National Repository of Grey Literature 197 records found  beginprevious101 - 110nextend  jump to record: Search took 0.00 seconds. 
Construction technological preparation of the implementation of the selected construction
Špunarová, Ivana ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The thesis is focused on the construction-technological preparation of building construction. Accurately, the apartment building "Rezidence u parku" in Prostějov (SO 01). The apartment building has 1 underground floor and 5 above floors. The content of this work is mainly a technical report, coordination of constructions with connections of transport routes, study of the realization of the main technological stages of the construction object, construction site equipment project, proposal of the main construction machines, technological regulation for reinforced concrete monolithic ceiling above 1. underground floor, control and test plan quality for a reinforced concrete monolithic ceiling, safety and health plan for the construction of monolithic constructions, itemized budget for rough construction, calculation according to THÚ, time and financial plan of construction - object, time plan of the main construction object, histogram of workers, Drawing of ceiling formwork above 1. underground floor, plan to ensure the main material resources for rough construction.
Preparation of implementation and management of the selected construction
Kofler, Nikodém ; Průcha, Aleš (referee) ; Šlanhof, Jiří (advisor)
Diploma thesis delas with constructive – technological preparation of bridge, class S 21.5/100, with lenght 250,2 m. Bridge is located in non-bult-up area in cadastral territory of village Postřelmov and spans over railway and Morava river. Bridge structure is designed as double beam with reinforced concrete slab on top. Bridge is build by technology slide-in.
Preparation and Organization of Selected Construction
Poledníková, Hana ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The subject of the thesis is the development of a construction technology project for the new construction of the Dukelská administrative building in the city of Brno. It is a four storey, non-basement building covered with a single-skinned surface. The content of this work is a technical report, the coordination situation of the building with wider relations of transport routes, a time and financial plan - object plan, a study of the building construction object and its main technological stages, project equipment of the workplace for three stages of construction together with the calculation of costs for construction site equipment, the proposal of the main construction machines, time schedule, plan to ensure material resources for rough construction, technological prescription for monolithic ceiling constructions together with ceiling formwork drawing, quality control and testing plan and health and safety plan. The work also includes construction calculations according to THU, the budget of the closed construction SO 01 and the economic evaluation of the use of the crane.
District Police Department of the Czech Republic in Brno-Bohunice, Preparation for Construction
Dubecký, Tomáš ; Brandtner, Michal (referee) ; Šlanhof, Jiří (advisor)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.
Implementation of Roof of Apartment Building in Olomouc
Antal, Martin ; Šlanhof, Jiří (referee) ; Nečasová, Barbora (advisor)
The subject of this bachelor's thesis is the solution of the technological stage of the roofing of an apartment building in Olomouc. This work includes accompanying and summary technical report, solution of wider transport relations, time plans, item budgets, technical management of construction site equipment, health and safety, control and test plans, technological regulations and staff balances. The aim of this bachelor thesis is to compare selected variants of roofing in terms of subjective, financial and time.
Apartment Complex Kadetka, Preparation for Building Realisation
Páleník, Tomáš ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for Apartment complex Kadetka - preparation for building realisation. Specifically, this is an underground garage and object C. In the course of the creation of project, the objects A and B, incorporated in the project of the construction site equipment, were also taken into account. The content of the work is a technical report to the construction technology project, evaluation of transport routes, time and financial plan, individual realization phases of the main building phase, design of the main building machine and mechanisms, time schedule for rough construction, plan for securing material resources, elaboration of technology regulations for underground monolithic reinforced concrete structures and check and test plan. The thesis also includes an item budget for the apartment house made with Build Power S software.
Preparation for Building Realisation
Sikora, Marek ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of this diploma thesis is the elaboration of the construction and technology project of the kindergarden in Čelákovice. Diploma thesis contain technical report of construction and technology projet, design mechanical assembley with transportation route, design of construction site equipment, time schedule and the budget of the main building, technological prescription of the flat roof and control and test plan.
Building Technology Project
Kolouch, David ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this diploma thesis is the processing of selected parts of the construction technology project for the New office and manufacturing building of GRADIOR TECH a.s. The building is located in the Královopolská industrial park in Brno - Královo pole. The construction is divided into 6 buildings. The indicative time and financial plan focuses on the building as a whole. Furthermore, the diploma thesis focuses in detail on the construction technology project project in detail on the building of the office building, which is based on drilled piles. On these piles, the cup feet for pillar fitting are placed on which the beams are fitted together with frames and ceiling panels. The building is diverse and contains both prefabricated and monolithic structures.
Preparation for Building Realisation and Building Management
Hlinšťák, Filip ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.

National Repository of Grey Literature : 197 records found   beginprevious101 - 110nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.