National Repository of Grey Literature 46 records found  beginprevious37 - 46  jump to record: Search took 0.01 seconds. 
Managerial Evaluation of the Preparation for Construction of the Pond
Hronová, Monika ; Syrovátka, Oldřich (advisor) ; Žižka, Martin (referee)
The thesis disserts the decision making during the construction of a pond as water management source mainly focused on pre-implementation phase and the associated financial costs, from the decision of investor (builder), through appropriate site selection, to project preparation and selection of the contractor. The thesis marginally mentions the realization of the construction in terms of financial costs. In the practical part of the thesis, there is simplified procedure for pre-implementation phase, qualified estimate of the financial costs and the thesis also focuses on the selection of contractors and conditions that are related to the selection. The main contributions of the thesis is to introduce the issue of water management pre-implementation phase of construction of a pond, the procedure and conditions for decision to build a pond by the investor or hired individuals by the investor. Another practical part presents the percentage appreciation of the construction as a whole, which is divided into the costs associated with the appropriate site selection, project documentation, as well as costs associated with the purchasing of land and the cost of the construction itself. The results of this analysis showed that the avarage financial cost of 1 ha are 1,93 mil CZK. The main finding is that under these financial information is not easy to decide, because even two ponds with the acreage of 3,5 ha could have different budget, depending on the different local conditions. The guiding elements are particularly choice and suitability of the site for the construction. The final finding is, that the financial budget of the whole construction is divided into several parts. The part of pre-implementation, where is included the costs of site selection, land purchasing and project documentation, which is 9,4% of the total cost. The remaining 90,6 % of the cost is spent on the construction, which, based on the financial analysis, is the most costly.
Dopady ekonomické krize v sektoru stavebnictví ČR
Dvořáková, Zuzana
This diploma thesis deals with the effects of the economic crisis in the construction industry in the Czech Republic during the years from 2002 to 2012. The aim is to verify the impact of the economic crisis on selected indicators in construction sector. The analysis is focused on the number of construction contracts, the number of building permits, the number of approved housing constructions , but also on employment and average wages in the construction industry. For selected models, the predictions of future observations in the years 2013 and 2014 are made. In conclusion, the recommendations for the development of this sector is formulated.
Line constructions in selected EU countries: Study 5.300
Pulda, Jan ; Syllová, Jindřiška
Práce se zabývá procesem přípravy a povolování významných liniových staveb. Autoři dochází k závěru, že všechny uvedené státy upravují, ve srovnání s běžným stavebním řízením, zvláštním způsobem přípravu a povolování velkých liniových staveb. V žádném z analyzovaných států však neexistuje komplexní úprava určená společně pro všechny druhy liniových staveb.
Fulltext: Download fulltextPDF
Project of the local road to the new house-building in the locality "U Vodních zdrojů" (the village Olešnice).
KOCÁBKOVÁ, Martina
The aim of my work is to study two variants of local road that will create links to the new house-building in the locality "U Vodních zdrojů", in the village Olešnice. I have worked out the preferable alternate into the stadium of documentation for building licence. The route is chosen to ensure accessibility of the site and to minimize earthwork. In the project, I respected the norms and technical regulations.
The project of the field road reconstruction and modernization with the use of technological equipment for Glorit application.
TÍKOVÁ, Stanislava
The purpose of the thesis was project a field road to reconstruct and modernize the current traffic connections between selected villages Sviny and Borkovice, using technology for application of Glorit. It was created reinforced major field road with turnouts the design category of P 4,5/30. Studies of the field communication were prepared in two different variants. The beginning of routes is in the village Sviny and end is in the village Borkovice. Both variants are connected to the current road. After the consultation with the executive of the thesis, one of the variants was evolved for building licence documentation. The documentation consists of plans and manual. Emphasis was placed mainly on routes to achieve fluency with regard to appropriate and sensitive integration of the field road to the countryside. There was also an effort to minimize earthwork and associated financial intensity of construction. The project of the field route was prepared in conformity with applicable national standards (DIN) and technical regulations that relate to the issue.
Reconstruction project of a rural road network
KUDRLOVÁ, Květa
A theme of my thesis has been reconstruction project of a rural road network in two alternates. The project must respect valid norms and legal regulations. A lokality is found between two villages in Southern Bohemia, Olešník and Nová Ves. I have worked out the preferable alternate into the stadium of documentation for building licence. Rural road line has projected that way that the trafic situation will be better. Output of my theme is documentation for building licence.
Draft layout of versatile production facility in the village of Dolní Bukovsko, České Budějovice district.
BLAŽEK, Martin
This diploma thesis addresses the layout of a universal factory building at a site on the development plan of the village of Dolní Bukovsko. At the beginning, the thesis deals with two design options. Subsequently, the project documentation of the universal factory building has been prepared for the building permit issue to the extent required for the declaration of a simple construction pursuant to Decree No. 499/2006 Coll. on building documentation. The project reflects the current requirements for the installation of modern production technologies, the economic aspect of minimum building investment costs, and the operating costs optimization of the given production in a medium-sized factory building.
A project of complex reconstruction of family house.
TESAŘOVÁ, Věra
The aim of diploma work is to analyse condition of family house builded in the 1960s and to consider various alternatives of its reconstruction with reference to costingness and required facilities of the house. The reconstruction of this house is processed in three variants. The optimal alternative for investor is soluted in detail.

National Repository of Grey Literature : 46 records found   beginprevious37 - 46  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.