National Repository of Grey Literature 145 records found  beginprevious135 - 144next  jump to record: Search took 0.01 seconds. 
Management of the Construction Project
Filipčíková, Petra ; Hanzlíček,, Jindřich (referee) ; Waldhans, Miloš (advisor)
This thesis is concerned with managing the construction project. The theoretical part is focused on the definition of the project life cycle, scheduling and its tools. The second part is the practical part, deals with the application of project management firm ZemiBau Ltd. in particular organizational structure construction, responsibility matrix, selection of subcontractors and time management through the construction schedule. The Company made several major changes before completion. In conclusion of this section are designed to define schedules and planning in various software and subsequent evaluation.
The implementation phase of gross upper structure of a department store
Jahodová, Martina ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
This bachelor’s thesis comprises realization of a technical construction phase of the upper department store in Valašské Meziříčí. Thesis contents of a technological procedure of installing a load-bearing construction and roofing of the building, a construction site technical report, a concept of mechanical assemblies, an inspection and test plan, a statement of measures, a bill of quantities, a timetable, an occupational safety and environmental protection.
Conversion of agricultural building into a home for the elderly in the village Dubné
Hamerníková, Veronika ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The aim of this bachelor´s thesis is solution of rehabilitation in rebuilding and building modification of agricultural building into old people´s home in Jaronice, which is part of village Dubné. Components of this thesis are technical report of equipment of building site, technological directives of building rehabilitation, control and test plans, proposal of technological directive, plan of safety and health protection during labour activity, environmental plan, budget and working timetable.
Demonstration Motosalon - technological phase coarse upper construction
Valouch, Ondřej ; Mesiarkin, Jan (referee) ; Henková, Svatava (advisor)
The subject of my bachelor thesis is creation of carcass superstructure on Motosalon showroom in Ostrava, and time-economical comparison of monolithic and prefabricated construction technology. This thesis deals with the technological regulations for concrete monolithic construction and installation of prefabricated elements. It also contains a technical report, technical report of a building site, a draft of mechanical reports, construction timetables, itemized budgets, plan of inspections and examinations, environmental plan of the building, work safety, precast export plan, the solution of transport routes, the situation and site equipment for both technologies.
Management of Building Order
Šeda, Radim ; Špiroch, Michal (referee) ; Waldhans, Miloš (advisor)
The theme of my bachelors‘ thesis is the management of construction projects. The work is devided in two main parts: theoretical part and practical part. The theoretical part describes the basics of building contract. In the practical part was then described the whole process of a particular management contract to build a house.
Technological construction phase of the upper housing facility
Karel, Jaroslav ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
Subject of this bachelor´s thesis is the upper gross production technology of housing facility in Náchod. In this work are addressed technical report site facilities, machine set design, occupational safety, timetable, technological provision, monitoring and test plan and enviromental protection.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.
Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.
Timetabling on Business College
Marešová, Iva ; Jablonský, Josef (advisor) ; Skočdopolová, Veronika (referee)
This thesis deals with a creation of a timetable on Business College. In the first part the areas in which we can encounter scheduling are introduced, because timetabling undoubtedly belongs to scheduling tasks. Then the linear programming theory is explained. With its help a model for a timetable is made. The assignment problem, which forms a basis for timetable creation model, will be mentioned. We cannot imagine all that without the support of computers. That is why one chapter is dedicated to useable computer programs. The next chapter discusses didactics and its requirements for a good timetable. These requirements are then taken into account in an application chapter. Fundamental part of the thesis is the creation of the timetable for real Business College, taking into account all important conditions. At the end of this thesis a mathematical model is introduced which is suitable for creating timetables for twenty-four classes of this school.
Timetabling – Preparation of a timetable for school
Jeřábková, Eva ; Jablonský, Josef (advisor) ; Skočdopolová, Veronika (referee)
The aim of the thesis is to create a model of timetable for primary school for all teachers and classes so that the timetable is in compliance with all teaching plans, the conditions of the Ministry of Education, Youth and Sports (general education program), the school's needs and requirements of teachers. The timetable is created for a particular school, ZŠ nám. Svobody in Prague. The first part of the thesis is focused on the theoretical description of methods and procedures for dealing with the problem of timetable. The second part describes the elementary school, for which the timetable is made, it's classes, teachers and conditions of the tuition. It is also formulated and described a mathematical model of the problem that is solved by using the program Lingo.

National Repository of Grey Literature : 145 records found   beginprevious135 - 144next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.