Národní úložiště šedé literatury Nalezeno 6 záznamů.  Hledání trvalo 0.01 vteřin. 
Utilization of cone penetration tests in the load-transfer method for bored large diameter piles
Štetiar, Juraj ; Koudela, Pavel (oponent) ; Chalmovský, Juraj (vedoucí práce)
This thesis is focused on the use of the results of cone penetration tests and the method of transfer functions for the design of drilled large-diameter piles. The introductory part clarifies the theoretical basis of cone penetration testing, method of transfer functions, various material models and the regression coefficients in the nonlinear method of pile settlement calculation. The theoretical introduction will be followed by other chapters in which the theory is applied to specific practical cases. The third part consists of geotechnical interpretation of the results of two static load tests in two different localities using graphical and numerical outputs (limit load curves, force distribution along the length of the pile, dependences of displacements and deformations on the pile depth, shaft frictions and more). The next part deals with the evaluation of the CPT at the site of the load test and the compilation of the calculation profile at the site based on the obtained data. In the fifth part there will be an inverse analysis of load tests using the method of transfer functions in the software developed at the Institute of Geotechnics, Faculty of Civil Engineering, Brno University of Technology. An inverse analysis of load tests using finite elements method and obtained data from the CPT can be found in chapter 6. Within this analysis, several material models will be applied and compared to the issue. This analysis will be followed in the fifth part by a comparison of direct correlation methods for determining the ultimate pile shaft friction from CPT data with the results of inverse analysis by MTF to determine the most suitable method. Finally, from the obtained data the regression coefficients will be adjusted for the calculation of the second limit state of lone piles by a nonlinear method (according to Masopust).
Administrativní objekt Brno-Husovice
Karlík, Štěpán ; Kalivoda, Tomáš (oponent) ; Kalousek, Lubor (vedoucí práce)
Diplomová práce řeší novostavbu administrativní budovy v Brně-Husovicích. Budova je umístěna v proluce na ulici Dukelská třída. Stavba má čtyři nadzemní podlaží a podzemí hromadné garáže. 1NP je rozděleno na klidovou zónu a komerční část s pěti obchodními jednotkami. Ve 2NP a 3NP se nacházejí variabilní kancelářské prostory. Ve 4NP je umístěna strojovna vzduchotechniky. Konstrukční systém je monolitický železobetonový skelet. Objekt je zastřešen plochými vegetačními střechami. Základovou konstrukci tvoří velkoformátové vrtané piloty.
Stavebně technologická etapa založení haly s administrativním zázemím
Otrusina, Ondřej ; Nečasová, Barbora (oponent) ; Diaz, Yvetta (vedoucí práce)
Předmětem této bakalářské práce je řešení technologických postupů při zakládání skladovací haly s administrativním zázemím ve Vracově. Práce se bude zabývat technologickými předpisy vrtaných pilot a základových konstrukcí. K předpisům jsou vypracovány kontrolní a zkušební plány, návrh strojní sestavy, rozpočet a časový plán. Tato práce dále obsahuje koordinační situaci stavby, zásady organizace výstavby a návrh zařízení staveniště. Řešena je i bezpečnost a ochrana zdraví při práci s výčtem rizik a způsobu jejich eliminace.
Utilization of cone penetration tests in the load-transfer method for bored large diameter piles
Štetiar, Juraj ; Koudela, Pavel (oponent) ; Chalmovský, Juraj (vedoucí práce)
This thesis is focused on the use of the results of cone penetration tests and the method of transfer functions for the design of drilled large-diameter piles. The introductory part clarifies the theoretical basis of cone penetration testing, method of transfer functions, various material models and the regression coefficients in the nonlinear method of pile settlement calculation. The theoretical introduction will be followed by other chapters in which the theory is applied to specific practical cases. The third part consists of geotechnical interpretation of the results of two static load tests in two different localities using graphical and numerical outputs (limit load curves, force distribution along the length of the pile, dependences of displacements and deformations on the pile depth, shaft frictions and more). The next part deals with the evaluation of the CPT at the site of the load test and the compilation of the calculation profile at the site based on the obtained data. In the fifth part there will be an inverse analysis of load tests using the method of transfer functions in the software developed at the Institute of Geotechnics, Faculty of Civil Engineering, Brno University of Technology. An inverse analysis of load tests using finite elements method and obtained data from the CPT can be found in chapter 6. Within this analysis, several material models will be applied and compared to the issue. This analysis will be followed in the fifth part by a comparison of direct correlation methods for determining the ultimate pile shaft friction from CPT data with the results of inverse analysis by MTF to determine the most suitable method. Finally, from the obtained data the regression coefficients will be adjusted for the calculation of the second limit state of lone piles by a nonlinear method (according to Masopust).
Stavebně technologická etapa založení haly s administrativním zázemím
Otrusina, Ondřej ; Nečasová, Barbora (oponent) ; Diaz, Yvetta (vedoucí práce)
Předmětem této bakalářské práce je řešení technologických postupů při zakládání skladovací haly s administrativním zázemím ve Vracově. Práce se bude zabývat technologickými předpisy vrtaných pilot a základových konstrukcí. K předpisům jsou vypracovány kontrolní a zkušební plány, návrh strojní sestavy, rozpočet a časový plán. Tato práce dále obsahuje koordinační situaci stavby, zásady organizace výstavby a návrh zařízení staveniště. Řešena je i bezpečnost a ochrana zdraví při práci s výčtem rizik a způsobu jejich eliminace.
Administrativní objekt Brno-Husovice
Karlík, Štěpán ; Kalivoda, Tomáš (oponent) ; Kalousek, Lubor (vedoucí práce)
Diplomová práce řeší novostavbu administrativní budovy v Brně-Husovicích. Budova je umístěna v proluce na ulici Dukelská třída. Stavba má čtyři nadzemní podlaží a podzemí hromadné garáže. 1NP je rozděleno na klidovou zónu a komerční část s pěti obchodními jednotkami. Ve 2NP a 3NP se nacházejí variabilní kancelářské prostory. Ve 4NP je umístěna strojovna vzduchotechniky. Konstrukční systém je monolitický železobetonový skelet. Objekt je zastřešen plochými vegetačními střechami. Základovou konstrukci tvoří velkoformátové vrtané piloty.

Chcete být upozorněni, pokud se objeví nové záznamy odpovídající tomuto dotazu?
Přihlásit se k odběru RSS.