Technological stage of the rough substructure of the multifunctional building Vlněna in Brno
Janíček, Peter ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
Bachelor thesis deals with the realization of rough substructure for multifunctional building Vlněna in Brno. It is two storey basements founded in complicated subsoil. Thesis contains draft, adaptation and comparison of variable technological solutions of the chosen phase, technical report of the chosen technological phase, the block plan drawing of transportation roads, location drawing and the technical report of the building site equipment, the technological regulations of monolith reinforced concrete structures, the inspection and testing plan for monolithic structures, the machine set designing, the occupational safety and health care, the cost estimation budget with bill of quantities, the time schedule, the scheme of critical concreting and applicability diagram of tower cranes.
Polymer Systems Centre in Zlín - the Construction Techological Planning
Foltánek, Jan ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
The thesis deals with a technological project of Polymer System Centre in Zlín. It focuses on financial documentation and a time schedule of the construction. The technological project in detail focuses on implementation of a fabric of the Polymer System Centre. The thesis includes a technical report which suggests procedure of the construction. The technological documentation includes a plan of the construction site arrangement, a time schedule, a financial plan for the construction, a budget, a technological report suggesting partitions made of magnesium slabs, a control plan, a test plan and health and safety plan.
Preparation for the construction of an apartment building in Brno - Slatina
Těžký, Filip ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermore, the calculation of the decanting time and the design of the formwork turnover, supplemented by its drawing. In the diploma thesis is elaborated a plan for safety and health protection in the workplace and selected design details.
Preparation of realization of completion of clinical hematology, University Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
Implementation of the bottom construction of the hotel in Strbske pleso
Macho, Andrej ; Doubek, Rostislav (referee) ; Novotný, Michal (advisor)
The subject of this bachelor thesis is to process a building construction project of the lower building of hotel Ovruč in Štrbské Pleso village, Vysoké Tatry. It is focused on realization of soilcrete and foundation structures. This thesis consists of accompanying and summarized technical reports, sitting of the building with regards to transport routes, technological regulations, organisation principles and equipment of building yard, the itemized budget and time schedule, proposition of construction machines configurations, inspection and testing plan, health and safety at work. All relevant technical drawings are included as well.
Extension and construction modifications of the F2 production hall in Hodonice - construction technology project
Laga, Radim ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a complex construction technology project for the realization of three additions to the existing production hall. The work aims at the optimal choice of intertwining the temporal, spatial and technological structure of the construction process in such a way that the work is completed on time, at a pre-agreed price and in the required quality.
Residential complex Troubsko - construction technology plan
Jurák, Ondřej ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
Preparation for the implementation of a high-rise apartment building in Bratislava
Krajčovič, Matúš ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
The subject of this diploma thesis is processing of a construction technological project for the preparation of the realization of a high-rise residential building in Bratislava. The thesis is based on construction technology solution. The content of thesis is a technical report, coordination situation with broader transport relations, time and financial plan, study of realization of technological stages, solution of construction organization including drawing of construction site, design of main construction machines and mechanisms, technological regulation for upsite monolithic construction, control and testing plan, item budget, detail of relief elements of the ceiling structure, drawing of the formwork of the ceiling structural floor, specific research in the field of tower cranes.
Selected parts of the construction-technology plan - kindergarten in Brno
Bartek, Petr ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawings of approaches and processes during construction in its different phases.
Implementation of the top office building in Brno
Hradečný, Štěpán ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This thesis deals with the technological stage of the gross superstructure of an office building in Brno, which is implemented using a complete system solution. It includes logical and chronological following the successful implementation of this project. It contains the engineering report focusing on rough superstructure, addressing broader transport relations, technical report site equipment, technical note of walls and ceilings, inspection and test plan, machine assembly, safety measures and alternative solutions for the lifting mechanism with another theme.