|
Office Building
Žák, Jan ; Burianová, Lenka (referee) ; Smolka, Radim (advisor)
The Master’s thesis Office building is compiled in the form of project documentation witch comprises all the requisites required by current regulations. The designed building is placed on the sites numbered 2589/1 in Litomerice. This is a new building withoutbasement with four floors. The house is rectangular in plan, built of precast reinforced concrete frame system with infill masonry and roofing flat roof monotube roofing.
|
| |
| |
|
The family house in Chudenice
Korbel, Tomáš ; Krupica, Roman (referee) ; Šuhajdová, Eva (advisor)
The batchelor thesis Family house in Chudenice is procesed as a project documentation, including all requisites acording to valid legislativ. The designed house is placed at parcel number 1278/5 – cadastral area Chudenice. It is two floors newly built family house without basement. The house has a shed roof and it´s made of comprehensive building system of large format components made of cross-laminated solid wood (CLT – cross-laminated timber)
|
|
Detached House with Stained Glass Studio
Ruszová, Veronika ; Blažek, Petr (referee) ; Fišarová, Zuzana (advisor)
The bachelor thesis focuses on a family house and a workshop.The family house is designed as a new two-floor building without a cellar. The workshop is designed as a new one-floor building without cellar. The buildings will be placed on foundational zones with additional foundational panel. Perimeter supporting and inner supporting walls are constituted by sand-lime bricks SENDWIX 8DF-LD. Ceiling ceramic construction KMB MIAKO is used above the whole first floor. Above the second floor is the roof construction made up from wooden tie beams G-N, which serve as ceiling as well. The roof of the workshop is made from wooden tie beams G-N. The staircase leading from the first to the second floor is made out of reinforced concrete.
|
|
Family house
Žák, Jan ; Ing.Jitka Spáčilová (referee) ; Spáčil, Miroslav (advisor)
The bachelor project Family house is compiled in a from of project documentation which comprises all the requisites required by current regulations. The designed house is placed on the sites numbered 497/8 in village Liběšice. This is a new building without basement with two floors. The house has an irregular floor plan, is built from the system POROTHERM and is covered with a gable roof.
|
|
Analysis of Economic Risk of the Construction Project
Bokorová, Martina ; Götzová,, Dagmar (referee) ; Korytárová, Jana (advisor)
This thesis deals with the risk analysis and risk management of a construction project, their detailed characteristics and classification. In the practical part, knowledge and findings from the theoretical part are applied to a project aimed at the reconstruction and completion of an indoors swimming pool in the town Kuřim. In the course of the risk analysis assessment, important information on the project were given, furthermore, risks were identified, the intensity of their impact and likelihood of their development was established, and measures to reduce the risks were recommended.
|
|
The detached house with two housing units
Červená, Hana ; Bucňáková, Hana (referee) ; Utíkalová, Ivana (advisor)
The theme of the bachelor´s thesis are a design and mainly a project documentation of a detached house with two housing units in Zlín. The building consists of two aboveground floors and a basement, where garages for both flats are situated. Beside the own project documentation an architectural study and an essay are also parts of the thesis.
|
|
Management of Construction Projects
Solnický, Marek ; Horňák, Miloš (referee) ; Waldhans, Miloš (advisor)
The subject of the diploma thesis "Management of Construction Projects" is a description of the management process and its' application to a model case. The first part deals with the theoretical structure of project management, construction management and construction project delivery methods. The second part applies the theoretical knowledge to a concrete construction project. Primarily, the benefit analysis is performed for the chosen project delivery methods. Subsequently, the personal proposal for the management process is developed, which incorporates organizational, time, cost, quality and risk components of the project. Finally, the model construction project. is summarized and assessed.
|
| |