|
Production technology of the pivotably head cover
Uličný, Roman ; Kolář, Ladislav (referee) ; Osička, Karel (advisor)
This bachelor thesis deals with the production technology of the part of a set assigned by the customer in the engineering company focusing on a unit production. The assigned unit is produced on four machines: saw, lathe, vertical three-axis milling machine with adjustace fourth axis and console milling machine. The manufacturing process is mainly supported by CAD/CAM softwares Spaceclaim and Edgecam.
|
| |
|
On the production technology of a specific part
Kalina, Adam ; Slaný, Martin (referee) ; Píška, Miroslav (advisor)
This document describes the design of new production technology specific part in an engineering company. The specific part is manufactured on a machining center by milling method. To create model was used SolidWorks software and to create CNC program was used SolidCAM program. There is production process created with new and old technologies. There is a comparison of both technologies in conclusion.
|
|
Technology of production part body of flap
Keprt, Michal ; Mouralová, Kateřina (referee) ; Osička, Karel (advisor)
The goal of the work is to design the manufacturing process of the flap closure body weldment, which is to be produced with company Sevcik - Water Equipment Ltd. First, the flap closure is modelled with the 3D SolidWorks, according to technical documentation from the company. Furthermore, the welded construction has been analysed. In this work, the body weldment production technology and complete fabrication technological process of individual components and final assembly is described. The technical and economic evaluations are calculated and the cost of production has been quantified. The production of individual components, machining costs, and other relevant costs are included into the consideration. These calculations predict a compatible production.
|
|
Technology of production case of delay
Janošek, Martin ; Kalivoda, Milan (referee) ; Osička, Karel (advisor)
In this master´s thesis is after first part, which is study explosions and detonators work, solutions to technology of production case of delay. First is anatomize technology of construction where is solve the form of stock and material from which the case of delay should be produce. Next capitol is about the ways of production of this part. The output of the thesis is complete production processes at all levels of detonators and selection of machine according to technical and economical aspects.
|
|
Solution Technology for Manufacturing "Slats"
Lamich, Štěpán ; Jaroš, Aleš (referee) ; Kalivoda, Milan (advisor)
The bachelor thesis deals with a technology problem of the blind slat production. The work describes the slat production in the automatic rolling mill TPLv4 made by ISOTRA a.s. It aims to find the critical point of the production and suggest a new manufacturing technique/procedure. In conclusion, the thesis evaluates the proposed manufacturing procedure from technical and economical point of view.
|
|
Solution technology multiple groove guide pulley to circular saw.
Koryčan, Jiří ; Osička, Karel (referee) ; Kalivoda, Milan (advisor)
The project developed within the bachelor's degree by the pulley multiple groove design of the technology for desktop performance circular saws. The design work is finished the production of components for the piece and batch production, the choice of the intermediate processing and description of manufacturing operations, including tools used for the single and series production, production design work for production and evaluation of the proposed variants of the production. This thesis has been developed on the basis of the theoretical knowledge gained while studying at the Faculty of Mechanical Engineering in Brno and personal experiences.
|
| |
| |
| |