Project of Outgoing Transformer Unit for the Photovoltaic Power Station
Hanák, Miroslav ; Procházka, Aleš (referee) ; Orságová, Jaroslava (advisor)
This master’s thesis engages in project of outgoing transformer unit for the photovoltaic power station. It describes project and its design documentation what conducts to practising of construction. It has compared investing to more expansive transformer what has lower loss. It describes charges of operation’s transformer in twenty years. It leads project of cable low voltage. It compares whether is better to use aluminium or cupric cables. Project is led with respect for investment costs and minimum of operation loss.
Assessment of connectivity of the new source to the 110 kV network
Kopečný, David ; Fojtík, Martin (referee) ; Orságová, Jaroslava (advisor)
This thesis focuses on the connectivity problems of the new sources to the electrical network. The first part of the thesis deals with the description of the new source and the method of its connection to the electrical network. Furthermore, in work, there are elaborated the blocking conditions for substation TR Neratovice expanded distribution point. A distribution network operator must receive an attachment application for connecting before the actual connection. The attachments consist of study cases of conjunction that values the inverse influence on the distributional network and informs the operator about the required measures for the reliable service with the new source. PSS Sincal computer software was used to survey the inverse influences on the distributional network. Based on processed data, the evaluation of conjunction of the synchronous generator to the grid at TR Neratovice substation was reconsidered.
Load Flow Calculation and Design of Distance Protection Relay Settings of 110 kV Overhead Line
Jasenský, Filip ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
Bachelor thesis load flow calculation and design of distance protection relay settings of 110 kV overhead line acquaints with the theory calculation of steady operation, short-circuit conditions and a proposal setting the distance protection. The theoretical part is made an example of a simple calculation to show leadership methods of calculation. The practical part is a calculation of steady operation and short-circuit conditions. Short-circuit ratios are calculated for a single operation and parallel operation of transformers in Otrokovice. Calculated using the initial shock symmetrical output from the calculation of short-circuit conditions is verified by short circuit resistance of substations. The practical section setting the distance protection ABB REL 316*4 and compensation earth faults. Calculation of steady state and short-circuit conditions designed basic operational state of the network, for which the design of a distance protection relay settings.
Influence of RES to power system in Czech Republic
Vánišová, Michaela ; Bartošík, Tomáš (referee) ; Mastný, Petr (advisor)
This text deals with renewable energy sources in terms of working on the electricity network of the Czech Republic. There is the definition of renewable energy sources in the work. Next there are discussed the basic information about connecting to the distribution network. In two parts, there is mentioned and discussed the issue of operation of renewable energy resources and their effects in terms of the electricity network. The last chapter is focused on the possibility of further utilization of renewable energy sources because of their natural energy.
Calculation of the profile busbar conductors in distribution equipment
Veselý, Tomáš ; Wasserbauer, Vojtěch (referee) ; Novotný, Jan (advisor)
Proportioning of busbar system for thermal and dynamic effects of short circuit current in terms of safety and economic efficiency is very important. Bachelor thesis is focused on inspection of these effects on busbars. Theoretical analysis deals with the calculation of characteristic values of short circuit current. The study also processed the principle dimensioning of the profile wires for busbars. The main part consists of designing the effects of short circuit current. In the practical part of the work was created calculation program in MS Excel, which deals with the design of the bus, resistant to the effects of short circuit current. The program also allows you to check the busbar-known dimension to the thermal and dynamic effects.
Assessment of connectivity of the new source to the 110 kV network
Kopečný, David ; Fojtík, Martin (referee) ; Orságová, Jaroslava (advisor)
This thesis focuses on the connectivity problems of the new sources to the electrical network. The first part of the thesis deals with the description of the new source and the method of its connection to the electrical network. Furthermore, in work, there are elaborated the blocking conditions for substation TR Neratovice expanded distribution point. A distribution network operator must receive an attachment application for connecting before the actual connection. The attachments consist of study cases of conjunction that values the inverse influence on the distributional network and informs the operator about the required measures for the reliable service with the new source. PSS Sincal computer software was used to survey the inverse influences on the distributional network. Based on processed data, the evaluation of conjunction of the synchronous generator to the grid at TR Neratovice substation was reconsidered.
Load Flow Calculation and Design of Distance Protection Relay Settings of 110 kV Overhead Line
Jasenský, Filip ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
Bachelor thesis load flow calculation and design of distance protection relay settings of 110 kV overhead line acquaints with the theory calculation of steady operation, short-circuit conditions and a proposal setting the distance protection. The theoretical part is made an example of a simple calculation to show leadership methods of calculation. The practical part is a calculation of steady operation and short-circuit conditions. Short-circuit ratios are calculated for a single operation and parallel operation of transformers in Otrokovice. Calculated using the initial shock symmetrical output from the calculation of short-circuit conditions is verified by short circuit resistance of substations. The practical section setting the distance protection ABB REL 316*4 and compensation earth faults. Calculation of steady state and short-circuit conditions designed basic operational state of the network, for which the design of a distance protection relay settings.
Calculation of the profile busbar conductors in distribution equipment
Veselý, Tomáš ; Wasserbauer, Vojtěch (referee) ; Novotný, Jan (advisor)
Proportioning of busbar system for thermal and dynamic effects of short circuit current in terms of safety and economic efficiency is very important. Bachelor thesis is focused on inspection of these effects on busbars. Theoretical analysis deals with the calculation of characteristic values of short circuit current. The study also processed the principle dimensioning of the profile wires for busbars. The main part consists of designing the effects of short circuit current. In the practical part of the work was created calculation program in MS Excel, which deals with the design of the bus, resistant to the effects of short circuit current. The program also allows you to check the busbar-known dimension to the thermal and dynamic effects.
Influence of RES to power system in Czech Republic
Vánišová, Michaela ; Bartošík, Tomáš (referee) ; Mastný, Petr (advisor)
This text deals with renewable energy sources in terms of working on the electricity network of the Czech Republic. There is the definition of renewable energy sources in the work. Next there are discussed the basic information about connecting to the distribution network. In two parts, there is mentioned and discussed the issue of operation of renewable energy resources and their effects in terms of the electricity network. The last chapter is focused on the possibility of further utilization of renewable energy sources because of their natural energy.
Project of Outgoing Transformer Unit for the Photovoltaic Power Station
Hanák, Miroslav ; Procházka, Aleš (referee) ; Orságová, Jaroslava (advisor)
This master’s thesis engages in project of outgoing transformer unit for the photovoltaic power station. It describes project and its design documentation what conducts to practising of construction. It has compared investing to more expansive transformer what has lower loss. It describes charges of operation’s transformer in twenty years. It leads project of cable low voltage. It compares whether is better to use aluminium or cupric cables. Project is led with respect for investment costs and minimum of operation loss.