National Repository of Grey Literature 7 records found  Search took 0.00 seconds. 
Apartment building in Ivančice - construction technology project
Fejfar, Michal ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
Construction technology study phase of founding factory buildings on piles
Sviták, Marek ; Šťastný, Jiří (referee) ; Diaz, Yvetta (advisor)
The content of the thesis is design documentation foundation of faktory buildings on piles. The project includes a technical report focusing on the given stage, construction situation with wider relationships routes, itemized budget for a given stage, technological instruction for the implementation of bored piles technology CFA, principles of organization of the construction with building yard equipment, the timetable for the given technological stage, design mechanical assemblies, inspection and test plan for CFA bored piles technology, occupational safety and health with a list of risks and their elimination and itemized budget retaining walls.
Technological stage of realization mounting frame of factory building
Jekielek, Marek ; Ing.Lukáš Kopecký (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the construction phase of mounting prefabricated frame. Includes technological standard for mounting frame, the project construction site for the phase of mounting , the schedule of the phase of mounting frame, financial plan of the phase of mounting frame, controlling plan and test plan of the phase of mounting frame, the plan of risks at the phase of mounting frame, and mechanical assemblies plan.
The construction and technological stage of the establishment of an industrial hall in Libchavy
Berková, Daniela ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
This bachelor's thesis deals with the elaboration of a construction technology project for the foundation of industrial hall in Libchavy. The subject of the work is the execution of earthworks, the realization of piles and foundation footings. The content of the work is the elaboration of an accompanying and technical report, the situation of the construction site with wider relations of transport routes, the solution of the construction site equipment, the technological regulation for the execution of drilled piles, inspection and test plan related to the mentioned regulation, the solution of safety and risks on the construction site, the design of the mechanical assemblies, itemized budget, including a statement of acreage and a time schedule.
Apartment building in Ivančice - construction technology project
Fejfar, Michal ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
Construction technology study phase of founding factory buildings on piles
Sviták, Marek ; Šťastný, Jiří (referee) ; Diaz, Yvetta (advisor)
The content of the thesis is design documentation foundation of faktory buildings on piles. The project includes a technical report focusing on the given stage, construction situation with wider relationships routes, itemized budget for a given stage, technological instruction for the implementation of bored piles technology CFA, principles of organization of the construction with building yard equipment, the timetable for the given technological stage, design mechanical assemblies, inspection and test plan for CFA bored piles technology, occupational safety and health with a list of risks and their elimination and itemized budget retaining walls.
Technological stage of realization mounting frame of factory building
Jekielek, Marek ; Ing.Lukáš Kopecký (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the construction phase of mounting prefabricated frame. Includes technological standard for mounting frame, the project construction site for the phase of mounting , the schedule of the phase of mounting frame, financial plan of the phase of mounting frame, controlling plan and test plan of the phase of mounting frame, the plan of risks at the phase of mounting frame, and mechanical assemblies plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.