Construction Technological Project of "Campus Brno - Bohunice"
Marek, Miroslav ; Venkrbec, Václav (referee) ; Štěrba, Martin (advisor)
The subject of the Diploma thesis is the technological project of the university campus in Brno - Bohunice. The work includes a complex study of the realizacion of the main technological steps in the construction of buildings UKB, namely the A25 and A36. There is the technical report, technology processes steel bearing system and monolithic reinforced concrete structures. Inspection and test plan for addressing regulations, timetable of works, machine draft report, and occupational health and safety plan
|
|
Architectural and technological modernization project object T8, BUT
Skokanová, Šárka ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is the architectural and technological modernization project object T8 the Technical University in Brno. Reconstruction of the partial operation affects investor during reconstruction and access to various floors of the building which is secured by a connecting bridge passing over five floors of the building and articulated halls adjacent buildings. The aim is to design technology solutions, spatio-temporal, financial and legislative aspects, taken on the basis of project documentation.
|
| |
|
Construction technology project of Company Snowboard Zezula
Němec, Martin ; Pražáková, Jana (referee) ; Diaz, Yvetta (advisor)
In this master´s thesis I am focusing on the Construction technology project of Snowboard Zezula Company. Major part of my thesis informs on a technical report for a construction technology project, a time and a financial plan of a construction, a realization study of the main technological stage, a plan of the main construction mechanism, a project of a construction site device with drawings, a financial calculation of the construction site devices and some technological rules, checking and testing plan for designed operations. Lastly I compare the two different designs of a load-bearing construction level and I calculate time of sheat removing with the economical calculation of the work fissure number.
|
| |
|
Construction technological project of administration building Gaceta in Prague
Jekielek, Marek ; Pražáková, Jana (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the structural construction of administrative building. It includes technological standards for reinforced concrete ceiling and for face layer of ventilated facade, the project of site construction, detailed structural, financial and time schedules of building object, controlling plans and test plans of the reinforced concrete skeleton and for face layer of ventilated facade from face brick, plan of main mechanical assemblies and costing of budget for structural.
|
|
Construction technology project of storage hall
Petrík, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.
|
|
Royal Crystal trade centre - construction technology project
Novák, Jiří ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
This master's thesis deals with the construction technology project solution of the Trade centre building. This thesis consists of a comprehensive elaborate project of implementation including the schedule and calculation, two technological regulations of operations, main mechanisms and risks connected with the realization itself. Logistics of resources, construction side and procedures needed for realization are processed as well.
|
| |