bachelor’s thesis deals with the solution of technology gross upper structure Silo Tower in Olomouc. The content of the work is realization of the main technological stages of this object. For the gross stage of the upper structure is processed design of site equipment, technological process for the implementation of prefabricated and monolithic concrete structures, schedule of work, itemized budget and mechanization plan.
Roofing the building of Kindergarten in Moravany
Procházková, Šárka ; Pražáková, Jana (referee) ; Mohapl, Martin (advisor)
Content of this bachelor’s thesis is solving of technological stage of roofing of the Kindergarten building in Moravany. Roof is designed as a single-layer flat roof with classical sequence of layers, with pitch to the building centre. Detailed procedure of assembly of the bearing steel structure and the roof sheathing is provided in specifications. The bachelor’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for the given stage, further it solves wider relations of transport lines to construction site and occupational safety and health. Control and test plans, budget and schedule are elaborated for stage of the building roofing.
The solution of technolofical phase bearing structures(vertical and horizontal) apartment building in Staré Brno
Sáček, Petr ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
The topic of my thesis is to implement technological steps gross upper construction of residential house on Rybářská ulice in Staré Brno. This paper contains a technical report, technological specification, bill of quantities, schedule, design of machine assembly, quality requirements and their security, safety, and organization development solutions.
ZOO garden Brno, Refreshment structure - rough construction
Černohorská, Magda ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
aim of this bachelor thesis is the building-technological solutions of Zoo garden Brno, refreshment structure – rough construction. Part of the thesis is technical report the work site facilities, transport links, reports the machine design, schedule and budget, technical report the work site facilities, problem details, monitoring and test plans, protection of healt and environmental.
Apartment building Bílá hora - gross substructure
Michalčíková, Lucie ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this bachelor thesis is the building-technological solutions of gross substructure to apartment building Bílá hora. Part of the thesis is technical report the work site facilities, technical regulation of selected works, monitoring and test plans, reports the machine design with associated transport links, plan of safety and protection of health, environmental, budget and schedule.
Proposal of Site Facilities
Moudrá, Michaela ; Petr, Lukáš (referee) ; Nováková, Jana (advisor)
My bachelor´s thesis is devided into two parts, the theoretical one and the practical one. In the theoretical part, I define functions of a construction site, as well as its division into zones. Moreover , I describe particular objects,buildings and mechanizms which are key elements of the construction process. Next chapters include planning, realization and economic viability. Finaly, the practical part, which is the main purpose of this thesis, is the design of the construction site for the particular appartement house located in Třebíč and also creating a technical report and the situation.
Warehouse extension in Polička - stage of carcass superstructuree
Herben, Tomáš ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The content of this work is warehous extension in Polička concrete implementation of carcass superstructure. This tesis contains construction and technology report, technological prescription, technology report of transportation, technology report of health and safety on the construction site. Budget, calculation and time planning, inspection and test plan and description of transport relations.
Securing the site in relation to insurance of alienation risk
Bachan, Jan ; Šenigl, Jaroslav (referee) ; Hanák, Tomáš (advisor)
This thesis deals with construction site security, particularly against theft by insurance. The main goal of the thesis is to compare the products that are suitable for this aim and that are offered by the biggest security companies on the local market. First it was important to identify the type of property which is most often the subject of theft, then the persons or groups of persons who might be potential thieves, and also the most frequent way of conducting this criminal activity. Furthermore, time and cash plan was devised from a family house budget. Then it was necessary to write down an inventory of the working tools that are going to be owned by the investor. In this model case the investor is going to do the construction on his own. After discovering this data I conducted a comparative analysis of the insurance products offered by the four biggest insurance companies on the market. The result of this work is the choosing of the most appropriate insurance product, which would be the best at covering the potential danger of theft at the construction site.

National Repository of Grey Literature : 156 records found   beginprevious137 - 146next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.