National Repository of Grey Literature 36 records found  beginprevious27 - 36  jump to record: Search took 0.01 seconds. 
Housing+
Doubrava, Šimon ; Jurkovič, Peter (referee) ; Galeová, Nicol (advisor)
A group of lots is located in a gap between a crossroad at Tomkovo square and the only natural solitaire nearby, Husovice hill. A newly-built highway bridge which is a part of outer Brno bypass unloads the street line of a big part of traffic load. Corner buildings, which stand between the bridge and the site serves as a noise barrier and together with the bridge, which moves the noise and vibrations to the upper levels change the site in a peaceful place. Calm character, the possibility to grab hold of the conection between Tomkovo square and Husovice hill and convenient commodity-monetary relations were three main reasons why the site was chosen for a proposal of dwelling complex.
Bridge on a highway
Knotek, Jan ; Nečas, Radim (referee) ; Panáček, Josef (advisor)
Subject of this bachelor’s thesis is design of new slab bridge construction over the II/464 road between the villages Příbor and Bílovec. The bridge converts highway D47. Thesis includes three studies. Pre-stressed rectangular cross-section slab with elliptical exterior trim, pre-stressed plate- grinder construction and construction of prefabricated beams and monolithic slab. For next assessment was chosen option no.1. Load effects calculation is solved in SCIA engineer 16.1. Design and assessment of the structure are made according to valid standards and regulations.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Highway bridge over wide wally
Mertová, Eliška ; Smejkal, Ing David (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis was the design of three possible variants, how to span the wide and deep valley with a bridge. After an evaluation, situation of the highway on the only wide load-bearing structure which is constituted by a box girder with transverse cantilevers supported by prefabricated bar braces, was chosen as an optimal solving. The load- bearing structure made of post- tensioned concrete is going to be incrementally launched and be supported by one-column pillars along an axis of the motorway. The work is composed of a detailed design of this preferred variant, which is processed according to the ultimate and serviceability limit state including the construction stage analysis of the bridge by the construction technology by an incremental launching method.
Highway bridge over the II/464 road
Mezera, David ; Koláček, Jan (referee) ; Panáček, Josef (advisor)
The content of the thesis is to solve the relocation of the II / 464 road. It is a bridge with one field of post-tensioned concrete. 3 studies were designed, one of which was elaborated within the framework of this thesis. Was selected option no. 3 double plate-grinder construction. The static model was created in Scia Engineer 2.15 and reports were processed manually, according to EC. The effects of wind, snow, acceleration and braking forces have been neglected.
Bridge on the D1 highway over a road and brook
Surovcová, Monika ; Zdražilová, Magda (referee) ; Panáček, Josef (advisor)
The aim of the diploma thesis is the proposal of a bridge structure in the direction of Přerov – Lipník in the cadastral territory of the Osek nad Bečvou. A bridge is used to overcome the road III/43612 in km 93,550, the stream Lubeň and a field trip. From tree alternatives is selected a post-tensioned two-beam concrete struction and assessed according to the limit states including an impact of phased construction according to the European standards. Also it is prepared a drawing documentation, an accompanying report and a visualization of the beam.
Bridge over a local brook
Růžička, Antonín ; Zdražilová, Magda (referee) ; Panáček, Josef (advisor)
Diploma thesis deals with design pre-stressed road bridge over the local brook and field road. There are designed 3 studies, from which variation trapezial point-supported pre-stressed concrete slabroad bridge with 3 spans is chosen. In the structural analysis of the bridge structure is assessed at the ultimate limit state and serviceability by European standards – Eurocodes. It is developed drawings and visualization of the bridge.
Flyover bridge across the II/434 road
Russnák, Adam ; Neudert, Zdeněk (referee) ; Panáček, Josef (advisor)
Subject of this master thesis is a flyover bridge over the road II/434 and flood-land. As a load-bearing construction is designed two-beam structure. Traffic loads on this structure are considered according to standard ČSN EN 1991-2. The structure design is based on resultant stressing according to standard ČSN EN 1992-2.
Highway bridge formed by cell box girder
Hošek, Filip ; Novotný, Petr (referee) ; Nečas, Radim (advisor)
Diploma thesis is focused on solving highway bridge over deep valley. From three studies has been chosen cell box girder with transverse overhangs.The static calculation contains limit states assessment, design of precast and time discetization analysis verification. Structure design contains temporary and pernament situations assessment according to EC. Last part of project is drawnings and visualization.
design of higway bridge accross Dolansky creek
Šedrla, Jakub ; Sliwka, Pavel (referee) ; Zich, Miloš (advisor)
My thesis is focused on a design and comparism of the highway bridge across Dolansky creek. The bridge is built by balanced cantilever method. The common span length is 110metres. The bridge is post-tensioned concrete structure.The static model is made of beams.The static analysis during lifespan of bridge is made by Time discretization analysis . The design of reinforcement is made for longitudinal section and cross section.

National Repository of Grey Literature : 36 records found   beginprevious27 - 36  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.