Extension of Stores and Cloakrooms in Frýdek-Místek, Gross Superstructure
Hlinšťák, Filip ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of an extension of stores and cloakrooms. The main supporting element is a prefabricated reinforced concrete frame. Roof structure is made from trapezoidal sheet and prestressed concrete slab.
Construction technology study of the production hall in Znojmo
Smatana, Roman ; Nevosád,, Zdeněk (referee) ; Lízal, Petr (advisor)
This master thesis deals is processed constructive technological project of realization factory and storage building in Znojmo. Master is thesis includdes model of the building site accessories, technology procedure, time schedule, financial heftiness ,check and test plan, budget ,occupational safety.
Self service shoping centre - construction technological project
Prusková, Nikola ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the construction technological project of a self-service shopping centre in Stará Plesná village. Time and finance plan, design of machinery and project of building site accessories were elaborated. The work is focused on the main building object SO 101 (Shopping and service centre). For this building pile foundations and top coarse building phase were worked out in greater details. Time plan, item budget and other documents concerning building preparations of object SO 101 are also parts of the work.
The company premises SIWE, assembly gross superstructure production hall
Drexler, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of a factory building. The main supporting element is a prefabricated reinforced concrete frame, with a peripheral shell of bricks POROTHERM insulated using contact system ETICS. The roof structure is not part of this thesis. This document includes: inventory of quantities, budget, schedule, technical regulations, organizational principles of construction and a comparison of the methods and implementations of two insulation technologies.
Residential building Šemberova, Brno - The solution phase realization of the envelope
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This Bachelor's thesis deals with the execution of the envelope residential building Šemberova. It concerns realization of the ventilated façade. In this Bachelor's thesis, the building technological project contains primarily a model of the building site accessories, the technological process, the time schedule, the financial heftiness, the machines formation, the check and the test plan, the occupational safety, for these technological phases.
Preparation of realisation gross superstructure of an apartment block named Francouzská in Brno
Křenková, Kristýna ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with construction technology procedure gross superstructure of an apartment block named Francouzská in Brno. An apartment block has 7 floors. First floor is located partially below ground, becouse lobby area is located in very steep terrain towards the Francouská street. Wing unit is made up of mainly enclosure wall, interior transverse and longitudinal walls of the ceramic blocks Porotherm. Transverse and longitudinal supporting interior walls are produced of sheathing bricks Supertherm, which are located in 1.NP, 2.NP and partially in 3.NP, these blocks are sealed with concrete. Ceilings are designed as continuous strengthened concrete-steel monolithic desks. The staircase is designed as a monolithic reinforced concrete. This construction and technological study of gross superstructure includes technical report, technologic process of concrete-steel monolithic ceiling, plan routes, inspection and test plan, schedule, financial requirements, solution the organization of building up, assembly and machine safety.
Selected parts of the construction technology project of the apartment building in Trnava
Výberči, Michal ; ing.Zdeněk Nevosád,CSc. (referee) ; Lízal, Petr (advisor)
This master thesis deals is processed constructive technological project new construction of residential house in Trnave.Master is thesis includdes model of the building site accessories, technology procedure, time schedule, financial heftiness ,check and test plan, budget ,occupational safety.
Construction-technological stage of the stock hall in Jiříkovice
Čačaný, Lukáš ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
This bachelor thesis deals with the processing of the technological stage which is the upper carcass of the storage-administrative area. In this work we deal with technical management, situation of construction, equipment of construction site, item budget, time schedule, technological progress of construction, design of machine system, control test plan and work safety of technological stage.
Sales and service center Prague - the building technological project
Trhlík, Lukáš ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
In this diploma thesis deals with execution of ground works, foundation constructions, steel and armored concrete monolithic framework of the sales and service center in Prague. Establishment of the building will be done on armored concrete basement feet, strips and basement plate. The building is desinged in part as a steel framework and in part as a armored concrete framework. The building technological project contains for the phases primarily time and financial plan of object, technology prescription, time schedule, budget, model of the building site accessories, model of the machines, check and test plan, safety plan.
Construction technology project of storage hall
Petrík, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.