National Repository of Grey Literature 23 records found  previous11 - 20next  jump to record: Search took 0.02 seconds. 
Fire station, Svitavy
Navrátil, Michal ; Nováková, Eva (referee) ; Kolář, Radim (advisor)
The diploma thesis elaborates the project documentation for the construction of a new apartment of central fire station type C1 with the administrative part of the Territorial Department. The fire station is technologically linked to the second building SO.02 the technical and technological background of the fire station. The building is situated on the eastern edge of Svitavy. The building is non-cellular, it has three floors and a flat green roof. Three floors fulfilling matter with mainly administrative function is connected with two floors blocks fire station with an indoor gym. Above the floor containing garages for emergency vehicles facilities for the emergency unit are placed with a curtain that creates fading of the emergency door. The matter of the gym is optically separated from the station and highlighted with a volume narrow neck and height elevation. In the station there are training places and places for general physical preparation. The buildings are located in a sloping terrain. The ground fire station has a heliport. The establishment supporting columns of the building are for made of prefabricated calyx, and are concreted into monolithic foundation pads. Infill wall vertical bearing and non-bearing structures are designed from clay blocks type THERM. The bearing system is reinforced concrete prefabricated frame. Horizontally bearing structures are designed from prestressed hollow core slabs. The building envelope is made of a curtain wall in dark grey and red combined with a light contact thermal insulation system used on the indoor gym. The envelopes are in the administrative part and the part of the station divided by a glazed area. In the workshops and technology room the envelope is divided by lamellae. Usually there are 13 firemen during one shift, in three shifts there work 39 firemen all together. There are supposed to be 17 employees in the administrative department.
Construction technology project of storage hall
Petrík, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.
Spatial reinforced concrete frame of an industrial building
Matěják, Jan ; Laníková, Ivana (referee) ; Šimůnek, Petr (advisor)
This bachelor thesis deals with design of selected precast elements of a prefabricated hall. Single-nave storage hall is formed by transverse frames. The elements include main roof girder designed in two variants. The first variant is considered to be made of reinforced concrete. The second variant is designed from prestressed concrete. Other designed elements are a pair of columns carrying the girder and pocket foundations. The elements were designed according to the ČSN EN 1991-1-1. The output from this bachelor thesis are structural design reviews and drawings of selected parts (formwork and reinforcement).
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Resort Orlík
Pavelka, Šimon Václav ; Utíkal, Aleš (referee) ; Utíkalová, Ivana (advisor)
The subject of the diploma thesis is the elaboration of project documentation for construction of the Orlík Resort. The buildings are detached and are set in a slightly sloping terrain in the cadastral area Kožlí u Orlíka. The main building has two above-ground floors and one underground floor. In the basement, there is a utility room for the whole building and warehouse. Furthermore, the hall is divided into a section for men and a section for women. In these sections, visitors have a dressing room with cabins with showers and toilets. Then there will be a choice of two exercise halls, two massage rooms or a large gym area. On the ground floor, the building is entered via lee to the vestibule and into the spacious hall. In the entrance, there is a reception with storage area and a room with a kitchenette and toilet. The building is also accessible via a second staircase and large glass sliding windows. There is a conference room with adjustable size, a social hall, warehouses, toilets for women and men as well as an office. For employees there is a day room with kitchenette, changing rooms and showers separate for men and women. The upper floor contains two terraces. These are green roofs, where one is partially fitted with tiles, and there is a recognized reinforced concrete skeleton. There is a cleaning room on each floor. There are also processed two apartment houses, illuminated by roof skylights, which are on the plot four times. All buildings are designed from the reinforced concrete skeleton with lined sandstone blocks. The ceilings are made of prestressed hollow panels, and the roofs are green. Apartment house No. 1 is symmetrical and contains two apartments. There is a storage room, lee, vestibule, utility room, toilet, room, bedroom and a large kitchen with living room and terrace access. The large bathroom has a bathtub, glass shower and one sliding door that closes the room with urinal or toilet. Apartment house No. 2 is divided into three apartment
Fire station, Svitavy
Navrátil, Michal ; Nováková, Eva (referee) ; Kolář, Radim (advisor)
The diploma thesis elaborates the project documentation for the construction of a new apartment of central fire station type C1 with the administrative part of the Territorial Department. The fire station is technologically linked to the second building SO.02 the technical and technological background of the fire station. The building is situated on the eastern edge of Svitavy. The building is non-cellular, it has three floors and a flat green roof. Three floors fulfilling matter with mainly administrative function is connected with two floors blocks fire station with an indoor gym. Above the floor containing garages for emergency vehicles facilities for the emergency unit are placed with a curtain that creates fading of the emergency door. The matter of the gym is optically separated from the station and highlighted with a volume narrow neck and height elevation. In the station there are training places and places for general physical preparation. The buildings are located in a sloping terrain. The ground fire station has a heliport. The establishment supporting columns of the building are for made of prefabricated calyx, and are concreted into monolithic foundation pads. Infill wall vertical bearing and non-bearing structures are designed from clay blocks type THERM. The bearing system is reinforced concrete prefabricated frame. Horizontally bearing structures are designed from prestressed hollow core slabs. The building envelope is made of a curtain wall in dark grey and red combined with a light contact thermal insulation system used on the indoor gym. The envelopes are in the administrative part and the part of the station divided by a glazed area. In the workshops and technology room the envelope is divided by lamellae. Usually there are 13 firemen during one shift, in three shifts there work 39 firemen all together. There are supposed to be 17 employees in the administrative department.
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Implementation of Production Hall in Hulín
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
LD Seating production hall - construction technology project
Jůzl, Martin ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
PFM Flexi storage hall - construction technology project
Chroustovský, David ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.

National Repository of Grey Literature : 23 records found   previous11 - 20next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.