National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
The Reconstruction of the Late Laundry under the Veveří Castle for the Environmental Use
Vrtek, Tomáš ; Kunc, Ing Petr (referee) ; Vojtová, Lea (advisor) ; Kalousek, Lubor (advisor)
The goal of the bachelor thesis lied in designing a reconstrucion of the late Laundry under the Veveří castle, located at Rakovecká street, Brno-Bystrc. The intention of reconstrucion came from the current owners and had two parts. First part was coming up with new funcion – primarily educational and with focus on environmental topics. Second goal was to design the reconstrucion itself. Designed solution consists of two main functions – recreational habitation units and workshops specilized on teaching of traditional crafts. Because of really bad technical condition of the building and its new projected use, it was necessary to remove and re-desing new roof and ceilling constructions. New glass-facade extension was designed in the court and serves as main circulation area. New, embedded in the slope, building for the manager and variety of new paved areas were designed in close distance. The remediation of nearby pond was proposed as well.
The Reconstruction of the Late Laundry under the Veveří Castle for the Environmental Use
Vrtek, Tomáš ; Kunc, Ing Petr (referee) ; Vojtová, Lea (advisor) ; Kalousek, Lubor (advisor)
The goal of the bachelor thesis lied in designing a reconstrucion of the late Laundry under the Veveří castle, located at Rakovecká street, Brno-Bystrc. The intention of reconstrucion came from the current owners and had two parts. First part was coming up with new funcion – primarily educational and with focus on environmental topics. Second goal was to design the reconstrucion itself. Designed solution consists of two main functions – recreational habitation units and workshops specilized on teaching of traditional crafts. Because of really bad technical condition of the building and its new projected use, it was necessary to remove and re-desing new roof and ceilling constructions. New glass-facade extension was designed in the court and serves as main circulation area. New, embedded in the slope, building for the manager and variety of new paved areas were designed in close distance. The remediation of nearby pond was proposed as well.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.