National Repository of Grey Literature 156 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Planning and implementation of construction project by the contractor
Vydrová, Michaela ; Dvořák, Jiří (referee) ; Nový, Martin (advisor)
This thesis deals with the planning and implementation of construction project by the contractor. In the theoretical part, I wrote the basic concepts of project management, construction participants and temporal models of construction. Furthermore, I focused on the public procurement and its by tendering documentation. In the practical part I focused on a specific project, where I proposed an alternative course of the contract and the contract followed from its very beginning to evaluation.
Apartment buildings in Pardubice - Project planning and management
Skřivánek, Jan ; Sedlák,, Petr (referee) ; Motyčka, Vít (advisor)
The final thesis contains selected parts of construction technological project, this project are defined by a apartment building complex in Pardubice, Dubinská. This thesis deals with first two buildings with four flours and a basement. Coordination site plan, time and financial schedule including machinery setting, a study of main technological phases, construction site facility project, main technological machinery design, technological standard and time schedule, technological regulation for basement monolithic constructions, inspection and trial schedule with drawing of facing to it are regarded as parts of construction technological project.
Preparation for the implementation of cascading buildings Olomouc - Hejčín
Zaťko, Ondřej ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The content of this thesis is the construction of new technological project of apartment buildings A and B in Olomouc. Residential buildings A and B are identical, but are differently oriented to the cardinal points. Buildings are designed terraces. Buildings have a 4th floor 1PP. The supporting structure is made of monolithic reinforced concrete columns and ceilings. Infill walls are composed of ceramic blocks. In the 1st floor are located garage, the other floors are designed as residential.
Financing of Public Building Order from the Aspect of Supplier
Troanská, Eva ; Hrdlička, Michal (referee) ; Hroníková, Marta (advisor)
Financing of construction contracts is one of the most important phases, where aim of every construction company, is to achieve the highest profit, thus ensuring the business. To the financing of construction contracts are used the own and mostly foreign sources. The procurement is linked with using subsidies from the European Union. In the theoretical part of this thesis there are described the basic concepts relating to public contracts pursuant to Act No. 137/2006 Sb. and financing, both in terms of suppliers and contracting authorities and the actual course of implementation. The practical part deals with the financing of specific public construction contract.
Implementation of Security System in Practise
Havlíček, David ; Bartuše, Jiří (referee) ; Ondrák, Viktor (advisor)
The aim of my bachelor thesis is to accomplish safety analysis of an enterprise, evaluate current state, submit the most applicable proposal of a solution, make a budget and familiarize investor with the results. After the investor's approval, practical implementation and proof of practicality of security systems will be executed.
Design and Realization of Acoustic Adjustments of Listening Room
Vajda, Michal ; Miklánek, Štěpán (referee) ; Schimmel, Jiří (advisor)
This bachelor thesis is devoted to the design of acoustic modifications of residential space and the subsequent implementation of these modifications. Its aim is to design an optimal solution of the space for listening to music in accordance with the Czech Technical Standards. The basic parameters investigated are reverberation time and acoustic quality criteria. The thesis deals with simulation in the EASE modelling program and addresses situations before and after acoustic treatment. The following methods and procedures are used to comprehensively address the above mentioned treatments and to achieve the set objective. Furthermore, the simulation is verified with a custom calculator in Excel. After using the absorbers suitable for adjustment, the implementation with the final measurement of the reverberation time is carried out. Finally, an additional modification design is created using Helmholtz resonators. The implemented methods achieve an optimal and frequency balanced reverberation time and the room can be used as a mixing hall for multi-channel sound recording.
Apartment building Brno,Vídeňská - preparation and realization construction.
Hlušičková, Lenka ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This Master’s thesis deals with the technological project of the new building apartment house in Brno. This work includes technical reports, site equipment, wider transport relations,budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work, safety plan and risks on the building.
Experimental 600 W self-oscillating flyback switching power supply
Darida, Slavomír ; Vorel, Pavel (referee) ; Martiš, Jan (advisor)
Self-oscillating flyback converters are popular circuits due to their simplicity, robustness and low cost of components. They are generally used as low power devices. Mobile phone charger is good example of application. Realization of 600 W self-oscillating flyback converter is main goal of this thesis.
Apartment Building in Stromovka - Building Technology Project
Kralovič, Antonín ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the diploma thesis is to describe the building-technological project for the construction of a residential building in Hradec Králové. The apartment building is five-storey and has 33 residential units. The work is systematically divided into smaller logical units. First, the project is described in a technical report, followed by studies of the realization of the main building. After the description of the project, an indicative time and financial plan is prepared, which is refined by the schedule and budget itemization of the main building. An integral part of the design is mechanical engineering, staff balance and site construction equipment. To ensure the maximum quality of the work carried out, the technical regulations contain the control and test plans. In order to determine the supply possibilities of the construction it was necessary to carry out an assessment of the wider transport relations around the building.
Technological Procedure of Works for Reconstruction Odbočka Skály - Praha-Horní Počernice Track Section
Gilligová, Kristýna ; Staněk, Lukáš (referee) ; Svoboda, Richard (advisor)
The master thesis deals with design of technological procedures for the recontruction of the Odbočka Skály – Praha-Horní Počernice. The aim of the work is to propose alternative solutions of technological procedures. The work includes the development of schedules for two variants differing in the technology of removing the ballast base. Part of the thesis is a description of the construction technology and the mechanization used.

National Repository of Grey Literature : 156 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.