National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
City within the City / "Trnitá City Block"
Skrušný, Petr ; Plášil, Jiří (referee) ; Nový, Vítězslav (advisor)
Wider relationships The plot is located south of the historic center of Brno in the city of Brno- Thorny. It is called the "New South Center" along with the land in the northern part behind Opuštěná Street and the eastern lands on which the Central Bus Station is located today The bell ringer. Significant buildings near the solved area is the area of the shopping gallery Vaňkovka s FAIT Gallery and Trinity Palace, then the Šlapanice Municipal Office and the aforementioned bus station. The land has not been built up for a long time due to the existence of floodplains, so it is not contaminated in any way. It is also related to the very long discussion about the relocation of the main train station, the location of which already was decided in 2018. The station should therefore be built by the river. Related to this is the development of the South centers, construction of mixed urban development with functions of housing, services, trade, office and rentable space. This action should expand the center by a busy "boulevard" connecting the visual axis of the railway station with the historical center of Brno. It would then be at the end of the boulevard main train station and integrated main bus station. The existence of the river is very important and the park, which enter this area and give it the unmistakable character of a city-wide importance. Definition and purpose of construction The aim of the work is to the given block urban structure (territorial study of the so - called South Quarter - Trnitá KAM Brno 2019) to design a multifunctional house. Students then choose the location of the object in the area or objects, establish and justify the construction program and process the work to the extent specified below. Proposal will be developed freely according to the regulations set out in the above-mentioned territorial study. Designed by me the building combines the functions of housing with spaces for services in the street parterre of the building. Urban concept The uniqueness of the whole area is direct contact with the historic center, the new main train station and the very close presence of the Svratka River, which is of direct contact in this area borders of my parcel. These facts bring important ideas to this situation and that urban traffic and recreation by the river. It is evident that the river does not have the potential in this area and only so it will have no analogues in Brno, precisely because of the expected high concentration of people traveling on the train, so thanks to the new inhabitants, which should be up to 10,000. The new waterfront would be used by both residents district, as well as people from the area, or visitors commuting by train. That's why I design the whole street parterre buildings as public. I am creating small spaces for a café with a possible use of the anteroom in front of the building itself to sit. The upper floors then serve purely as living areas. The embankment of the Svratka River separates the greenery and the adjoining cycle path to the already very popular track along whole river. Transport solutions The building is transported for cars from the west side of the river to the service two-way calmed communication. At the ends of the building is the entrance to the elevator for passengers cars leading to underground parking garages. Supply of commercial space on.
New scene of the Beseda House in Vyškov - neoplasm in a historical setting
Skrušný, Petr ; Plášil, Jiří (referee) ; Boháč, Ivo (advisor)
The plot is located in the very center of the town of Vyskov, in the perfect connection of the main pedestrian hub on Masaryk Square. This is an extension of the loose gap following the shield facade of the existing house of the house. The orientation of the parcel is northeast. The plot is located on the pedestrian passage through the main square, where I create a park with a paved area. The new building is adjacent to the parish church of the Assumption of the Virgin Mary, a baroque chateau and an object of the shopping center. The proposed object stops the vacant loop with the slate wall of the existing beseda house, creating the corner between Kostelní street and the pedestrian corridor from Masaryk square. The building itself has 5 above-ground floors, with terraced ramps to the raised corners of the building with the possibility of using roofs. The building is a structural reinforced concrete skeleton with monolithic beams and stiffening cores. The façade is a double-ventilated solution with internal glazing and an outer sheath made of stone, semi-transparent blocks mounted on metal frames. The construction is based on a base plate with feet under the support pillars. To prevent the foundations of the existing house of the house from being interrupted, the pillars of the pillars are separated by two meters from the house and the individual boards are monolithically insulated. The construction height of the floor is 4.5 m. 4 m clearance height 0.5 m floor composition for keeping the floors connected and connecting the old building with the new building. In the connecting part of the existing building there is a reconstruction and modernization. The connection of both objects is by means of a rubber expansion joint. The technical background of the building is located at the site of the building. The heating of buildings is solved by means of an air heat pump located on the roof with both air heating and cooling function. As an additional heating system there is an electric underfloor heating, which is a suitable solution due to the location of the photovoltaic power plant on the roof. The air exchange is solved by means of recuperation. The outlets are led by a shaft into individual floors, where they are led by the technical part of the building and then projecting in the soffit. Water heating is solved by solar panels located on the roof of the building with the possibility of water heating by electric energy. The produced energy is stored in the tanks and then distributed to the building. Rainwater is drawn into the sewer and is not used in any way. Escape routes are the main staircase with a fire safety lift, a staircase with a lift for the halls and the existing vertical communications of an existing house. Public lighting is designed with the illuminated joint of the front facade of the building, which creates a pleasant light effect. Parking space is provided in the vicinity of the building on Masaryk Square, next to the parks and the nearby parking spaces.
City within the City / "Trnitá City Block"
Skrušný, Petr ; Plášil, Jiří (referee) ; Nový, Vítězslav (advisor)
Wider relationships The plot is located south of the historic center of Brno in the city of Brno- Thorny. It is called the "New South Center" along with the land in the northern part behind Opuštěná Street and the eastern lands on which the Central Bus Station is located today The bell ringer. Significant buildings near the solved area is the area of the shopping gallery Vaňkovka s FAIT Gallery and Trinity Palace, then the Šlapanice Municipal Office and the aforementioned bus station. The land has not been built up for a long time due to the existence of floodplains, so it is not contaminated in any way. It is also related to the very long discussion about the relocation of the main train station, the location of which already was decided in 2018. The station should therefore be built by the river. Related to this is the development of the South centers, construction of mixed urban development with functions of housing, services, trade, office and rentable space. This action should expand the center by a busy "boulevard" connecting the visual axis of the railway station with the historical center of Brno. It would then be at the end of the boulevard main train station and integrated main bus station. The existence of the river is very important and the park, which enter this area and give it the unmistakable character of a city-wide importance. Definition and purpose of construction The aim of the work is to the given block urban structure (territorial study of the so - called South Quarter - Trnitá KAM Brno 2019) to design a multifunctional house. Students then choose the location of the object in the area or objects, establish and justify the construction program and process the work to the extent specified below. Proposal will be developed freely according to the regulations set out in the above-mentioned territorial study. Designed by me the building combines the functions of housing with spaces for services in the street parterre of the building. Urban concept The uniqueness of the whole area is direct contact with the historic center, the new main train station and the very close presence of the Svratka River, which is of direct contact in this area borders of my parcel. These facts bring important ideas to this situation and that urban traffic and recreation by the river. It is evident that the river does not have the potential in this area and only so it will have no analogues in Brno, precisely because of the expected high concentration of people traveling on the train, so thanks to the new inhabitants, which should be up to 10,000. The new waterfront would be used by both residents district, as well as people from the area, or visitors commuting by train. That's why I design the whole street parterre buildings as public. I am creating small spaces for a café with a possible use of the anteroom in front of the building itself to sit. The upper floors then serve purely as living areas. The embankment of the Svratka River separates the greenery and the adjoining cycle path to the already very popular track along whole river. Transport solutions The building is transported for cars from the west side of the river to the service two-way calmed communication. At the ends of the building is the entrance to the elevator for passengers cars leading to underground parking garages. Supply of commercial space on.
New scene of the Beseda House in Vyškov - neoplasm in a historical setting
Skrušný, Petr ; Plášil, Jiří (referee) ; Boháč, Ivo (advisor)
The plot is located in the very center of the town of Vyskov, in the perfect connection of the main pedestrian hub on Masaryk Square. This is an extension of the loose gap following the shield facade of the existing house of the house. The orientation of the parcel is northeast. The plot is located on the pedestrian passage through the main square, where I create a park with a paved area. The new building is adjacent to the parish church of the Assumption of the Virgin Mary, a baroque chateau and an object of the shopping center. The proposed object stops the vacant loop with the slate wall of the existing beseda house, creating the corner between Kostelní street and the pedestrian corridor from Masaryk square. The building itself has 5 above-ground floors, with terraced ramps to the raised corners of the building with the possibility of using roofs. The building is a structural reinforced concrete skeleton with monolithic beams and stiffening cores. The façade is a double-ventilated solution with internal glazing and an outer sheath made of stone, semi-transparent blocks mounted on metal frames. The construction is based on a base plate with feet under the support pillars. To prevent the foundations of the existing house of the house from being interrupted, the pillars of the pillars are separated by two meters from the house and the individual boards are monolithically insulated. The construction height of the floor is 4.5 m. 4 m clearance height 0.5 m floor composition for keeping the floors connected and connecting the old building with the new building. In the connecting part of the existing building there is a reconstruction and modernization. The connection of both objects is by means of a rubber expansion joint. The technical background of the building is located at the site of the building. The heating of buildings is solved by means of an air heat pump located on the roof with both air heating and cooling function. As an additional heating system there is an electric underfloor heating, which is a suitable solution due to the location of the photovoltaic power plant on the roof. The air exchange is solved by means of recuperation. The outlets are led by a shaft into individual floors, where they are led by the technical part of the building and then projecting in the soffit. Water heating is solved by solar panels located on the roof of the building with the possibility of water heating by electric energy. The produced energy is stored in the tanks and then distributed to the building. Rainwater is drawn into the sewer and is not used in any way. Escape routes are the main staircase with a fire safety lift, a staircase with a lift for the halls and the existing vertical communications of an existing house. Public lighting is designed with the illuminated joint of the front facade of the building, which creates a pleasant light effect. Parking space is provided in the vicinity of the building on Masaryk Square, next to the parks and the nearby parking spaces.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.