National Repository of Grey Literature 14 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Prestressed girder bridge
Páteček, Tomáš ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
The thesis deals with the design of a new bridge construction at the place of an existing bridge on the road II/39 between the villages of Dobrkovice and Kájov over the river Polečnice. Three studies were developed as a solution. The chosen variant contains the construction of a prestressed girder bridge, simply supported, with a length of bridging 27,464 m. The category of the transferred road is S9,5, a body of transferred road is on both sides of the bridge in the embankment.
Railway bridge across the river Svitava
Findura, David ; Panáček, Josef (referee) ; Nečas, Radim (advisor)
This thesis deals with a design of an one-track railway bridge over the river Svitava. Out of three proposed variants was chosen as the most economical and feasible the variant number 2 - two-beam prestressed bridge with one span. According to actual EN standards the construction was designed and assessed to the serviceability limit state and the ultimate limit state.
Bridge on the local road across the II/464 road
Zalubel, Tomáš ; Nečas,, Radim (referee) ; Panáček, Josef (advisor)
The Bachelor thesis deals with the local road bridge across the road II/464. Construction is proposed in three variants. The selected design was prestressed board length 24 meters, intended as a simple beam. Calculation of load is performed by software SCIA. The construction is evaluated according to current standards. Construction was calculated without the influence of temporal analysis.
Arch bridge across the expressway
Vaněk, Štěpán ; Štefan, Petr (referee) ; Nečas, Radim (advisor)
The objective of this theses is arch bridge design over the expressway. Bridge is consist of bridge deck, which has three pillars and composite arc. The Bridge deck is on the edges fixed into the foundations and in the middle adherent on overhead cables. The bridge is carried by combination of strands and aerial cables mounted on reinforced concrete arch. Overhead cables are slant due to the transverse direction of the bridge in the longitudinal direction is in the direction of the arc. Model of the construction was made in a calculated program SCIA ENGINEER 2011. The designe is in accordance with applicable standards.
Road bridge over the highway by the town Moravský Písek
Novotný, Matěj ; Rušar, Jaromír (referee) ; Klusáček, Ladislav (advisor)
The Diploma thesis deals with the road bridge on tfe road 4951 across the D55 highway. Construction is proposed in three variants. The selected design was prestressed board length 67,65 meters, intended as a continuous beam. Calculation is performed by software SCIA. The construction is evaluated according to current standards.
Bridge over the Morava river
Menšík, Martin ; Nečas, Radim (referee) ; Panáček, Josef (advisor)
The thesis deals with design of a new bridge construction at the place of an existing bridge on the road II/312 in Vlaské village over the Morava river. The main topic is a static calculation of one span loadbearing structure. Three studies were made and one of them was analysed. The bridge is designed as prestressed perpendicular and combined slab-beam construction. Span length of the bridge is 21,8 m. Structural model and effect of the load were calculated in programme Scia Engineer and checked with manual calculation. Effects of temperature, wind and horizontal forces were neglected.
Bridge ower Račí brook
Novotný, Matěj ; Slánský, Bohuslav (referee) ; Panáček, Josef (advisor)
The Bachelor thesis deals with the road bridge on tfe road I/60 across the "Račí" brook. Construction is proposed in three variants. The selected design was prestressed board length18,2 meters, intended as a simple beam. Calculation of load is performed by software SCIA. The construction is evaluated according to current standards.
Road bridge over the highway by the town Moravský Písek
Novotný, Matěj ; Rušar, Jaromír (referee) ; Klusáček, Ladislav (advisor)
The Diploma thesis deals with the road bridge on tfe road 4951 across the D55 highway. Construction is proposed in three variants. The selected design was prestressed board length 67,65 meters, intended as a continuous beam. Calculation is performed by software SCIA. The construction is evaluated according to current standards.
Arch bridge across the expressway
Vaněk, Štěpán ; Štefan, Petr (referee) ; Nečas, Radim (advisor)
The objective of this theses is arch bridge design over the expressway. Bridge is consist of bridge deck, which has three pillars and composite arc. The Bridge deck is on the edges fixed into the foundations and in the middle adherent on overhead cables. The bridge is carried by combination of strands and aerial cables mounted on reinforced concrete arch. Overhead cables are slant due to the transverse direction of the bridge in the longitudinal direction is in the direction of the arc. Model of the construction was made in a calculated program SCIA ENGINEER 2011. The designe is in accordance with applicable standards.
Bridge over the Morava river
Menšík, Martin ; Nečas, Radim (referee) ; Panáček, Josef (advisor)
The thesis deals with design of a new bridge construction at the place of an existing bridge on the road II/312 in Vlaské village over the Morava river. The main topic is a static calculation of one span loadbearing structure. Three studies were made and one of them was analysed. The bridge is designed as prestressed perpendicular and combined slab-beam construction. Span length of the bridge is 21,8 m. Structural model and effect of the load were calculated in programme Scia Engineer and checked with manual calculation. Effects of temperature, wind and horizontal forces were neglected.

National Repository of Grey Literature : 14 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.