|
Okříšky bypass - location study
Vidlák, Pavel ; Sabadáš, Petr (referee) ; Radimský, Michal (advisor)
The aim of this master´s thesis is to design version of bypass of small town Okříšky, which is located in Vysočina district. The design of the route is expected to be 3 kilometers long. The goal is to design horizontal and vertical solution of the route, which begins on projected part of the road II/405 aprox. 2 kilometers behiond Zašovice village and continues around small down Okříšky in the direction to Třebíč, where the road connects to existing road II/405. The road will be designed so that costs of the design and subsequent realisation will be minimized. And also environmental impact will be taken into consideration. The project documentation will be used as study in relation to construction of road II/405.
|
|
Memristor with PWL-type characteristic
Holas, Jiří ; Hájek, Karel (referee) ; Biolek, Dalibor (advisor)
Bachelor’s thesis deals with an analog emulation of memristor memory with PWL-type characteristic which is designed for modern digital memories. The first part of the document summarizes the basic memristor characteristics and rules of their proper modeling. The next parts present the circuit implementation and computer simulation. The printed circuit board design and prototype measurement are included.
|
| |
|
Memristor with PWL-type characteristic
Holas, Jiří ; Hájek, Karel (referee) ; Biolek, Dalibor (advisor)
Bachelor’s thesis deals with an analog emulation of memristor memory with PWL-type characteristic which is designed for modern digital memories. The first part of the document summarizes the basic memristor characteristics and rules of their proper modeling. The next parts present the circuit implementation and computer simulation. The printed circuit board design and prototype measurement are included.
|
|
Okříšky bypass - location study
Vidlák, Pavel ; Sabadáš, Petr (referee) ; Radimský, Michal (advisor)
The aim of this master´s thesis is to design version of bypass of small town Okříšky, which is located in Vysočina district. The design of the route is expected to be 3 kilometers long. The goal is to design horizontal and vertical solution of the route, which begins on projected part of the road II/405 aprox. 2 kilometers behiond Zašovice village and continues around small down Okříšky in the direction to Třebíč, where the road connects to existing road II/405. The road will be designed so that costs of the design and subsequent realisation will be minimized. And also environmental impact will be taken into consideration. The project documentation will be used as study in relation to construction of road II/405.
|