Execution of Superstructure - House in Třebíč
Hájek, Tomáš ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this bachelor thesis is construction technological solution of the execution of superstructure – house in Třebíč. The content of the thesis is the accompanying report and the summary technical report of the building, the situation of the construction and the solution of the relations of the wider transport routes, the technological regulations for the implementation of vertical supporting and non-supporting structures and the implementation of the reinforced concrete monolithic ceiling structure, the design of machine assembly, conception of site facilities, safety and health protection at site, and control and test plans for the implementation of masonry structures and for the implementation of vertical and horizontal reinforced concrete monolithic structures.
Implementation of Superstructure of Apartment Building in Havirov
Kolmačka, Ondřej ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
This bachelor's thesis deals with the elaboration of a technological project for the stage of rough superstructure of an apartment building in Havířov. The vertical construction system of the apartment building is made of sand-lime blocks. The horizontal construction system consists of monolithic reinforced concrete structures. The content of this bachelor's thesis is the elaboration of a technical report on a construction technology project, the situation of construction with closer transport relationships, construction supply design, item budget for selected technological processes, technological regulation for vertical structures - masonry, construction organization for a given technological stage, including equipment drawing. construction site, time schedule for the technological stage, balance of resources, technological analysis, design of machinery for the technological stage, quality requirements and their provision in the implementation of vertical load-bearing structures – masonry and occupational safety of the solved technological stage. Furthermore, the calculation of the construction according to technical and economic indicators, the accompanying and summary technical report and diagrams.
Construction technology preparation of hotel in Ostrožská Nová ves
Khamzina, Mariia ; Řihák, Pavel (referee) ; Doubek, Rostislav (advisor)
The subject of this diploma thesis is civil technical project of a new building of the hotel Aztec in Ostrožská Nová Ves. The building was designed as a 6-storey building and will be used for accommodation and recreation. Thesis contains engineering report, a detailed time schedule for the main building object, project of construction site, technological notes and inspection and test plans for particular steps of construction, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes protection of health and safety at work taking into account environmental protection.
Execution of superstructure of an extension of a production hall in Veřovice
Šilhová, Kristýna ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of work is the solution of stage gross superstructure of production hall in the village of Veřovice. The work includes construction and technological report, site facilities, solving traffic routes from the production to the place of construction, tech-nological specification for prefabricated skeleton and sheathing, the most appropriate machine assembly, schedule, costing, inspection and test plan, safety work.
Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Realization of Roofing of Multifunctional House in Brumov
Šánek, Adam ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The bachelor thesis deals with the roofing of a multifunctional house in Brumov-Bylnice. It is the processing of technological regulations for carpentry and plumbing. The content of the thesis is a technical report focusing on the given technological stages, solution of traffic relations, statement of measurements, technological regulation for carpentry and plumbing, solution of construction organization including situation, time schedule, design of machine assembly, inspection and test plan, solving the difficult construction details of the roof truss.
Technological stage of the rough superstructure of the Jaroslavice mill
Janeček, Milan ; Bříza, Lukáš (referee) ; Kantová, Radka (advisor)
This bachelor's thesis deals with the design and technological solution for the implementation of the rough superstructure of the press in Jaroslavice. The con-tent of the work is an accompanying report and summary technical report of the building, the construction situation and the solution of relations of wider trans-port routes, technological regulations for the implementation of ceramic structu-res and for the implementation of wooden ceiling construction, machine design, site equipment solutions, safety and health solutions construction sites and in-spection and test plans for the execution of ceramic structures and for the executi-on of wooden ceiling structures.
Polyfunctional Building VEKTOR in Pardubice, Preparation for Building Realization
Vančura, Jaroslav ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The subject of the diploma thesis is construction technology project of polyfunctional building VEKTOR in Pardubice. Building object has seven overground floors and has not basement. The construction system of the building is a monolithic skeleton consisting of columns and a ceiling slab. Part of the thesis includes technical reports, construction technology study, situation with wider transport route relationships, the project of the construcion zone equipment, suggestion of machines and mechanisms, plan for securing material resources, technological regulation for monolithic constructions, control and test plan for monolithic constructions, item budget, time schedule, chronological and financial plan of the building – object.
Constructive technological project of polyfunctional house with nursing service
Křístková, Nikola ; Jakubíček, Jiří (referee) ; Diaz, Yvetta (advisor)
Diploma thesis is focused on the constructional project of the polyfunctional house with care service in the Havířov. The object consists of three blocks that are interconnected by the central corridor. Each block has four aboveground floors and one underground floor. The project solved the time and financial plan, the broader transport relations, the construction site equipment, the main construction machines and mechanisms, the study of the implementation of the main construction stages, the technological regulation for the horizontal supporting structures and the truss roof including the control and test plan, monolithic and brick structures.
Construction of the Hotel Karpaty in Valašské Klobouky
Šánek, Adam ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.