National Repository of Grey Literature 63 records found  beginprevious44 - 53next  jump to record: Search took 0.01 seconds. 
Technological phase of the upper structure of the hotel building in Horní Bečva
Michalisko, Matej ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The content of this bachelor thesis is the construction of the Mountain Hotel. The bachelor thesis solves the realization of the rough top structure with focus on the masonry supporting constructions and realization of the ceiling construction using the SPIROLL panels. It includes a technical report focusing on the technological stages, the situation of the construction with the transport routes, the area statement, the technological regulation for the masonry structures, the technical regulation for the realization of the ceilings using the SPIROLL panels, the technical management of the building equipment, the budget item, the time schedule, the design of the machine assembly, and a test plan and, finally, health safety at work.
Preparation and management of the contract in the construction company
Jedlička, Jan ; Vala, Jiří (referee) ; Nový, Martin (advisor)
This diploma thesis aims to describe preparation and management of a contract in a building company using the tools of project control. The thesis contains a theoretical and a practical part, where the problem is first explained theoretically and then practically on the chosen contract. This contact is a block of flats in Stepanov, which was realized in the years 2017 and 2018 by the building company Moravostav Brno, a. s.
Implementation of the rough superstructure of the administrative building in Senica
Kuchta, Peter ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The objective of this bachelor thesis is the design and description of the technological stage of the construction of an administration building located in the town of Senica. The superstructure is realized using the "Porotherm" system. In the thesis there is elaborated design and building documentation for the selected stage of the construction, configuration layout of the building site including wider relations to the traffic and access roads. The thesis contains technological prescriptions for the vertical masonry and ceiling structures. Furthermore there is solved organisation of the works in the selected stage and building site equipment including requirements for infrastructure networks. The time schedule, itemized budget a proposal for the machinery for the completion of the gross structure is presented. The occupational safety and health are taken into account; there are specified quality requirements, quality control and testing plan.
Constructive technological project of warehouse
Říha, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The aim of the diploma thesis is to elaborate parts of the frozen food warehouse construction project in Dašice in the area of MD logistics as, resulting in the elaboration of a technical report on the building technology project, the coordination situation of the building with the broader relations of the transport routes, the time and financial plan of the construction in the plane of the buildings, implementation of the main technological stages of the main building, drawing of the building site equipment, design of the main building machines, detailed time schedule of the main building, budget line, technological regulation for implementation of foundation structures consisting of drilled pilot and supporting walls, quality control and test plan for the given stage , drawings of the earthworks equipment and the construction of the hall.
Constructive technological project of a business incubator
Sviták, Marek ; Jakubíček, Jiří (referee) ; Diaz, Yvetta (advisor)
The content of the diploma thesis is the processing of a constructive technological project of a business incubator. The objective of this constructive technological project is to approach the construction process in the framework of the study of the implementation of the main technological stages, which closely follows the project of the site construction equipment with suitable layout of its construction, as well as the design of suitable machinery mechanisms for realization of the main building. Part of the project is also to determine the timeliness of work, financial and material management, and technological regulations for implement selected activities, taking into account the quality control and planning of their implementation. The whole construction process is completed in the final part of the diploma thesis on the solution of the occupational health and safety issues.
Constructive technological project of reinforced concrete monolithic hall
Hubáček, Lukáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
This diploma thesis deals with the construction and technological project of the reinforced concrete monolithic hall for Dinel s.r.o., which has its seat in the industrial zone Zlín - Příluky. There are prepared a technical report for the construction project, time and financial plan of the construction of the second stage, a study of the implementation of the main technological stages, a project of the building facility, a design of the main building machines and mechanisms, a schedule of the main building including a plan of the material resources and technological regulations of selected stages together with control and test plans. In addition there is prepared a budget item of the main building, the health and safety plan and a problematics of the antistatic floors.
Construction technology study stage of roof
Rouzek, Jiří ; Selník, Petr (referee) ; Diaz, Yvetta (advisor)
The aim of this work is the construction of a technological project for the construction of roof structures of a new apartment building on the street Sochorova in Brno. The thesis deals with technological regulations for the implementation of flat and vegetation roofs. Technological regulations are complemented by design of machine assemblies, control and test plans, technical report of site facilities, work safety protocol, budgets, time schedules and a protocol on the principles of construction organization.
Implementation of the roofing phase of a residential building in Nové Sady
Balko, Dávid ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The bachelor thesis deals with realization of a roofing construction of a apartment block in Nové Sady. This thesis deals with the version of a warm flat roof. For the given version is handled the consideration of transportation itinerary, itemized budget with bill of quantities, technological prescription, technological documentation of building site equipment, time schedule, machine assembly, control and test plan, safety and health precautions, the cost comparison of flat roof area, drawing of flat roof.
A mountain hotel - technological phase of the upper structure
Franc, Filip ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of this bachelor's thesis is a consturction of a Mountain hotel, in detail structural work of upper construction with brick support structure and ceiling panels SPIROLL being the main focus of this thesis. The thesis also includes a technical report, site lay-out with broader relations to traffic routes, acreage list, technological directive for brick support structure, technological directive for ceiling panels SPIROLL. Technical report of building site equipment, time schedule, draft of a machine setup. Inspection-check plan, safety and protection of health during work are also included.
Selected Parts of Building and Technological Project of Administrative and Manufacturing Hall Hydraulics s.r.o.
Kousal, Tomáš ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The master thesis deals with a conception and realization of a constructional and technological project of new manufacturing and administrative hall Hydraulics s.r.o. The thesis studies the realization of the major technological constructing stages of the building. It also covers projects of the construction site, the time schedule, the plan of the main building machines and mechanisms and the budget. Furthermore, the master thesis solves technological regulations for foundations made with bored piles, the budget according to THU including the check plan, the test plan and the safety plan. Also, the assessment of the construction composition is attached.

National Repository of Grey Literature : 63 records found   beginprevious44 - 53next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.