National Repository of Grey Literature 80 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
The realization of the substructure of the Zlín - Příluky office building
Gajdoš, Filip ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This Bachelor´s thesis contains of technological process of groundwork office building. Contains technological instructions of groundwork and foundation, mechanization plan, ensuring quality requirements and construction organization.
Home health services - Bobrová, technological stage of roofing
Malý, Martin ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
The bachelor thesis deals with structural and technological solution to roofing of the house health services in Bobrové, in the Highlands. Addresses the implementation of a truss structure of a gable roof and a subsequent cladding. The main content of the work formed the technical report, the construction situation, the budget with the statement of assessment, technological regulation, construction site equipment, timetable, design of mechanical assembly, inspection and test plan and work safety.
New building of apartment building in Brno - project planning and management of construction
Kratochvílová, Erika ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
Subject of this master´s thesis is project planning and management of construction of Apartment building in Brno. This thesis involves engineering report, block plan and block plan drawing, time schedulings, project of site equipment, design of machine formation, technological regulation of eartworks and nailig wall, test plan of eartworks and nailig wall, work safety for rough structure and budget of rough structure.
Vending and stocking hall VaP Bransouze in Znojmo, upper rough construction
Jaroš, David ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This bachelor’s thesis adresses the technological stage of the upper rough construction of the vending and stocking hall VaP Bransouze i.n.c. in Znojmo. Thesis contains technical report, site equipment, statement of assessment, technological regulativ, organization of contruction, scheduling, mechanical assembly design, controling and testing plan and safety.
Construction of apartment houses Optátova - building technology project
Kynclová, Veronika ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
Diploma work deals Construction of apartment houses Optátova - building technology project. Work includes the technical report, coordination situation, timetable, financial plan, study of realization, drawing of devide construction and his financial and timetable evaluation, next timetable of construction, timetable of main objekct, supplies of building materials, technological specification, inspection and test plan, itemized budget of main object and contract of work. Time methods were compared – gradual, concurrent and current method.
Residential house in Čáslav, gross superstructure
Němec, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This thesis investigates the solution of selected technological project of the construction of gross superstructure residential building in the former barracks Prokopa Holeho. Their work includes the technical report solved object, technological specification, bill of quantities, schedule and budget, addressing broader transport relations, organization development, design of mechanical assemblies, including drawings and technical news site facilities, safety, environmental protection, inspection and test plans.
New construction of block of apartments A1, at Slavkov u Brna - Preparation of the realization construction
Stuchlík, Jaroslav ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This Thesis deals with the organization of realization of the residential building A1 Slavkov u Brna. Thesis solves mainly technological process of realization of the main object. The thesis aims to develop a time schedule of execution, usage of mechanisms timetable, material resources, technological regulations, inspection and test plans. The annex also solved graphically construction site facility set up and its modifications during execution depending on different type of works. This Thesis is based on realization project provided by the realization company and with consent of project designer.
Central hospital buildings in Uherske Hradiste - Building construction technology preparation
Novotný, Zdeněk ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
Multifunctional building Zlin, street Partyzanska - construction technological planning of construction
Haas, Jan ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
The master thesis solves construction technological´s planning of construction multifunctional building in Zlín in the Partyzánská street. The thesis contains concomitant report, technical report, technological regulations of foundational construction, control and test plans, mechanical assembly, project of constructional plant with technical report, safety of operation, calculation and time schelude.
The gross superstructure of the apartment building
Hoferek, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This bachelor’s work deals with the realization of the rough upper construction of the appartment block. The aim was to elaborate the technological regulations, to specify the mechanization for the set technological phase, the occupational safety, the quality of the implementation and the total duration of the phase of the rough upper construction with respect to the economic point of view. The basis for the development of the project was the partial implementing documentation of the building.

National Repository of Grey Literature : 80 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.