National Repository of Grey Literature 4 records found  Search took 0.02 seconds. 
Safety of off-grid hybrid energy system operation
Orság, Štěpán ; Vrána, Michal (referee) ; Morávek, Jan (advisor)
The thesis deals with the safety of hybrid systems in island operation. The safety requirements for electrical installation with photovoltaic system and protection against electric shock are discussed. Hybrid battery systems have a lower short-circuit performance in islanded operation, compared to parallel operation with the distribution grid, so the thesis focuses on the specifics of islanded operation and the use of protections that are part of the PV inverter or electrical installation. The work includes the design of test procedures and measurements on selected inverters with subsequent evaluation and recommendation of further protection measures.
Steady state and short-circuit conditions within E.ON 110kV power network at bridge operation of transformers T402 and T403 in 400/100kV transformer station Sokolnice
Bernát, Jan ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
The master’s thesis deals with a calculation of steady state and short-circuit conditions in a 110 kV system during a bridge operation of transformers in a Sokolnice substation. The theoretical part of the thesis deals with a calculation of steady state of a system using Newton’s iterative method, it investigates short-circuits – their timing, distinctive values and a method of their calculation. In the practical part the 100 kV grid supplied from Sokolnice substation is described. The main goal of the thesis is a comparation of two basic wirings: bridge operation of T202 and T203 transformers (contemporarily in service) and bridge operation of T402 and T403 (in service after 2017). These two wirings were controlled even during one state of emergency during which the Sokolnice substation will be affected by an outage of one busbar. Voltage conditions, loading of power line and transformers and overall power balance were controlled. Short-circuit conditions were also calculated and short-circuit resistance of particular substations was inspected. In the conclusion technical measures needed to ensure smooth bridge operation of convertors T402 and T403.
Safety of off-grid hybrid energy system operation
Orság, Štěpán ; Vrána, Michal (referee) ; Morávek, Jan (advisor)
The thesis deals with the safety of hybrid systems in island operation. The safety requirements for electrical installation with photovoltaic system and protection against electric shock are discussed. Hybrid battery systems have a lower short-circuit performance in islanded operation, compared to parallel operation with the distribution grid, so the thesis focuses on the specifics of islanded operation and the use of protections that are part of the PV inverter or electrical installation. The work includes the design of test procedures and measurements on selected inverters with subsequent evaluation and recommendation of further protection measures.
Steady state and short-circuit conditions within E.ON 110kV power network at bridge operation of transformers T402 and T403 in 400/100kV transformer station Sokolnice
Bernát, Jan ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
The master’s thesis deals with a calculation of steady state and short-circuit conditions in a 110 kV system during a bridge operation of transformers in a Sokolnice substation. The theoretical part of the thesis deals with a calculation of steady state of a system using Newton’s iterative method, it investigates short-circuits – their timing, distinctive values and a method of their calculation. In the practical part the 100 kV grid supplied from Sokolnice substation is described. The main goal of the thesis is a comparation of two basic wirings: bridge operation of T202 and T203 transformers (contemporarily in service) and bridge operation of T402 and T403 (in service after 2017). These two wirings were controlled even during one state of emergency during which the Sokolnice substation will be affected by an outage of one busbar. Voltage conditions, loading of power line and transformers and overall power balance were controlled. Short-circuit conditions were also calculated and short-circuit resistance of particular substations was inspected. In the conclusion technical measures needed to ensure smooth bridge operation of convertors T402 and T403.