National Repository of Grey Literature 156 records found  beginprevious21 - 30nextend  jump to record: Search took 0.01 seconds. 
Construction technological project of sports hall construction
Tkáč, Jiří ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.
The polyfunctional house
Fiala, Pavel ; Sedlák, Radek (referee) ; Benešová, Romana (advisor)
Subject matterś thesis is elaborate a project documentation for structural permission for a multi-functional building. Object is situated on the outskirts of town Třebíč. The property is slightly sloped to the south side. The basisc are made from contrete strips. The grand plan of the house consists from rectangles. The house is made by a brick technology of a ceramic blocks. The building is roofed with mono-pitched roofs.
Implementation of Superstructure of Kindergarten in Zásada
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this thesis is technological solution of rough structure of kindergarden in Zasada village. The thesis includes technological report, site acommodation, technological directives for walling and monolithic ceiling structure, control and test plan, draft of machinery setup, solution of wider traffic problems, draft of safety and health during work and difference between truck crane and tower crane. Time plan, budget, drawing of boarding solution are also included in this thesis.
Realization of rough superstructure of restaurant in Čeladná
Mézl, Petr ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
Bachelor’s thesis deals with technological solution of rough superstructure of restaurant in Čeladná. Within this thesis was compiled technical report, technological specification for walling from calcium silicate masonry, site equipment, mechanical assembly, inspection and test plan, technology report of health and safety on the construction site. Budget, calculation and time planning, a drawing of the facilities of the construction site and details.
Construction technological project of polyfunktion house with block of flats
Hromník, Lukáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
Construction technological project of polyfunctional flat house SO 107, solves the realization of reinforced concrete monolithic ceiling construction the financial and time schedule, technological instruction of concreting, proposal of mechanization, the technical report of technology construction project. The proposal formwork system Multiflex.
Technological phase of the cover ground object
Fatura, Josef ; Čech, David (referee) ; Henková, Svatava (advisor)
Thesis resolves civil technological stage of the roofing of the administrative buildings and warehouse halls in the Grand River. It deals with the structure, roof insulation, nekrokevní, klempířskými and povlakovou-covering elements. The work contains technology rules, a statement of the Bill, the timetable, drawings and other technological documentation stage.
Multifunctional Building
Dostálek, Tomáš ; Matějková, Jana (referee) ; Sukopová, Dáša (advisor)
Subject matterś thesis is elaborate a project documentation for structural permission for a multi-functional building. Object is situated on the outskirts of town Nasavrky. The terrain is slightly sloping to northeast. Around the land was made a geological survey. The basisc are made from contrete strips. The grand plan of the house consists from one rectangle. The house is made by a brick technology of a ceramic blocks. The external walls are insulated by contact insulating system. The building is roofed with single-layer flat roof.
Clever building site
Havlena, Šimon ; Nováková, Jana (referee) ; Biolek, Vojtěch (advisor)
Site equipment is summary of all objects and equipment located on building site to ensure the cost-effective execution of construction and assembly works and to meet the social and sanitary needs of workers. The Bachelor thesis deals with modern approaches of building site equipment and the main objective of the Bachelor thesis is to assess the benefits of a smart building site.
Primary school in Vinoř - Gross construction
Hanzlík, Vlastimil ; Patloka, Jiří (referee) ; Biely, Boris (advisor)
This bachelor thesis focuses on the technological stage of the gross construction of Vinoř Primary School. The thesis consists of a technical report of a construction and technological project, design of a building site, mechanical assembly, broader relation of the transport routes, technological regulation for cast-in-place reinforced concrete construction, inspection and test plan, health and safety at work, environmental protection and comparison of sloped and supporting excavations. Furthermore, the thesis includes also an itemized budget and time schedule.
Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc
Garláthy, Michal ; Novotný, Michal (referee) ; Mohapl, Martin (advisor)
The theme of this diploma thesis are the Selected Parts of Building and Technological Project for Football Tribune of Ander Stadium in Olomouc. The content of this diploma thesis is the technological process of assembly of the building bearing construction of prefabricated concrete elements, the budget, the inspection and the test plan, the issue of safety and health at the construction site, the project concerning the construction site installation, the mechanical assembly, assessment of tower crane, object time and financial plan, construction technology study and the construction timetable.

National Repository of Grey Literature : 156 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.