National Repository of Grey Literature 27 records found  previous11 - 20next  jump to record: Search took 0.00 seconds. 
Bridge ower Račí brook
Novotný, Matěj ; Slánský, Bohuslav (referee) ; Panáček, Josef (advisor)
The Bachelor thesis deals with the road bridge on tfe road I/60 across the "Račí" brook. Construction is proposed in three variants. The selected design was prestressed board length18,2 meters, intended as a simple beam. Calculation of load is performed by software SCIA. The construction is evaluated according to current standards.
Bridge over a local road and a brook
Tichavská, Andrea ; Čihák, Petr (referee) ; Nečas, Radim (advisor)
The purpose of the master thesis is the design of the concrete highway bridge by European standards. The highway is situated on two independent prestressed load-bearing structures with cross-section area of constant dimensions over its length. The bridge deck is built on a falsework considering its proportions and obstacles under the bridge. The thesis contains the design and the assessment of the load-bearing structure in longitudinal and transverse direction including the calculation of cross beams and an anchorage zone.
Bridge over the Chvalšinský Brook
Večeřa, Jan ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
The project of the bridge construction aross the Chvalsinsky stream in the village Chvalsiny is the target of the bachelor’s thesis. The construction is designed in the three variations, all of which were chosen the variant prestressed slab structure with the length of bridging 13.5 m. The load calculation is performed by the computer program Scia Engineer and compared with manual calculations. The assessment of the structure is solved according to the standards EN 1992-1-1.
Arch bridge over a highway
Pěkník, Robin ; Zobek, Svatopluk (referee) ; Panáček, Josef (advisor)
The subject of this master's thesis is design of road bridge over highway D1 by the city Přerov. From the three proposed solutions has been chosen bridge with self-anchored arched structure which is good for deep notch. The concrete bridge was designed and assessed according to current Eurocodes. The thesis includes detailed structural analysis, drawings and visualization of the bridge. The analysis was performed using software Scia Engineer including time dependent analysis (TDA). Assessment of structure was made in Excel or by hand.
Bridge on I/38 road.
Novotný, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The final thesis is focused on design of valley bridging on I/38 road at the Havlickuv Brod bypass. The thesis contains study of the bridging area. For detailed assessment was chosen, from three variants, a two-beam cross-section girder of 4 spans. Load-bearing structure is designed as cast-in-place, post-tensioned, concreted at fixed falsework without phased construction. The serviceability limit state and the ultimate limit state were assessed. The thesis contains, apart from structural design, drawings and visualizations of the bridge.
Design of the bridge in the industry area
Lipus, Rostislav ; Svoboda, Adam (referee) ; Klusáček, Ladislav (advisor)
The aim of this bachelor‘s thesis is the design and analysis of the concrete bridge in industrial area across river Balinka. Thesis contains static analysis of single span bridge which was chosen from three variants. Final variant is sloping prestressed concrete deck supported by two supports. Calculations were made by Scia Engineering software and compared with manual calculation. The supporting structure is assessed for the ultimate limit state and serviceability limit state The design is created in accordance with ČSN EN 1992-2. This thesis does not contain the time dependent analysis.
Road bridge over the highway by the town Moravský Písek
Novotný, Matěj ; Rušar, Jaromír (referee) ; Klusáček, Ladislav (advisor)
The Diploma thesis deals with the road bridge on tfe road 4951 across the D55 highway. Construction is proposed in three variants. The selected design was prestressed board length 67,65 meters, intended as a continuous beam. Calculation is performed by software SCIA. The construction is evaluated according to current standards.
Arch bridge across the highway
Olšák, Martin ; Trenz, Jan (referee) ; Nečas, Radim (advisor)
The subject of this diploma thesis is design of arch bridge across the highway. Has been elected self-anchored structure with span of arch 60 m and trapezoid bridge deck from prestressed concrete. The load effects is calculated by software Scia Engineer including time dependent analysis. The supporting structure is assessed for the ultimate limit state and serviceability limit state. Static assessment is done by hand calculation according to CSN EN 1992-2. Part of the thesis is drawing and visualization of the bridge.
Prestressed bridge No. 207 over the expressway R2 in Slovakia
Ježek, Rostislav ; Štefan, Petr (referee) ; Koláček, Jan (advisor)
In the diploma thesis “ Prestressed bridge No. 207 over the expressway R2 in Slovakia” three variants of solution of bridging are developed. The aim of diploma thesis is evaluation of the proposed options and implementation of detailed design of the supporting structure selected variant. The thesis includes consideration of state of construction. Option chamber bridge with inclined walls on three fields were chosen for detailed static analysis. This post-tensioned structure is assessed in accordance with applicable European standards. The analysis of the construction is performed by Scia Engineer 2013 software system. In addition, the ceiling structure is assessed for pushing through. Drawing and visualization is a part of diploma thesis.
Arch bridge over a highway
Pěkník, Robin ; Zobek, Svatopluk (referee) ; Panáček, Josef (advisor)
The subject of this master's thesis is design of road bridge over highway D1 by the city Přerov. From the three proposed solutions has been chosen bridge with self-anchored arched structure which is good for deep notch. The concrete bridge was designed and assessed according to current Eurocodes. The thesis includes detailed structural analysis, drawings and visualization of the bridge. The analysis was performed using software Scia Engineer including time dependent analysis (TDA). Assessment of structure was made in Excel or by hand.

National Repository of Grey Literature : 27 records found   previous11 - 20next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.