National Repository of Grey Literature 110 records found  beginprevious91 - 100next  jump to record: Search took 0.01 seconds. 
Construction and technological project of the manufacturing hall in Valašské Meziříčí
Pobořil, Petr ; Dvořák, Jan (referee) ; Novotný, Michal (advisor)
In my diploma thesis I solved construction and technological project of the manufacturing hall in Valašské Meziříčí. In my final thesis I focused on reinforced concrete structure for manufacturing press. For tis construction I processed technological prescription, control and test plan, budget, scheldule and assembly detail. Further I wrote up financial plan and scheldule for whole building, hazards in the workplace plan, proposal machinery, budget and scheldule for main building, site equipment project. In my final thesis, I have also dealt with solving transport roof girder on building site.
Precast load-bearing reinforced concrete structure
Lyčka, Lukáš ; Kraut, Jan (referee) ; Šulák, Pavel (advisor)
The aim of this thesis is to design main parts of the construction for concrete sports hall made from prefabricated elements. Designed elements are T-shaped prestressed roof truss, columns, slabs and continuous girders. This thesis contains engineering report, calculations and drawings of the designed parts.
Adaptation and modification of the industry hall
Benda, Lukáš ; Hejl, Jaroslav (referee) ; Klusáček, Ladislav (advisor)
The master’s thesis is focused on a design of reinforced concrete refabricated skeleton of the industrial hall. Object of the design are two internal traverse frames of the hall which consists of reinforced concrete truss, columns, girder and concrete flat foundation. Thesis includes working-out of static calculation, elaboration drawings of shape, reinforcement of solved elements and evolvement of assembly drawings. The rest of the project parts are not analyzed.
Fire Station Prague - Planning and Realization of the Construction
Revús, Adam ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
This written essay is about construction and technological preparation same as actual realization of building the Fire rescue station in Prague. The structure of this essay is actually a copy of the task structure and includes all points listed in the appendix
Constructive technological project of reconstruction
Tacina, Marek ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The subject of my thesis is to implement the gross carrying construction of the new bakery Karlovy pekarny in Židlochovice. In this paper dealt with the technical report, the situation of buildings, building equipment, budget, schedule, technological procedure of construction (bored piles and assembled skeleton), mechanical design and assembly KZP.
Multifunction sports hall
Nacházel, Jakub ; Burianová, Lenka (referee) ; Smolka, Radim (advisor)
This master’s thesis deals with the design documentation multifunction sports hall. The building is situated in the region in the Vysočina village Humpolec, cadastral district Humpolec. The building is designed as a prefabricated skeleton, where the vertical load-bearing structures are designed from the prefabricated skeleton of PREFA BRNO and filling and partition walls of the structural system POROTHERM and BTB fittings. Horizontal structures are formed by the supporting elements prefabricated skeleton system of PREFA BRNO and ceiling panels SPIROLL. The main single-storey multifunction hall is roofed with wooden trusses of curved from glued laminated timber and purlins carrying roof deck. The other part of the building is covered with flat single-ply roofs. The building is divided into a main single-storey multifunction sports hall and an outbuilding with facilities for athletes and spectators about two floors above ground and a third technical floor. The building is solved as barrier-free.
Prefabricated concrete structure
Šimon, Jan ; Šulák, Pavel (referee) ; Bažant, Zdeněk (advisor)
The master thesis is about a design of supporting structure of prefabricated skeleton hall. The major part of a design are an internal trasverse and longitudinal frames, which contents roof reinforce concrete truss, columns, beam and ceiling joists. All the load acting to the bearing structure is transferred to the prefabricate footing made of reinforce concrete. Other parts of the bulding are not solved in this thesis. The content of the thesis consists of an assembly drawing of parts of the skeleton and the static calculation according to the actual international standards. The output of each static calculation is drawing of a shape of part and its reinforcement.
Administrative grounds in Prague - Hostivař, preparation and organization of building construction
Smolková, Pavlína ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
Final work is processed for an administrative center in Prague. It is the preparation and organization of the construction of the object in Hostivař. The work is done for the most important technological phases of site equipment, economic comparison of cranes, financial and time evaluation of building, selection of main mechanisms and main part of the text dealing with the character of the building, its technical data, process of constructing the object and the overall treatise about building. Technological process is made for the technological phase of construction of assembled skeleton.
Concrete skeleton construction
Dvořák, Tomáš ; Novotný,, Petr (referee) ; Šulák, Pavel (advisor)
The master’s thesis is focused on a design of reinforced concrete prefabricated skeleton of the sports hall. Object of the design is internal traverse frame of the hall which consists of reinforced concrete prestressed truss, columns and concrete pile construction of foundation. Thesis includes working-out of static calculation, elaboration drawings of shape, reinforcement of solved elements and evolvement of assembly drawings. The rest of the project parts are not analyzed.
Technological phase gross superstructure assembled house
Stehlík, Jakub ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
Subject of this bachelor´s thesis is the upper gross production technology of family house in Bílovice nad Svitavou. This work contain technical reports, site family house, device of construction site, technological provisions, overal results, timetable, machine set design, monitoring and test plan, occupational safety.

National Repository of Grey Literature : 110 records found   beginprevious91 - 100next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.