Original title:
Hotel
Translated title:
Hotel
Authors:
Masaryk, Andrej ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor) Document type: Master’s theses
Language:
slo Publisher:
Vysoké učení technické v Brně. Fakulta stavební Abstract:
[slo][eng]
Diplomová práca je projekt Hotelu v meste Gbely. Hotel je projektovaný ako štvorpodlažný s jedným podzemným podlažím. Budova je navrhnutá ako objekt s 26-timi izbami pre hostí, reštauráciou, barom a obchodom. Hotel má jednoplášťovú plochú strechu. Nadzemné murivo je tvorené systémom Ytong. Nosné obvodové múry v prvom podzemnom poschodí sú tvorené systémom Prefa BTB, nosné vnútorné múry sú tvorené systémom Ytong. Priečky sú taktiež tvorené systémom Ytong. Hlavný vstup do budovy je situovaný na severozápad. V suteréne sa nachádza kotolňa, náhradný zdroj energie, zázemie pre zamestnancov, práčovňu, žehliareň, strojovňa VZT a skladovacie jednotky. Prvé nadzemné poschodie obsahuje hlavný vstup do objektu, recepciu, obchod ,reštauráciu s barom, kuchyňu, výťah a evakuačný výťah. Na druhom nadzemnom poschodí sa nachádza 8 izieb pre hostí, zázemie pre upratovačku, multimediálna miestnosť a sklad Čistého a špinavého prádla. Na treťom poschodí je 10 izieb pre hostí a multimediálna miestnosť. Posledné štvrté poschodie obsahuje 8 izieb pre hostí ,multimediálnu miestnosť a terasu s výstupom na strechu. Fasáda bude bielej farby s farebnými pruhmi. Celkové architektonické a stavebné riešenie je vytvorené v súlade a s ohľadom na okolie objektu. Projekt obsahuje technické, tepelné a akustické posúdenia. Parkovisko sa nachádza v areály objektu.
The diploma thesis is the project of the hotel in Gbely. The Hotel is project as a four–storeyed house with one basement. The building is designed as object with twelve flats. The house has flat roof. The above grade masonry is created by Ytong system. The bearing walls in basement is created by Prefa BTB system, interior grade masonry is created by Ytong system. The partitions are created by Ytong system too. The main building entrance is situated to north–east side. In the basement, there are boiler room, alternative energy source, facilities for employees, laundry room, ironing room, air conditioning engine room and storage units. The first elevated floor is content of main entrance to the object, stairway, shop, reception, restaurant and bar, kitchen and elevators. On the second floor, there are eight guest rooms, background for cleaner, multimedia room. On the third there are ten guest rooms and multimedia room. On the fourth floor there are eight guest rooms, multimedia room and terrace with access to the roof. The foreside of exterior walls will be white with colored stripes. General architectonical and structural solution created harmony with neighbourhood. The project contains technical, thermal and acoustic appraisal forms. Parking is located in the hotel area.
Keywords:
acoustic check; basement; bearing wall; elevator; flat roof; four–storeyed house; ground–floor plan; Hotel; room; situation; stairway of concrete; structures of constructions; thermal insulation
Institution: Brno University of Technology
(web)
Document availability information: Fulltext is available in the Brno University of Technology Digital Library. Original record: http://hdl.handle.net/11012/196084