National Repository of Grey Literature 6 records found  Search took 0.00 seconds. 
The implementation phase of gross upper structure of a residential building
Brůžek, Zdeněk ; Čech, David (referee) ; Venkrbec, Václav (advisor)
The bachelor's thesis deals with the solution of selected technological study for construction of residential building. The main content of this work is the technological realization of the main technological stages with a detailed focus on gross upper structure. For the gross stage of the upper structure are developed technological processes for the implementation of masonry construction and installation of ceiling construction, time and financial plan, mechanization plan and design of site equipment.
Poděbradská Commercial and Administrative Center - construction technology project
Kmeť, Peter ; Boháček, Adam (referee) ; Biely, Boris (advisor)
This diploma thesis focuses on construction technology preparation of shopping center in Prague 9, Vysočany. The aim of this work was to choose an appropriate construction process. The thesis contains general information about construction with construction technology project, its financial and time consuming, facilities for construction and traffic situation in the surroundings of the construction, design of main machinery and mechanisms, technological regulation with control and test plan. The diploma thesis is focused on piles realization.
The technological stage of the underground construction of the New Mill - Fatra
Wiesner, Jan ; Brandtner, Michal (referee) ; Kantová, Radka (advisor)
The content of this bachelor thesis is the technological stage of the rough substructure of the industrial building Nová Válcovna - Fatra. The work deals with the technological regulation for foundation structures, which will be drawn up control and test plan, time schedule, itemized budget. It also includes a coordination situation, a drawing of the construction site equipment, a design of the machine assembly, a drawing of the construction site equipment, and the safety of the technological stage. In addition, several schemes for the execution of individual structures and an energy performance certificate have been developed for this technological stage.
Poděbradská Commercial and Administrative Center - construction technology project
Kmeť, Peter ; Boháček, Adam (referee) ; Biely, Boris (advisor)
This diploma thesis focuses on construction technology preparation of shopping center in Prague 9, Vysočany. The aim of this work was to choose an appropriate construction process. The thesis contains general information about construction with construction technology project, its financial and time consuming, facilities for construction and traffic situation in the surroundings of the construction, design of main machinery and mechanisms, technological regulation with control and test plan. The diploma thesis is focused on piles realization.
The technological stage of the underground construction of the New Mill - Fatra
Wiesner, Jan ; Brandtner, Michal (referee) ; Kantová, Radka (advisor)
The content of this bachelor thesis is the technological stage of the rough substructure of the industrial building Nová Válcovna - Fatra. The work deals with the technological regulation for foundation structures, which will be drawn up control and test plan, time schedule, itemized budget. It also includes a coordination situation, a drawing of the construction site equipment, a design of the machine assembly, a drawing of the construction site equipment, and the safety of the technological stage. In addition, several schemes for the execution of individual structures and an energy performance certificate have been developed for this technological stage.
The implementation phase of gross upper structure of a residential building
Brůžek, Zdeněk ; Čech, David (referee) ; Venkrbec, Václav (advisor)
The bachelor's thesis deals with the solution of selected technological study for construction of residential building. The main content of this work is the technological realization of the main technological stages with a detailed focus on gross upper structure. For the gross stage of the upper structure are developed technological processes for the implementation of masonry construction and installation of ceiling construction, time and financial plan, mechanization plan and design of site equipment.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.