National Repository of Grey Literature 73 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.
Prefabricated reinforced concrete hall of the shipping centre
Mejvald, Martin ; Švaříčková, Ivana (referee) ; Požár, Michal (advisor)
The subject of the master thesis is the design of a reinforced concrete prefabricated hall for an expedition centre. It is a one-storey hall with a two-storey extension for administration. The proposed structure has a rectangular plan with dimensions of 78,0 × 48,0 m and a height of 13 m. A column system is chosen as the supporting structural system. In the middle row of columns, every second column is skipped to create more space for storage inside the hall, so it is a two-column hall. The building is roofed with a pre-stressed gable truss which is supported on columns and trusses. The administrative part is roofed with SPIROLL ceiling panels. The whole structure is reinforced with longitudinal and transverse concrete stiffeners, the rigidity of the structure is also ensured by steel stiffeners. The structure was modelled in SCIA Engineer, the global model was used to determine the internal forces on the individual elements of the structure. The assessment of the elements was carried out by manual calculation, in the calculation program IDEA Statica and FIN EC. The drawings were created in Tekla Structures and Cadkon+ 2023. The selected load-bearing elements of the hall structure will be addressed in the thesis.
Public sport facility for ice sports Jihlava - gross superstructure
Vybíral, David ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
The thesis describes the realization of the ice rink for practice means realized in Jihlava. The target is a design of a constructional and technological proces of the gross superstructure with focus on precasted reinforced concrete columns of the skeletal system. The thesis, in detail, deals with the transport of precasts to the construction site, the process of installing the pillars, suggesting the appropriate machinery assembly, and suggesting protective equiptment for safety at work. Furthermore, the thesis also covers an itemized budget of the specified stage of construction, a timeplan, a suggestion of construction site facilities, economical comparhission of using a tower crane and a mobile crane, and also protecting the enviroment against negative effects of the construction.
Industrial building Load bearing RC structure
Vrána, Libor ; Girgle, František (referee) ; Šimůnek, Petr (advisor)
The Master´s thesis describes static analysis and design of reinforced concrete prefabricated of the production hall. Entering the work is to verify and dimension elements of structure.
Tribune of football stadium
Weber, Jozef ; Kostiha, Vojtěch (referee) ; Švaříčková, Ivana (advisor)
The aim of the diploma thesis was to design the precast reinforced concrete prefabricated structures of the football tribune. It was modernized sports center in Brno. According to the investor was determined the shape of the football tribune. It was compiled the design documentation. For the calculation of inner strengths was used the software Dlubal RFEM, which operates on the Finite Element Method - FEM. All elements have been designed for ultimate and serviceability limit state. My thesis contains textual part, inner strengths, static calculations, drawing documentation of composition of structure, drawing documentation of reinforcement and design documentation of the object.
BUT Area Kraví hora
Muroň, Jakub ; Dvořák, Miloš (referee) ; Nový, Alois (advisor)
The subject of this diploma thesis is to continue on the previous atelier work, which was focused on elaboration of a strategic urban-architectural study of the Kraví hora area and the BUT holding located there. A multifunctional facility, which would include activities that BUT still lacks, should be designed there. In any case, it should not be an extension of the teaching, research or accommodation capacities, since there have been built enough of these by BUT recently. At the same time, the proposed activities should not be controversial with the interests of the city. The BUT area at Kraví hora is one of the most valuable areas of the city of Brno. The city, which has tried to buy it from BUT several times, has an eminent interest in this area. However BUT considers it as its "family silver", because they realize its extraordinary value. Nevertheless, due to the binding regulatory conditions, construction possibilities are very limited. The aim of this study is to find such a use of this area, which would be a compromise corresponding to both the city's expectations and the needs of BUT. The intention of the previous project, which has been continued by this diploma thesis, was the removal of unsatisfactory buildings and the reduction of the garden colonies; despite to a study created by the City of Brno but partially kept, cultivated and reorganized; and rebuilding of the BUT area, which will be opened to the public and communicate with park. The public will obtain an access to nowadays inaccessible and impermeable areas by removing inappropriate buildings and fences, as well as by the modification of the public space and creating one major spine communication realized as an extension of the existing road and which will serve only for the supply, hikers and cyclists. The newly founded BUT complex with its strategic location on the top of Kraví hora hill and next to the observatory will invite large number of people not only from the surroundings but a
Static solution of prefabricated hall
Koníček, Jakub ; Koláček, Jan (referee) ; Zich, Miloš (advisor)
The presented thesis deals with design and optimization of selected structural elements of high-load storage hall skeleton. As a basis for the solution is taken the structure of a real storage hall designed in the years 2017-2018. The structure is designed for minimum weight. For this reason, so-called D-regions are formed on the structure. For the solution of D-areas, general methods of solution, such as STM or nonlinear FEM analyses, are used in the thesis. In the final designed structural elements are compared to the original design of the hall. Thesis include static calculation of 24 m long roof beam V1, static calculation of 24 m long ceiling beam ST1, drawing documentation and technical report. Programs were used for the calculation: SCIA Engeneer 18.1, Idea StatiCa Beam10.1, Idea StatiCa Detail 10.1, RIB Fermo, PTC MathCad and MS Excel.
The EPS factory, Unicov - carcassing construction
Ježowiczová, Barbora ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
Subject of this work is pursuance technology of reinforced concrete skeleton of production hall, especialy carcass/rough construction. This bachelor's thesis contains construction and technology report, technological prescription, technology report of plant building site, technology report of transportation, concept of mechanical assembly, inspection and test plan, technology report of health and safety on the construction site. Budget, calculation and time planning, a drawing of the facilities of the construction site, description of transport relations is included in addendum.
The implementation phase of gross upper structure of Silo Tower
Bittnerová, Lucie ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
This bachelor’s thesis deals with the solution of technology gross upper structure Silo Tower in Olomouc. The content of the work is realization of the main technological stages of this object. For the gross stage of the upper structure is processed design of site equipment, technological process for the implementation of prefabricated and monolithic concrete structures, schedule of work, itemized budget and mechanization plan.
Apartment building – selected design elements
Doupovec, Vojtěch ; Požár, Michal (referee) ; Perla, Jan (advisor)
The first part of the bachelor's thesis deals with the design of selected load-bearing elements of an apartment building, it is a balcony console, a prefabricated staircase and a ceiling structure above a typical floor. The second part is devoted to the assessment of the masonry walls of the building. The output is drawings of the shape and reinforcement of these load-bearing elements. The calculations were performed using SCIA Engineer 19.1, IDEA StatiCa and Microsoft Excel. The drawing documentation was processed by CAD software AutoCAD 2018 with graphic superstructure RECOC.

National Repository of Grey Literature : 73 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?