Completion of the development and verification of software Flow123D within the project Decovalex 2015
Hokr, M. ; Maryška, J. ; Březina, J. ; Šembera, J. ; Balvín, A. ; Bruský, I. ; Blaheta, Radim ; Hasal, M. ; Michalec, Zdeněk ; Staš, Lubomír
In the framework of the activities of the international project Decovalex attributable to the Czech Republic (SURAO) the aim is to finalize the development and verify the quality and suitability of SW Flow123D for computer modeling of coupled thermo-hydro-mechanical-chemical (THMC) processes fractured granite environment of the tunnels in Bedřichov.
Collection and analysis of data from four voltage probes, SP-47 in the gallery Josef at Mokrsko within the the project MPO FR-TI3/325
Staš, Lubomír ; Souček, Kamil ; Nohejl, Zdeněk ; Kaláb, Tomáš ; Rutar, Tomáš
Text, including tables, graphs and images is a comprehensive annual report to the Treaty on the work of 823/24/10 data collection and evaluation of 4 pieces voltage probes, SP-47 in the gallery Josef at Mokrsko. It contains the results of the evaluation of the measurements of voltage changes in test wells in the immediate vicinity of the borehole stress - thermal sources in solid exploration adit SP-47 in Josef. All measurements were obtained using a strain gauge measuring the conical heads, specially manufactured and installed here for this purpose. Measurements are carried out within the project MPO-TIP FR-TI 3/325 - The importance of the thermal load of rocks - perspectives underground storage of thermal energy.
Methodical instructions for secure stability of mine roadways in great depth
Koníček, Petr ; Šňupárek, Richard ; Konečný, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Waclawik, Petr ; Souček, Kamil ; Staš, Lubomír ; Hortvík, Karel ; Konečný, Pavel
Methodology provides instructions for safe and economic design of roadways for mining and mining design companies in conditions of the Czech part of the Upper Silesian Coal Basin. Methodology covers area of all used roadway support as a steel arch support, rock bolt and cable bolt support as well as methods of grouting for stability and reinforcement of roadways.
Current and potential sources of carbon gas in the Czech part of the Upper Silesian Basin
Waclawik, Petr ; Kukutsch, Radovan ; Staš, Lubomír
Předkládaná odborná studie analyzuje současné a potencionální zdroje karbonského plynu v české části hornoslezské pánve, především však v oblasti, kde již těžba plynu probíhá. Jedná se o těžbu plynu z již uzavřených dolů v ostravské, petřvaldsk a také karvinské dílčí pávni a také o těžbu plynu pocházející z oblasti činných černouhelných dolů v karvinské dílčí pánvi (Doly Darkov, ČSM a Karviná) a v příborské oblasti (Důl Paskov).
The X-ray CT lab and the research at the Institute of Geonics AS CR
Souček, Kamil ; Staš, Lubomír
In recent decades, non-destructive methods of materials analysis (Desrues 2006) have been used increasingly for the study of different kinds of materials. Especially, it concerns the method of the X-ray computed tomography (CT). This technique was invented in 1970's (Hounsfield 1972) and it quickly became an indispensable part of medicine. In the 1980's, this success in medicine encouraged the research and development of the X-ray CT applications in the field of materials engineering and consequently also in the field of geomaterials (Otani, Obara 2004). Nowadays, many applications are possible due to high resolution of individual building units in the tomographic cross-sections (so called voxels) with dimensions of units or tens of micrometres. To get this resolution, the use of the 2D and the 3D high-resolution X-ray CT, or the micro-CT with micro-focal sources of X-rays, and suitable linear or flat (2D) X-Ray detectors are preferred.
Annual report on the project FR-TI3/579 in the TIP project in 2013
Staš, Lubomír
A complete methodology for determining the initial stress tensor of convergence measurements on the two profiles perpendicular to the longitudinal axis of the tunnel was developed and implemented. It was designed and tested algoritmus for optimization that allows to design the location of measurement points in advance on a pair of rails so that measurement errors are eliminated. It was designed a new methodology for measuring convergence, based on the use of a laser beam. Measurements were carried out at the convergence of three different profiles in Dolní Rožná locality.
Dílčí zpráva V/2012 k projektu Hodnocení kvality HM a geotechnický průzkum pro záměr vybudování podzemního zásobníku plynu Milasín-Bukov - Výčet prací na projektu a zhodnocení dosažených výsledků za čtvrté čtvrtletí roku 2012
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Georgiovská, Lucie ; Waclawik, Petr ; Zajícová, Vendula
Dílčí zpráva VI/2013 k projektu Hodnocení kvality HM a geotechnický průzkum pro záměr vybudování podzemního zásobníku plynu Milasín - Bukov - Výčet prací na projektu a zhodnocení dosažených výsledků za čtvrté čtvrtletí roku 2012.
Progress report on the project VIII/2013 Quality Assessment HM and geotechnical exploration plan for the construction of underground gas storage Milasín-beech - List of works on the project and an evaluation of the results for the third quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period July to September 2013, concerning the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.
Progress report on the project VI/2013 Quality Assessment HM and geotechnical exploration plan for the construction of underground gas storage Milasín - Bukov - List of works on the project and an evaluation of the results for the first quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period January-March 2013, concerning the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.
Progress report on the project VII/2013 Quality Assessment HM and geotechnical survey for construction of an underground gas storage Milasín - Bukov - List of works on the project and the achieved results for the second quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period April-June 2013, on the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.