|
Bridge over highway on a ramp
Tlamka, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The proposal is for new construction of a road bridge over the highway.Three options of solutions were proposed but only the option of connected girder slab beam of six fields was selected. This variant was assessed by static calculation. Static calculation is processed in accordance with European standards. Another important part of this thesis is also drawings, visualization, technical report and construction procedure.
|
|
Reconstruction of the pre-station area in Havířov
Fojtík, Ondřej ; Mikulová, Kateřina (referee) ; Nový, Martin (advisor)
Diploma thesis focuses on the reconstruction of the forecourt area in the city of Havířov. The theoretical part clarifies the concept of project management and its fundamental principles, addressing requirements for construction site equipment and the construction schedule. In the practical section, theoretical knowledge is applied, presenting the reconstruction project itself with a detailed description of its progression. An essential component is the proposal for construction site equipment, including cost estimation, along with the calculation of electricity and water consumption costs. The goal of the thesis is to compare real components of the project with alternative solutions, with an emphasis on potential savings in terms of finances and time.
|
| |
|
Bridge over highway on a ramp
Tlamka, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The proposal is for new construction of a road bridge over the highway.Three options of solutions were proposed but only the option of connected girder slab beam of six fields was selected. This variant was assessed by static calculation. Static calculation is processed in accordance with European standards. Another important part of this thesis is also drawings, visualization, technical report and construction procedure.
|
| |