National Repository of Grey Literature 12 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Winery
Koláčková, Jana ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor)
The diploma thesis deals with project of a new building of winery production. Winery has one floor and a basement. We can split the winery into three parts. First part – production. This whole part is dedicaded to the production of wine. It consists of spaces where grapes are degraded, fermented, pressed, stored, bottled, labeled and subsequently exported. Production has a volume of 300 000 l of wine. Second part is for administration. There are two offices and a confrence room. Third part is for public using and it is composed of the tasting room with view at the wineyard and of the retail hall. The structural system is prefabricated skeleton of reinforced concrete. The roof is constructed as a flat green roof.
SEKT WINERY PETRAK
Eliáš, Václav ; Myslín,, Jiří (referee) ; Dýr, Petr (advisor) ; Čuprová, Danuše (advisor)
The assignment of the bachelor’s thesis is a design of a new production building for the production of wine and sparkling wine. Within the framework of this bachelor’s thesis the elaboration of the project documentation for the building permit and for the detail design documentation, using architectural software, was requested. This project has already been done in the form of a study in the second year during the winter term as a part of the subject AG32 (Studio of Architectural Design III. – production buildings), followed by the subject AG028 (Detail in Architecture II.). Also one of the parts of this project has also been elaborated in the subject AG06 (Complex Project) which the bachelor’s thesis follows. The purpose of the developed study was to solve the correct functional and operational scheme and also to provide an aesthetical and a representative aspect on which the construction documentation is being elaborated. The site with the property is located in a city Kobyli na Morave in the South Moravian Region, district Breclav. The site is currently undeveloped and covered with natural greenery. The proposed property has three floors and each of them is divided into three functional units – production, representative and accomodation one. The site’s terrain is quite sloped which helped with embedding the production unit under it – this unit is located on the lowest floor and this helps for the object to fit into the surrounding and leads to the impression that it has a similar size and form as other buildings in the city. As it was already mentioned before the production is underneath the terrain’s level. On the following floor a winery, degustation, a terrace, an office and a wheelchair accesible accomodation are located. And on the last floor there is space for accomodation. The building’s greenery has also been designed – some trees, shrubs, ornamental flowers and an orchard with a set of varietes of wine.
Industrial bakery Herold Brno
Pohludka, Jan ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The aim of the Bachelor thesis was to create the resulting degrees of project documentation for the architectural study I had made in the subject AG35. Herold company engaged in bakery manufactoring since year 1993 and has become an important regional supplier. The new building in Brno – Heršpice ensure the company will expand production capacity and will move closer to area of marketing. Herold company will use the building for producing breads, rolls and other bakery products. Production process will realize in three work shifts a day. The most numerous will be the night one. The building will contain also an administrative and managing part of all Herold company. The new building is an industrial building with ground plan dimensions approximately 84 x 32 meters. The project respects the place and the surroundings. Three cardinal points are surrounded by unimpressive industrial buildings but the fourth-North side is properly oriented toward the residential buildings with the silhouette of Petrov and Špilberk castle. Therefore it is oriented to the North. The building is composed of two cubic masses – the taller one and the smaller one – according to the required clear height in interior. The architectural shape is subordinate to function and the design should be maximally minimalist without any additional masses. The most important idea in the project is keeping transparency and clarity adapted to human scale. A functional architecture should show where we can enter and on the contrary where the restricted areas are. It should reflect the current architectural tendencies and the local genius loci and also represented the owner. That’s why Herold company aren´t surrounded by fence. On the other way there is projected extensive grassy area in contrast of industrial building. Prefering functional disposition and architectural elements (ribbon window, free glass facade, connection with the nature, flat roof, etc.) refer to the Functionalism history of Brno.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
Rentable object
Sotolářová, Alžběta ; Vranová, Daniela (referee) ; Boleslavská, Yvona (advisor) ; Kacálek, Petr (advisor)
The assignment of the Bachelor thesis on the topic Rentable object Brno is to propose suitable building for small business and enterprise. The building site is located in the Brno-Kohoutovice district. The closest neighbourhood is built-up by the production and administrative complex, residential buildings and community services. The site of 11 666 m2 is slightly sloping, it is not used currently, it is overgrown with natural greenery. The task was to design a building with small modules inside for renting them to companies or craftsmen. My design suggests a complex of three new buildings with flexible and variable rentable spaces for commercial activities related to craft production. The biggest building is a production hall, two smaller ones are for staff zone and management. The basic masses are blocks of different sizes. The block of the three-storey production hall is partially wrapped into expanded metal that covers the exterior gallery. The vertical and horizontal walkways are designed in contrasting colours: yellow and white. The building envelope below the perforated sheet is made of insulated aluminium panels. The interior is divided into individual production modules. These cabins need higher ceiling, so they are over 2 floors. They are separated by system of movable partition walls thanks to which each workspace can be extended according to requirements.
Structural assessment of the existing reinforced-concrete frame structure of the production building
Pražan, Jiří ; Krůpa, Pavel (referee) ; Girgle, František (advisor)
The diploma thesis deals with the structural assessment of the existing reinforced concrete frame structure of the production building. The structure under consideration is carried out as a reinforced concrete monolithic frame structure with a discrepancy of 6,15 x 6,15 m (axis). The object has a rectangular plan of 13 x 9 fields. The total dimension is 56 x 81m and is divided into three dilation units on all floors by two inserted 3,65 m wide fields. The building has three above-ground floors and one underground floor. The construction height of the basement is 3,675 m, above ground level 4,0 m. On the west side of the building (axis A) are three reinforced concrete elevator shafts with a dimension of approximately 4,5 x 3,8 m. The envelope and inner partitions are made of bricks full of burned. The work shall include a static assessment of the status quo, a determination of the load capacity and a proposal for appropriate adjustments to ensure static reliability.
Rentable object
Sotolářová, Alžběta ; Vranová, Daniela (referee) ; Boleslavská, Yvona (advisor) ; Kacálek, Petr (advisor)
The assignment of the Bachelor thesis on the topic Rentable object Brno is to propose suitable building for small business and enterprise. The building site is located in the Brno-Kohoutovice district. The closest neighbourhood is built-up by the production and administrative complex, residential buildings and community services. The site of 11 666 m2 is slightly sloping, it is not used currently, it is overgrown with natural greenery. The task was to design a building with small modules inside for renting them to companies or craftsmen. My design suggests a complex of three new buildings with flexible and variable rentable spaces for commercial activities related to craft production. The biggest building is a production hall, two smaller ones are for staff zone and management. The basic masses are blocks of different sizes. The block of the three-storey production hall is partially wrapped into expanded metal that covers the exterior gallery. The vertical and horizontal walkways are designed in contrasting colours: yellow and white. The building envelope below the perforated sheet is made of insulated aluminium panels. The interior is divided into individual production modules. These cabins need higher ceiling, so they are over 2 floors. They are separated by system of movable partition walls thanks to which each workspace can be extended according to requirements.
SEKT WINERY PETRAK
Eliáš, Václav ; Myslín,, Jiří (referee) ; Dýr, Petr (advisor) ; Čuprová, Danuše (advisor)
The assignment of the bachelor’s thesis is a design of a new production building for the production of wine and sparkling wine. Within the framework of this bachelor’s thesis the elaboration of the project documentation for the building permit and for the detail design documentation, using architectural software, was requested. This project has already been done in the form of a study in the second year during the winter term as a part of the subject AG32 (Studio of Architectural Design III. – production buildings), followed by the subject AG028 (Detail in Architecture II.). Also one of the parts of this project has also been elaborated in the subject AG06 (Complex Project) which the bachelor’s thesis follows. The purpose of the developed study was to solve the correct functional and operational scheme and also to provide an aesthetical and a representative aspect on which the construction documentation is being elaborated. The site with the property is located in a city Kobyli na Morave in the South Moravian Region, district Breclav. The site is currently undeveloped and covered with natural greenery. The proposed property has three floors and each of them is divided into three functional units – production, representative and accomodation one. The site’s terrain is quite sloped which helped with embedding the production unit under it – this unit is located on the lowest floor and this helps for the object to fit into the surrounding and leads to the impression that it has a similar size and form as other buildings in the city. As it was already mentioned before the production is underneath the terrain’s level. On the following floor a winery, degustation, a terrace, an office and a wheelchair accesible accomodation are located. And on the last floor there is space for accomodation. The building’s greenery has also been designed – some trees, shrubs, ornamental flowers and an orchard with a set of varietes of wine.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
Winery
Koláčková, Jana ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor)
The diploma thesis deals with project of a new building of winery production. Winery has one floor and a basement. We can split the winery into three parts. First part – production. This whole part is dedicaded to the production of wine. It consists of spaces where grapes are degraded, fermented, pressed, stored, bottled, labeled and subsequently exported. Production has a volume of 300 000 l of wine. Second part is for administration. There are two offices and a confrence room. Third part is for public using and it is composed of the tasting room with view at the wineyard and of the retail hall. The structural system is prefabricated skeleton of reinforced concrete. The roof is constructed as a flat green roof.

National Repository of Grey Literature : 12 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.