National Repository of Grey Literature 23 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Technological stage of roofing the winter stadium in Vyškov
Novotná, Nicolette ; Jílek, Jan (referee) ; Diaz, Yvetta (advisor)
The bachelor's thesis deals with the technological process of roofing the ice surface at the winter stadium building in Vyškov. It is a system arch construction. The work contains a technical report focusing on the given stage, budget, technological regulation, construction site equipment, machine design, time schedule and other technical documentation according to the assignment.
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
Construction technology project of Yacht club in Hlučín
Labudek, Lukáš ; Čech, Václav (referee) ; Venkrbec, Václav (advisor)
The subject of this thesis is a construction technology project object Yacht Club Hlučín. The basis for the elaboration of this work is the diploma thesis from Ing.Radim Kučera - Yacht Club Hlučín. This thesis includes technical report construction technology project, coordinating the situation with the construction of wider relations of routes for transportation of main materials, time and financial plan of the construction according to the technical-economic indicators, drawing building equipment, scheduling, inspection and test plan, technological regulation for the implementation of the gross substructure, itemized budget and the plan for OSH implementation in Yacht club Hlučín.
Construction technological expansion project of sheltered workshop in Trinec
Gwóźdź, Dariusz ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The subject of graduation thesis is a building-technological study of production and warehousing hall and headquarters of Ergon protected workshops in Třinec. The work is prepared on the basis of the project documentation. This consists of 8 building objects( 2 main building objects and 6 engineering objects). Building object SO 01-assembly and warehousing hall will be used for installation of assembly lines for simple mounting of imported parts and for semi automatic painting line equipment. Building object SO 02- headquarters building will be used for social activities of employees (WC. showers, social room , cloak rooms) and office premises. The main aims of graduation thesis are : project of construction site equipment including of time and economical evaluation, time schedule and financial plan for objects, study of main phases of project realisation for objects SO 01 and SO 02, project of main building machines including their radius( reach), time schedule of building object SO 02, technological prescript for steel construction preparation of object SO 01 with control and check plan.
New construction of block of apartments A1, at Slavkov u Brna - Preparation of the realization construction
Stuchlík, Jaroslav ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This Thesis deals with the organization of realization of the residential building A1 Slavkov u Brna. Thesis solves mainly technological process of realization of the main object. The thesis aims to develop a time schedule of execution, usage of mechanisms timetable, material resources, technological regulations, inspection and test plans. The annex also solved graphically construction site facility set up and its modifications during execution depending on different type of works. This Thesis is based on realization project provided by the realization company and with consent of project designer.
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
Construction and Technological Preparation of the Transport Terminal in Pec pod Sněžkou
Černý, Jiří ; Jílek, Jan (referee) ; Mohapl, Martin (advisor)
The diploma thesis solves construction and technological preparation of the transport terminal in Pec pod Sněžkou. The content of the diploma thesis is a techical report on the construction technology project, the coordination situation, the time and financial schedule, the project of building site, selection of machines, time schedule for the main building object, plan for securing material resources for the main building of the transport terminal, technological prescription and inspection and test plan for monolithic ceiling structures. Another assignment part contains a plan for safety and health protection at work on the construction site and specialized topic is a noise study.
Construction technology project of production hall in Uherske Hradiste
Radmil, Aleš ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is the solution of selected components of construction-technology project construction of the II. stage production hall of the company Schlote Automotive Czech Ltd. This work includes financial, temporal, technical and technological aspects of the construction process. For selected component is created technologic direction and inspection plan.
Construction technology project for a hotel in Giant Mountains
Pozler, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
Construction preparation of a residential building Kluchova - Brno, Nový Lískovec
Jokl, Lukáš ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
The diploma thesis is dedicated to the project of preparing the realization of an apartment building on Kluchova Street in the Brno-Nový Lískovec district. The content of this work is the technological regulations for underground construction carried out using the so-called white bath and vegetation roof, for which an inspection and test plan, a time and financial plan-object plan, a time plan for rough construction and an itemized budget for rough construction are drawn up. It also includes the coordination situation with broader relationships of transport routes, the design of main machine assemblies, construction site equipment, principles of construction organization and safety and health protection at work with a focus on the main risks arising from construction. As part of the work, several appendices are developed, such as an assessment of the main lifting device, a proposal for LEED measures, an assessment of the necessary costs for the establishment and operation of the site equipment, a noise study of the site equipment and an assessment of the white tub/lost formwork structure.

National Repository of Grey Literature : 23 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.