National Repository of Grey Literature 10 records found  Search took 0.00 seconds. 
Technological stage of realization floors of annex administrative - production building in Kroměříž
Bureš, Petr ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves technological stage of realization floors of annex administrative production building in Kroměříž. In the main part of bachelor thesis there are technological regulations. There is described the realization bearing layer of wire reinforced concrete, electric underfloor heating, epoxy coating, ceramic tiles and PVC. The bachelor thesis also contains solving of the situation with wider relationships transport routes, the bill of quantities, construction site, time schedule, suggestion of machine composition, control and test plan, safety and health protection at work and itemizet budget.
Construction technology study stage of realization floors in the sports hall
Šaroun, Vít ; Šťastný, Jiří (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the sports hall. The building is situated in Nové Město na Moravě. The thesis processes designed layers in facilities and sports ground.
Construction Technology implementation of stage floor in the production hall
Hrabovský, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the production hall. The building is single-staged production hall in one part connected to current object. Technological regulation solves the implementation of waterproof isolation, concrete bearing place and wire reinforced concrete. The bachelor thesis includes technical report, situation of construction in wide relations with road infrastructure, technological regulation, technical report for constructional equipment, time schedule, control and test plan, protection of health and safety, comparison variants of industrial floors, itemized budget and constructional equipment for technological implementation of stage industrial floor.
Kabeltechnik Mikulov - construction and technological preparation
Dvořáková, Michaela ; Novotný, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
Construction of the hall with the administration, Velká Bíteš - solution of the stage floors
Kladivo, Jiří ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
For my bachelor thesis I´ve chosen a topic concerning the stages of floors in a building which is composed of two parts. The first part is a storage hall and the second is two – floor administrative building. This building is situated to the south of Velká Bíteš. This thesis contains technological instructions and a checking and testing plan for these two buildings, which is used for the construction of the floors. Others parts of my bachelor thesis are: omnibus technical report, the facilities of the building site, suggestion of machine composition, healt and safety at work, the situation of wider relations, itemized budget and the time schedule.
Construction technology study stage of realization floors in the sports hall
Šaroun, Vít ; Šťastný, Jiří (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the sports hall. The building is situated in Nové Město na Moravě. The thesis processes designed layers in facilities and sports ground.
Kabeltechnik Mikulov - construction and technological preparation
Dvořáková, Michaela ; Novotný, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
Construction Technology implementation of stage floor in the production hall
Hrabovský, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the production hall. The building is single-staged production hall in one part connected to current object. Technological regulation solves the implementation of waterproof isolation, concrete bearing place and wire reinforced concrete. The bachelor thesis includes technical report, situation of construction in wide relations with road infrastructure, technological regulation, technical report for constructional equipment, time schedule, control and test plan, protection of health and safety, comparison variants of industrial floors, itemized budget and constructional equipment for technological implementation of stage industrial floor.
Technological stage of realization floors of annex administrative - production building in Kroměříž
Bureš, Petr ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves technological stage of realization floors of annex administrative production building in Kroměříž. In the main part of bachelor thesis there are technological regulations. There is described the realization bearing layer of wire reinforced concrete, electric underfloor heating, epoxy coating, ceramic tiles and PVC. The bachelor thesis also contains solving of the situation with wider relationships transport routes, the bill of quantities, construction site, time schedule, suggestion of machine composition, control and test plan, safety and health protection at work and itemizet budget.
Construction of the hall with the administration, Velká Bíteš - solution of the stage floors
Kladivo, Jiří ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
For my bachelor thesis I´ve chosen a topic concerning the stages of floors in a building which is composed of two parts. The first part is a storage hall and the second is two – floor administrative building. This building is situated to the south of Velká Bíteš. This thesis contains technological instructions and a checking and testing plan for these two buildings, which is used for the construction of the floors. Others parts of my bachelor thesis are: omnibus technical report, the facilities of the building site, suggestion of machine composition, healt and safety at work, the situation of wider relations, itemized budget and the time schedule.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.