National Repository of Grey Literature 46 records found  beginprevious37 - 46  jump to record: Search took 0.01 seconds. 
The warehouse in Polna - rough upper construction
Chroustovský, David ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
This work includes a step of rough upper construction of warehouse in Polná. Part of this work is the construction and technology report, technical report of site facilities, design of mechanical assemblies, technological prescription for ferroconcrete skeleton, technological prescription for sandwich panel cladding, a report on the wider transport relations, a report on the protection of health and safety on site. Attachments include drawings of building equipment, layout scheme cargo trailers, assembly diagrams, calculation of weight trailers, routes wider transport relations, budget and schedule.
Extension of the gym - preparation and organization of construction
Langrová, Petra ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with the solution of selected parts of the architectural and technological project of the extension of the gym in Krnov, focusing on realization prefabricated reinformed concrete frame and roof deck. For these technological steps the control and test plan and health and safety will be prepared. For complet object SO 03 the schedule, budget, mechanical assambly, principles and organization of construction will be prepared.
Department store Mohelnice - construction technological project
Sovová, Romana ; Zálešák, Vít (referee) ; Biely, Boris (advisor)
The diploma thesis deals with construction technological project of department store in Mohelnice town – hypermarket Kaufland. It compiles in detail the most optimal proposal of technological construction process, working machinery, traffic proposal for transport, construction site equipment, schedule of work, inspection and test plan, safety of work, environment, and finally costing including bill of quantities etc. The thesis deals specifically main building object SO04, object of hypermarket, which is consisted of prefabricated reinforced concrete skeleton of single-storey building. I focus primarily on realization of gross building.
Production hall of toolmaking company TOKOZ - Construction and technology project
Chytal, Roman ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions construction production hall toolmaking of company TOKOZ,a.s. in Žďár nad Sázavou. This thesis contains technical report, construction site equipment project, time and financial plan, bill of quantities, technology study of the major technology stages, mechanical assembly design, technological specification, quality inspections and risks in the implementation of ground works.
CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING
Dvořák, Jan ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
Master thesis and building technology solutions transshipment point in Prostejov covers technological studies throughout the construction, distribution structures on buildings, machinery equipment, time and financial plan. Furthermore, the thesis further focuses on one main structures of the whole building, object transshipment point. On this construction project is further developed such documentation and other documents that complement and prescribe requirements for faster, easier, safer, better and more technologically correct implementation of this phase.
Self service shoping centre - construction technological project
Prusková, Nikola ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the construction technological project of a self-service shopping centre in Stará Plesná village. Time and finance plan, design of machinery and project of building site accessories were elaborated. The work is focused on the main building object SO 101 (Shopping and service centre). For this building pile foundations and top coarse building phase were worked out in greater details. Time plan, item budget and other documents concerning building preparations of object SO 101 are also parts of the work.
High-rack storage area SPO - selected parts of CTP
Juřica, Karel ; Mesiarkin, Jan (referee) ; Kantová, Radka (advisor)
Master thesis high-rack storage area spo - selected parts of ctp covers technological studies throughout the building, the construction division, building and engineering structures, preparation of normal technology, mechanical engineering time and financial plan. Also master thesis focuses more on building a major object of the building, which is the storage, dispatch and administrative part of high-rack storage area spo. Building on this subject is further developed such documentation and other documents that complement and prescribe requirements for faster, easier, safer, better and technologically accurate realization of this phase.
GYM Třebíč-SELECTED PARTS OF THE CTP
Rusínová, Alena ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The tesis is focused on building a new elementary school gym Třebíč, Horka-Domky, Václavské nám. 44/12. In addition to the new building itself is considered a gym and the construction of the connecting neck between the existing elementary school building andnew construction including reconstruction of the gym space newly connected corridor. Solves problems of selected parts of the building and technological project, which are: technical report, coordination situation, the financial plan of the building, site equipment oftechnological stages, a stage of construction schedule and itemized, use machines, technological regulations mounted skeleton and sports flooring, inspection and test plan, budget construction and plan for safety and health at work.
Solution gross superstructure production facility in Lanškroun
Komenda, Tomáš ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis processes construction-technological procedure of selected technological stages of rough upper construction of a production hall belonging to SCHOTT ČR, s.r.o. in Lanškroun. This is the extension of the single-storey hall intended for industrial production. The subject is the processing the procedure of assembly of the assembled ferroconcrete skeleton and cladding by facade panels Kingspan including the load-bearing structure of the surface.The work includes the individual design of the facade, a technical report, technological regulations of the selected stages of the construction, the organization plan and site facilities including drawings, budget and timetable, inspection and test plans, draft report, and also the machinery safety and health protection at work. An additional part of the solution is the issue of the oversized transport, including solutions to the critical points of the route.
Warehouse extension in Polička - stage of carcass superstructuree
Herben, Tomáš ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The content of this work is warehous extension in Polička concrete implementation of carcass superstructure. This tesis contains construction and technology report, technological prescription, technology report of transportation, technology report of health and safety on the construction site. Budget, calculation and time planning, inspection and test plan and description of transport relations.

National Repository of Grey Literature : 46 records found   beginprevious37 - 46  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.