National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Modernisation of agricultural building
Seifert, Jan ; Procházka, Jiří (referee) ; Sobotka, Jindřich (advisor)
The project deals with the modernization of the agricultural building which leads to a change of the using building. In an effort was to make use of the building which goes to into ruin and to create jobs in this location. The building is located on the plot no. 212 on the north of outskirts of Opatovice I.. In the area there is a cowshed and a silage trough. The former cowshed will be rebuilt into a woodworking facility constituted by manufacturing and administrative part. The silage trough will be used as a waste stock. A new outdoor wood store will be built in the northwest part of the plot. The administrative building will be added to the main building with a basement made from permanent formwork. The ground floor and the first floor are made of clay bricks and reinforced concrete cross-reinforced slab 150 mm thick. The internal partitions in the 1st floor are made of clay block prartitions 115 mm thick. The internal partitions in the 2nd floor are plasterboard 100 mm thick. Rebuilding involves a large number of demolition work for example new openings in existing walls. The whole woodworking facility will be insulated by a certified thermal insulation system 100 mm thick on the production part and 180 mm thick on the administrative part. The object is covered with saddle roof shaped letter "T" with a sheet metal cover. The original hard landscaping will be replaced by an asphalt road.
Construction technological project of the production hall in Sudoměřice
Kolacia, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
Construction technological project of the production hall in Sudoměřice
Kolacia, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
Modernisation of agricultural building
Seifert, Jan ; Procházka, Jiří (referee) ; Sobotka, Jindřich (advisor)
The project deals with the modernization of the agricultural building which leads to a change of the using building. In an effort was to make use of the building which goes to into ruin and to create jobs in this location. The building is located on the plot no. 212 on the north of outskirts of Opatovice I.. In the area there is a cowshed and a silage trough. The former cowshed will be rebuilt into a woodworking facility constituted by manufacturing and administrative part. The silage trough will be used as a waste stock. A new outdoor wood store will be built in the northwest part of the plot. The administrative building will be added to the main building with a basement made from permanent formwork. The ground floor and the first floor are made of clay bricks and reinforced concrete cross-reinforced slab 150 mm thick. The internal partitions in the 1st floor are made of clay block prartitions 115 mm thick. The internal partitions in the 2nd floor are plasterboard 100 mm thick. Rebuilding involves a large number of demolition work for example new openings in existing walls. The whole woodworking facility will be insulated by a certified thermal insulation system 100 mm thick on the production part and 180 mm thick on the administrative part. The object is covered with saddle roof shaped letter "T" with a sheet metal cover. The original hard landscaping will be replaced by an asphalt road.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.